    Deterministic Assembly Scheduling Problems: A Review and Classification of Concurrent-Type Scheduling Models and Solution Procedures

    Get PDF
    Many activities in industry and services require the scheduling of tasks that can be concurrently executed, the most clear example being perhaps the assembly of products carried out in manufacturing. Although numerous scientific contributions have been produced on this area over the last decades, the wide extension of the problems covered and the lack of a unified approach have lead to a situation where the state of the art in the field is unclear, which in turn hinders new research and makes translating the scientific knowledge into practice difficult. In this paper we propose a unified notation for assembly scheduling models that encompass all concurrent-type scheduling problems. Using this notation, the existing contributions are reviewed and classified into a single framework, so a comprehensive, unified picture of the field is obtained. In addition, a number of conclusions regarding the state of the art in the topic are presented, as well as some opportunities for future research.Ministerio de Ciencia e Innovación español DPI2016-80750-

    Improving just-in-time delivery performance of IoT-enabled flexible manufacturing systems with AGV based material transportation

    Get PDF
    Autonomous guided vehicles (AGVs) are driverless material handling systems used for transportation of pallets and line side supply of materials to provide flexibility and agility in shop-floor logistics. Scheduling of shop-floor logistics in such systems is a challenging task due to their complex nature associated with the multiple part types and alternate material transfer routings. This paper presents a decision support system capable of supporting shop-floor decision-making activities during the event of manufacturing disruptions by automatically adjusting both AGV and machine schedules in Flexible Manufacturing Systems (FMSs). The proposed system uses discrete event simulation (DES) models enhanced by the Internet-of-Things (IoT) enabled digital integration and employs a nonlinear mixed integer programming Genetic Algorithm (GA) to find near-optimal production schedules prioritising the just-in-time (JIT) material delivery performance and energy efficiency of the material transportation. The performance of the proposed system is tested on the Integrated Manufacturing and Logistics (IML) demonstrator at WMG, University of Warwick. The results showed that the developed system can find the near-optimal solutions for production schedules subjected to production anomalies in a negligible time, thereby supporting shop-floor decision-making activities effectively and rapidly

    Improving just-in-time delivery performance of IoT-enabled flexible manufacturing systems with AGV based material transportation

    Get PDF
    © 2020 by the authors. Licensee MDPI, Basel, Switzerland. Autonomous guided vehicles (AGVs) are driverless material handling systems used for transportation of pallets and line side supply of materials to provide flexibility and agility in shop-floor logistics. Scheduling of shop-floor logistics in such systems is a challenging task due to their complex nature associated with the multiple part types and alternate material transfer routings. This paper presents a decision support system capable of supporting shop-floor decision-making activities during the event of manufacturing disruptions by automatically adjusting both AGV and machine schedules in Flexible Manufacturing Systems (FMSs). The proposed system uses discrete event simulation (DES) models enhanced by the Internet-of-Things (IoT) enabled digital integration and employs a nonlinear mixed integer programming Genetic Algorithm (GA) to find near-optimal production schedules prioritising the just-in-time (JIT) material delivery performance and energy efficiency of the material transportation. The performance of the proposed system is tested on the Integrated Manufacturing and Logistics (IML) demonstrator at WMG, University of Warwick. The results showed that the developed system can find the near-optimal solutions for production schedules subjected to production anomalies in a negligible time, thereby supporting shop-floor decision-making activities effectively and rapidly

    Robust production planning and control for multi-stage systems with flexible final assembly lines

    Get PDF
    Production planning of final assembly systems is a challenging task, as the often fluctuating order volumes require flexible solutions. Besides, the calculated plans need to be robust against the process-level disturbances and stochastic nature of some parameters like manual processing times or machine availability. In the paper, a simulation-based optimisation method is proposed that utilises lower level shop floor data to calculate robust production plans for final assembly lines of a flexible, multi-stage production system. In order to minimise the idle times when executing the plans, the capacity control that specifies the proper operatorâtask assignments is also determined. The analysed multi-stage system is operated with a pull strategy, which means that the production at the final assembly lines generates demands for the preceding stages providing the assembled components

    Exact and heuristic approaches for lot splitting and scheduling on identical parallel machines

    Get PDF
    In this paper, we address a lot splitting and scheduling problem existent in a textile factory. The factory we study produces a set of products that are made of, or assembled from, a list of components. During production, each component can be split into one or several lots of different sizes and each lot will be produced independently on one of a group of identical parallel machines. We formulate the problem into a mixed integer programming model and develop a heuristic method to solve the model. The heuristic method is based on a network flow model with the objective to minimise the weighted sum of the total tardiness of products and the deviations occurred during production of each product. The deviation of a product is measured by the deviation of product completion time (the last component lot completion time) and completion time of the rest of components lots for the same product. We present computational results and performance measures of the network flow heuristic for a set of randomly generated instances based on real world data.(undefined

    Scheduling With Alternatives Machine Using Fuzzy Inference System And Genetic Algorithm.

    Get PDF
    As the manufacturing activities in today's industries are getting more and more complex, it is required for the manufacturing company to have a good shop floor production scheduling to plan and schedule their production orders. Industri pengeluarcim kini telah berkembang pesat dan aktiviti pengeluarannya semakin kompleks, dengan itu syarikat pengeluar memerlukan jadual lantai pengeluaran (shop floor) yang terbaik untuk merancang permintaan pengeluaran (product)

    A Survey of Recent Research on Optimization Models and Algorithms for Operations Management from the Process View

    Get PDF

    Flexible resources allocation techniques: characteristics and modelling

    Get PDF
    At the interface between engineering, economics, social sciences and humanities, industrial engineering aims to provide answers to various sectors of business problems. One of these problems is the adjustment between the workload needed by the work to be realised and the availability of the company resources. The objective of this work is to help to find a methodology for the allocation of flexible human resources in industrial activities planning and scheduling. This model takes into account two levers of flexibility, one related to the working time modulation, and the other to the varieties of tasks that can be performed by a given resource (multi–skilled actor). On the one hand, multi–skilled actors will help to guide the various choices of the allocation to appreciate the impact of these choices on the tasks durations. On the other hand, the working time modulation that allows actors to have a work planning varying according to the workload which the company has to face

    State dependent heuristic method of job shop scheduling

    Get PDF

    The 2-stage assembly flowshop scheduling problem with total completion time: Efficient constructive heuristic and metaheuristic

    Get PDF
    In this paper, we address the 2-stage assembly scheduling problem where there are m machines in the first stage to manufacture the components of a product and one assembly station (machine) in the second stage. The objective considered is the minimisation of the total completion time. Since the NP-hard nature of this problem is well-established, most previous research has focused on finding approximate solutions in reasonable computation time. In our paper, we first review and derive a number of problem properties and, based on these ideas, we develop a constructive heuristic that outperforms the existing constructive heuristics for the problem, providing solutions almost in real-time. Finally, for the cases where extremely high-quality solutions are required, a variable local search algorithm is proposed. The computational experience carried out shows that the algorithm outperforms the best existing metaheuristic for the problem. As a summary, the heuristics presented in the paper substantially modify the state-of-the-art of the approximate methods for the 2-stage assembly scheduling problem with total completion time objective