53,554 research outputs found
Framework for sustainable TVET-Teacher Education Program in Malaysia Public Universities
Studies had stated that less attention was given to the education aspect, such as
teaching and learning in planning for improving the TVET system. Due to the 21st
Century context, the current paradigm of teaching for the TVET educators also has
been reported to be fatal and need to be shifted. All these disadvantages reported
hindering the country from achieving the 5th strategy in the Strategic Plan for
Vocational Education Transformation to transform TVET system as a whole.
Therefore, this study aims to develop a framework for sustainable TVET Teacher
Education program in Malaysia. This study had adopted an Exploratory Sequential
Mix-Method design, which involves a semi-structured interview (phase one) and
survey method (phase two). Nine experts had involved in phase one chosen by using
Purposive Sampling Technique. As in phase two, 118 TVET-TE program lecturers
were selected as the survey sample chosen through random sampling method. After
data analysis in phase one (thematic analysis) and phase two (Principal Component
Analysis), eight domains and 22 elements have been identified for the framework for
sustainable TVET-TE program in Malaysia. This framework was identified to embed
the elements of 21st Century Education, thus filling the gap in this research. The
research findings also indicate that the developed framework was unidimensional and
valid for the development and research regarding TVET-TE program in Malaysia.
Lastly, it is in the hope that this research can be a guide for the nations in producing a
quality TVET teacher in the future
Optimasi Penjadwalan Menggunakan Metode Algoritma Genetika di Sekolah Menengah Kejuruan Annuqayah - Sumenep
The problem faced by the Annuqayah Vocational School curriculum is the same schedule and is taught by the same teacher. Such problems are quite complex problems because they relate to the number of teachers available. The lesson schedule is presented in the form of day and class hours tables. The subject can be seen that every day schedule divided into time slots. Each time slot has a list of subjects taught by the teacher in a particular room. To optimize the lesson schedule in Annuqayah Vocational School, Genetic Algorithm is used. This algorithm is a computational approach to the principle of natural selection, Charles Darwin's theory of evolution and the theory of Mendel's inheritance [1]. The optimization process in Genetic Algorithms includes individual generation, evaluation of fitness values, determination of probability values, Roulette Wheel selection, crossover, mutations, and new individual generation. Scheduling optimization using the Genetic Algorithm approach was declared successful because it was able to find the right combination of scheduling with optimal fitness values in 10 attempts, and no violations of the established rules from the curriculum were found so that it could assist in the preparation of subject schedules in Annuqayah Vocational High School.Keywords: curriculum, Vocational High School, scheduling, Genetic Algorithm, optimization.
A survey on gain-scheduled control and filtering for parameter-varying systems
Copyright © 2014 Guoliang Wei et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.This paper presents an overview of the recent developments in the gain-scheduled control and filtering problems for the parameter-varying systems. First of all, we recall several important algorithms suitable for gain-scheduling method including gain-scheduled proportional-integral derivative (PID) control, H 2, H ∞ and mixed H 2 / H ∞ gain-scheduling methods as well as fuzzy gain-scheduling techniques. Secondly, various important parameter-varying system models are reviewed, for which gain-scheduled control and filtering issues are usually dealt with. In particular, in view of the randomly occurring phenomena with time-varying probability distributions, some results of our recent work based on the probability-dependent gain-scheduling methods are reviewed. Furthermore, some latest progress in this area is discussed. Finally, conclusions are drawn and several potential future research directions are outlined.The National Natural Science Foundation of China under Grants 61074016, 61374039, 61304010, and 61329301; the Natural Science Foundation of Jiangsu Province of China under Grant BK20130766; the Program for Professor of Special Appointment (Eastern Scholar) at Shanghai Institutions of Higher Learning; the Program for New Century Excellent Talents in University under Grant NCET-11-1051, the Leverhulme Trust of the U.K., the Alexander von Humboldt Foundation of Germany
Towards a Queueing-Based Framework for In-Network Function Computation
We seek to develop network algorithms for function computation in sensor
networks. Specifically, we want dynamic joint aggregation, routing, and
scheduling algorithms that have analytically provable performance benefits due
to in-network computation as compared to simple data forwarding. To this end,
we define a class of functions, the Fully-Multiplexible functions, which
includes several functions such as parity, MAX, and k th -order statistics. For
such functions we exactly characterize the maximum achievable refresh rate of
the network in terms of an underlying graph primitive, the min-mincut. In
acyclic wireline networks, we show that the maximum refresh rate is achievable
by a simple algorithm that is dynamic, distributed, and only dependent on local
information. In the case of wireless networks, we provide a MaxWeight-like
algorithm with dynamic flow splitting, which is shown to be throughput-optimal
Dynamic scheduling in a multi-product manufacturing system
To remain competitive in global marketplace, manufacturing companies need to improve their operational practices. One of the methods to increase competitiveness in manufacturing is by implementing proper scheduling system. This is important to enable job orders to be completed on time, minimize waiting time and maximize utilization of equipment and machineries. The dynamics of real manufacturing system are very complex in nature. Schedules developed based on deterministic algorithms are unable to effectively deal with uncertainties in demand and capacity. Significant differences can be found between planned schedules and actual schedule implementation. This study attempted to develop a scheduling system that is able to react quickly and reliably for accommodating changes in product demand and manufacturing capacity. A case study, 6 by 6 job shop scheduling problem was adapted with uncertainty elements added to the data sets. A simulation model was designed and implemented using ARENA simulation package to generate various job shop scheduling scenarios. Their performances were evaluated using scheduling rules, namely, first-in-first-out (FIFO), earliest due date (EDD), and shortest processing time (SPT). An artificial neural network (ANN) model was developed and trained using various scheduling scenarios generated by ARENA simulation. The experimental results suggest that the ANN scheduling model can provided moderately reliable prediction results for limited scenarios when predicting the number completed jobs, maximum flowtime, average machine utilization, and average length of queue. This study has provided better understanding on the effects of changes in demand and capacity on the job shop schedules. Areas for further study includes: (i) Fine tune the proposed ANN scheduling model (ii) Consider more variety of job shop environment (iii) Incorporate an expert system for interpretation of results. The theoretical framework proposed in this study can be used as a basis for further investigation
A linear programming-based method for job shop scheduling
We present a decomposition heuristic for a large class of job shop scheduling problems. This heuristic utilizes information from the linear programming formulation of the associated optimal timing problem to solve subproblems, can be used for any objective function whose associated optimal timing problem can be expressed as a linear program (LP), and is particularly effective for objectives that include a component that is a function of individual operation
completion times. Using the proposed heuristic framework, we address job shop scheduling problems with a variety of objectives where intermediate holding costs need to be explicitly considered. In computational testing, we demonstrate the performance of our proposed solution approach
- …