1,718 research outputs found
A Novel Approach to the Common Due-Date Problem on Single and Parallel Machines
This paper presents a novel idea for the general case of the Common Due-Date
(CDD) scheduling problem. The problem is about scheduling a certain number of
jobs on a single or parallel machines where all the jobs possess different
processing times but a common due-date. The objective of the problem is to
minimize the total penalty incurred due to earliness or tardiness of the job
completions. This work presents exact polynomial algorithms for optimizing a
given job sequence for single and identical parallel machines with the run-time
complexities of for both cases, where is the number of jobs.
Besides, we show that our approach for the parallel machine case is also
suitable for non-identical parallel machines. We prove the optimality for the
single machine case and the runtime complexities of both. Henceforth, we extend
our approach to one particular dynamic case of the CDD and conclude the chapter
with our results for the benchmark instances provided in the OR-library.Comment: Book Chapter 22 page
Scheduling Jobs in Flowshops with the Introduction of Additional Machines in the Future
This is the author's peer-reviewed final manuscript, as accepted by the publisher. The published article is copyrighted by Elsevier and can be found at: http://www.journals.elsevier.com/expert-systems-with-applications/.The problem of scheduling jobs to minimize total weighted tardiness in flowshops,\ud
with the possibility of evolving into hybrid flowshops in the future, is investigated in\ud
this paper. As this research is guided by a real problem in industry, the flowshop\ud
considered has considerable flexibility, which stimulated the development of an\ud
innovative methodology for this research. Each stage of the flowshop currently has\ud
one or several identical machines. However, the manufacturing company is planning\ud
to introduce additional machines with different capabilities in different stages in the\ud
near future. Thus, the algorithm proposed and developed for the problem is not only\ud
capable of solving the current flow line configuration but also the potential new\ud
configurations that may result in the future. A meta-heuristic search algorithm based\ud
on Tabu search is developed to solve this NP-hard, industry-guided problem. Six\ud
different initial solution finding mechanisms are proposed. A carefully planned\ud
nested split-plot design is performed to test the significance of different factors and\ud
their impact on the performance of the different algorithms. To the best of our\ud
knowledge, this research is the first of its kind that attempts to solve an industry-guided\ud
problem with the concern for future developments
Parameterized complexity of machine scheduling: 15 open problems
Machine scheduling problems are a long-time key domain of algorithms and
complexity research. A novel approach to machine scheduling problems are
fixed-parameter algorithms. To stimulate this thriving research direction, we
propose 15 open questions in this area whose resolution we expect to lead to
the discovery of new approaches and techniques both in scheduling and
parameterized complexity theory.Comment: Version accepted to Computers & Operations Researc
How the structure of precedence constraints may change the complexity class of scheduling problems
This survey aims at demonstrating that the structure of precedence
constraints plays a tremendous role on the complexity of scheduling problems.
Indeed many problems can be NP-hard when considering general precedence
constraints, while they become polynomially solvable for particular precedence
constraints. We also show that there still are many very exciting challenges in
this research area
- …