16,128 research outputs found

    Service level agreement framework for differentiated survivability in GMPLS-based IP-over-optical networks

    Get PDF
    In the next generation optical internet, GMPLS based IP-over-optical networks, ISPs will be required to support a wide variety of applications each having their own requirements. These requirements are contracted by means of the SLA. This paper describes a recovery framework that may be included in the SLA contract between ISP and customers in order to provide the required level of survivability. A key concern with such a recovery framework is how to present the different survivability alternatives including recovery techniques, failure scenario and layered integration into a transparent manner for customers. In this paper, two issues are investigated. First, the performance of the recovery framework when applying a proposed mapping procedure as an admission control mechanism in the edge router considering a smart-edge simple-core GMPLS-based IP/WDM network is considered. The second issue pertains to the performance of a pre-allocated restoration and its ability to provide protected connections under different failure scenarios

    Location-based restoration mechanism for multi-domain GMPLS networks

    Get PDF

    Restoration in multi-domain GMPLS-based networks

    Get PDF
    In this paper, we evaluate the efficiency of using restoration mechanisms in a dynamic multi-domain GMPLS network. Major challenges and solutions are introduced and two well-known restoration schemes (End-to-End and Local-to-End) are evaluated. Additionally, new restoration mechanisms are introduced: one based on the position of a failed link, called Location-Based, and another based on minimizing the additional resources consumed during restoration, called Shortest-New. A complete set of simulations in different network scenarios show where each mechanism is more efficient in terms, such as, resource overbuild or recovery delayPart of this work was supported by the Government of Catalonia (DURSI SGR-1202), and by the Spanish Science and Innovation Ministry (TRION TEC2009-10724

    Temporal Insensitivity of Willingness to Pay: How do they evaluate in CVM?

    Get PDF
    In addition to scope and scale embedding effects, temporal insensitivity of willingness to pay, also known as temporal embedding effect, has been a well known anomaly in eliciting willingness to pay for environmental quality change, especially over time. Stevens et al. (1997) defines two types of temporal embedding effects: strong insensitivity and weak insensitivity to payment schedule. This paper proposes an alternative definition of the temporal insensitivity. Temporal insensitivity implies that a subject in the survey responds consistently to value elicitation questions regardless of payment schemes. The sequential test tests the temporal insensitivity using the oyster reef restoration programs in Chesapeake Bay. Test results show that willingness to pay for the program is insensitive to the payment scheme or to the length of benefit stream of the project. Discount rates imbedded in cost stream vary significantly among the combination of project lengths and payment schemes.Temporal insensitivity of willingness to pay, Temporal embedding effect, Implicit discount rate, Sequential test, Demand and Price Analysis,

    Recovery modeling in MPLS networks

    Get PDF
    Transmission of QoS based traffic over packet switched network typically requires resource reservation or differentiated treatment to guarantee an acceptable level of performance. But it is also essential to bound the disruption caused by failure of nodes or links for a real time traffic to a limit that is acceptable by the application. In this paper, a simulation platform models the impact of the MPLS recovery/protection schemes on the QoS traffic parameters including disruption time and number of out of order packets arriving at the destination. The simulation considers measures to alleviate drawbacks caused by recovery process

    Incentive Regulation of Electricity Distribution Networks: Lessons of Experience from Britain

    Get PDF
    This paper reviews the recent experience of the UK electricity distribution sector under incentive regulation. The UK has a significant and transparent history in implementing incentive regulation in the period since 1990. We demonstrate the successes of this period in reducing costs, prices and energy losses while maintaining quality of service. We also draw out the lessons for other countries in implementing distribution sector reform. We conclude by discussing the place of incentive regulation of networks within the wider reform context, the required legislative framework, the need for appropriate unbundling, the importance of quality of service incentives, the regulatory information requirements and the role of sector rationalisation.Electricity, liberalisation, regulation, benchmarking

    Power quality and electromagnetic compatibility: special report, session 2

    Get PDF
    The scope of Session 2 (S2) has been defined as follows by the Session Advisory Group and the Technical Committee: Power Quality (PQ), with the more general concept of electromagnetic compatibility (EMC) and with some related safety problems in electricity distribution systems. Special focus is put on voltage continuity (supply reliability, problem of outages) and voltage quality (voltage level, flicker, unbalance, harmonics). This session will also look at electromagnetic compatibility (mains frequency to 150 kHz), electromagnetic interferences and electric and magnetic fields issues. Also addressed in this session are electrical safety and immunity concerns (lightning issues, step, touch and transferred voltages). The aim of this special report is to present a synthesis of the present concerns in PQ&EMC, based on all selected papers of session 2 and related papers from other sessions, (152 papers in total). The report is divided in the following 4 blocks: Block 1: Electric and Magnetic Fields, EMC, Earthing systems Block 2: Harmonics Block 3: Voltage Variation Block 4: Power Quality Monitoring Two Round Tables will be organised: - Power quality and EMC in the Future Grid (CIGRE/CIRED WG C4.24, RT 13) - Reliability Benchmarking - why we should do it? What should be done in future? (RT 15
    corecore