40 research outputs found

    A survey of scheduling problems with setup times or costs

    Get PDF
    Author name used in this publication: C. T. NgAuthor name used in this publication: T. C. E. Cheng2007-2008 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe

    A linear programming-based method for job shop scheduling

    Get PDF
    We present a decomposition heuristic for a large class of job shop scheduling problems. This heuristic utilizes information from the linear programming formulation of the associated optimal timing problem to solve subproblems, can be used for any objective function whose associated optimal timing problem can be expressed as a linear program (LP), and is particularly effective for objectives that include a component that is a function of individual operation completion times. Using the proposed heuristic framework, we address job shop scheduling problems with a variety of objectives where intermediate holding costs need to be explicitly considered. In computational testing, we demonstrate the performance of our proposed solution approach

    An Investigation of Order Review/Release Policies and Dispatching Rules for Assembly Job Shops with Multi Objective Criteria

    Get PDF
    AbstractThis work deals with the significant aspects of a simulation based experimental study of two shop floor control polices: order review/release (ORR) and dispatching rules for scheduling an assembly job shop in which multi-objective criteria is considered. A simulation of model of an assembly job shop which consists of one assembly work station with two machines and seven machining work stations with two machines in each work station is developed. Six dispatching rules and four ORR mechanisms identified from the literature are incorporated in the simulation model. Grey relational analysis is used for ranking the dispatching rule-ORR combinations. The performance measures considered in this study are mean flow time, mean tardiness and machine utilization. Simulation experiments have been conducted in an environment with products consisting of single level assembly structure, two level assembly structure and three level assembly job structures. The results indicate that Job Due Date rule with Interval Release policy performs better in comparison with the other dispatching rule- ORR combinations investigated in this study

    Production Scheduling Requirements to Smart Manufacturing

    Get PDF
    The production scheduling has attracted a lot of researchers for many years, however most of the approaches are not targeted to deal with real manufacturing environments, and those that are, are very particular for the case study. It is crucial to consider important features related with the factories, such as products and machines characteristics and unexpected disturbances, but also information such as when the parts arrive to the factory and when should be delivered. So, the purpose of this paper is to identify some important characteristics that have been considered independently in a lot of studies and that should be considered together to develop a generic scheduling framework to be used in a real manufacturing environment.authorsversionpublishe

    Serial-batch scheduling – the special case of laser-cutting machines

    Get PDF
    The dissertation deals with a problem in the field of short-term production planning, namely the scheduling of laser-cutting machines. The object of decision is the grouping of production orders (batching) and the sequencing of these order groups on one or more machines (scheduling). This problem is also known in the literature as "batch scheduling problem" and belongs to the class of combinatorial optimization problems due to the interdependencies between the batching and the scheduling decisions. The concepts and methods used are mainly from production planning, operations research and machine learning
    corecore