7,182 research outputs found

    Bulk Scheduling with the DIANA Scheduler

    Full text link
    Results from the research and development of a Data Intensive and Network Aware (DIANA) scheduling engine, to be used primarily for data intensive sciences such as physics analysis, are described. In Grid analyses, tasks can involve thousands of computing, data handling, and network resources. The central problem in the scheduling of these resources is the coordinated management of computation and data at multiple locations and not just data replication or movement. However, this can prove to be a rather costly operation and efficient sing can be a challenge if compute and data resources are mapped without considering network costs. We have implemented an adaptive algorithm within the so-called DIANA Scheduler which takes into account data location and size, network performance and computation capability in order to enable efficient global scheduling. DIANA is a performance-aware and economy-guided Meta Scheduler. It iteratively allocates each job to the site that is most likely to produce the best performance as well as optimizing the global queue for any remaining jobs. Therefore it is equally suitable whether a single job is being submitted or bulk scheduling is being performed. Results indicate that considerable performance improvements can be gained by adopting the DIANA scheduling approach.Comment: 12 pages, 11 figures. To be published in the IEEE Transactions in Nuclear Science, IEEE Press. 200

    Parameterized complexity of machine scheduling: 15 open problems

    Full text link
    Machine scheduling problems are a long-time key domain of algorithms and complexity research. A novel approach to machine scheduling problems are fixed-parameter algorithms. To stimulate this thriving research direction, we propose 15 open questions in this area whose resolution we expect to lead to the discovery of new approaches and techniques both in scheduling and parameterized complexity theory.Comment: Version accepted to Computers & Operations Researc

    Balancing Work and Family Responsibilities as an Extension 4-H Agent

    Get PDF
    A career with Extension can be very rewarding, but also very demanding, as employees have to balance job stress and time demands with family goals and demands. The very nature of Extension work brings some tension between the job and family, and employees need to be equipped to make decisions about personal and work time. If the Extension System is to be a leader of positive change for individuals, families and communities, its employees must be able to find that balance. Previous research with 4-H agents has identified 23 job responsibilities that were stressors, with some studies showing a direct relationship between Extension work and family problems. To build on these studies and establish the current situation among Extension agents with 4-H responsibilities in the Southern Region, this correlational study examined the relationships and differences between job characteristics and marital satisfaction, how agent characteristics directed those relationships, and what coping mechanisms agents used to ameliorate negative workamily interactions. The study instrument utilized the Locke-Wallace Marital Adjustment Test (LWMAT) to arrive at a global score that represented the distress level of the relationship for each agent. Demographic information and work-related information was also gathered from the agent responses to the instrument, and then used to develop relationships among variables. The findings of the study were that agents experience the stressors in similar ways and amounts, but their perceptions of those stressors and how they affect marital satisfaction differ. The group experiencing the stressors to the most detrimental level was the members of the “Sandwich Generation,” which include employees aged 35-54, and who find their careers sandwiched between raising children and caring for aging parents. They, along with other agents, need to employ numerous strategies to cope with the stresses they experience, including prioritizing, planning, and building a strong social support system as the top strategies
    • …
    corecore