10,594 research outputs found

    Space Station Freedom data management system growth and evolution report

    Get PDF
    The Information Sciences Division at the NASA Ames Research Center has completed a 6-month study of portions of the Space Station Freedom Data Management System (DMS). This study looked at the present capabilities and future growth potential of the DMS, and the results are documented in this report. Issues have been raised that were discussed with the appropriate Johnson Space Center (JSC) management and Work Package-2 contractor organizations. Areas requiring additional study have been identified and suggestions for long-term upgrades have been proposed. This activity has allowed the Ames personnel to develop a rapport with the JSC civil service and contractor teams that does permit an independent check and balance technique for the DMS

    MORA: an Energy-Aware Slack Reclamation Scheme for Scheduling Sporadic Real-Time Tasks upon Multiprocessor Platforms

    Full text link
    In this paper, we address the global and preemptive energy-aware scheduling problem of sporadic constrained-deadline tasks on DVFS-identical multiprocessor platforms. We propose an online slack reclamation scheme which profits from the discrepancy between the worst- and actual-case execution time of the tasks by slowing down the speed of the processors in order to save energy. Our algorithm called MORA takes into account the application-specific consumption profile of the tasks. We demonstrate that MORA does not jeopardize the system schedulability and we show by performing simulations that it can save up to 32% of energy (in average) compared to execution without using any energy-aware algorithm.Comment: 11 page

    Promote-IT: An efficient Real-Time Tertiary-Storage Scheduler

    Get PDF
    Promote-IT is an efficient heuristic scheduler that provides QoS guarantees for accessing data from tertiary storage. It can deal with a wide variety of requests and jukebox hardware. It provides short response and confirmation times, and makes good use of the jukebox resources. It separates the scheduling and dispatching functionality and effectively uses this separation to dispatch tasks earlier than scheduled, provided that the resource constraints are respected and no task misses its deadline. To prove the efficiency of Promote-IT we implemented alternative schedulers based on different scheduling models and scheduling paradigms. The evaluation shows that Promote-IT performs better than the other heuristic schedulers. Additionally, Promote-IT provides response-times near the optimum in cases where the optimal scheduler can be computed
    corecore