    Using 4D BIM in the Retrofit Process of Social Housing

    Get PDF
    There is a large stock of solid wall homes in the UK presenting poor thermal insulation and low energy performance. Although the UK Government has supported improvement efforts in the area, the identification of appropriate technical solutions that effectively improve the existing stock remains a challenge. BIM offers opportunities for building performance optimisation, through improved design and simulation. This research investigates how BIM could improve the retrofit process for social housing. This paper describes a research project looking into the use of BIM to develop what-if scenarios for retrofitting existing ’no-fines’ solid wall homes. The scenarios enable the analysis of alternative solutions considering costs, energy performance and user disruption. More specifically, this paper focuses on the use of 4D models to evaluate disruption for end users. The research process includes simulations, meetings, interviews, documents, and observations. Results indicate that the development of 4D BIM models supports a better understanding of the retrofitting process on site, enabling the definition of production processes with as minimal disruption as possible for users, whilst still delivering energy-oriented and cost effective solutions

    Construction safety and digital design: a review

    Get PDF
    As digital technologies become widely used in designing buildings and infrastructure, questions arise about their impacts on construction safety. This review explores relationships between construction safety and digital design practices with the aim of fostering and directing further research. It surveys state-of-the-art research on databases, virtual reality, geographic information systems, 4D CAD, building information modeling and sensing technologies, finding various digital tools for addressing safety issues in the construction phase, but few tools to support design for construction safety. It also considers a literature on safety critical, digital and design practices that raises a general concern about ‘mindlessness’ in the use of technologies, and has implications for the emerging research agenda around construction safety and digital design. Bringing these strands of literature together suggests new kinds of interventions, such as the development of tools and processes for using digital models to promote mindfulness through multi-party collaboration on safet

    Model-based groupware solution for distributed real-time collaborative 4D planning via teamwork

    Get PDF
    Construction planning plays a fundamental role in construction project management that requires team working among planners from a diverse range of disciplines and in geographically dispersed working situations. Model-based four-dimensional (4D) computer-aided design (CAD) groupware, though considered a possible approach to supporting collaborative planning, is still short of effective collaborative mechanisms for teamwork due to methodological, technological and social challenges. Targeting this problem, this paper proposes a model-based groupware solution to enable a group of multidisciplinary planners to perform real-time collaborative 4D planning across the Internet. In the light of the interactive definition method, and its computer-supported collaborative work (CSCW) design analysis, the paper discusses the realization of interactive collaborative mechanisms from software architecture, application mode, and data exchange protocol. These mechanisms have been integrated into a groupware solution, which was validated by a planning team in a truly geographically dispersed condition. Analysis of the validation results revealed that the proposed solution is feasible for real-time collaborative 4D planning to gain a robust construction plan through collaborative teamwork. The realization of this solution triggers further considerations about its enhancement for wider groupware applications

    Building Information Modelling [BIM] for energy efficiency in housing refurbishments

    Get PDF
    Building Information modelling offers potential process and delivery improvements throughout the lifecycle of built assets. However, there is limited research in the use of BIM for energy efficiency in housing refurbishments. The UK has over 300,000 solid wall homes with very poor energy efficiency. A BIM based solution for the retrofit of solid wall housing using lean and collaborative improvement techniques will offer a cost effective, comprehensive solution that is less disruptive, reduces waste and increases accuracy, leading to high quality outcomes. The aim of this research is to develop a BIM based protocol supporting development of 'what if' scenarios in housing retrofits for high efficiency thermal improvements, aiming to reduce costs and disruption for users. The paper presents a literature review on the topic and discusses the research method for the research project (S-IMPLER)

    A Research Review on Building Information Modeling in Construction―An Area Ripe for IS Research

    Get PDF
    This article presents a review of the research on Building Information Modeling (BIM) in construction, with the aim of identifying areas in this domain where IS research can contribute. The concept of BIM comprises an infrastructure of IT tools supporting collaborative and integrated design, assembly, and operation of buildings. This integrated construction approach, with all stakeholders editing or retrieving information from commonly shared models, requires major changes to well-established processes, organizational roles, contractual practices, and collaborative arrangements in the construction industry. Through a review of 264 research articles on BIM, we found that this research spans a wide area of technological and organizational topics, of which many have a clear resonance to focal areas in IS research. Our analysis shows that IS, to some extent, serves as a reference discipline and that theories used in IS research are also informing contemporary BIM research. The following areas in need of further IS research were identified: studies on the relationship between BIM’s functional affordance and human agency, adoption and use of BIM for inter-organizational collaboration, the influence of organizational culture on BIM practices, the capabilities of BIM for transforming industry practice, and identifying the business value of BIM. Considering that a well-established knowledge base in IS research can be drawn upon for studying these issues, combined with the exciting potential of BIM for transforming a major industry such as building construction, we conclude that BIM is an area ripe for IS research

    The interaction of lean and building information modeling in construction

    Get PDF
    Lean construction and Building Information Modeling are quite different initiatives, but both are having profound impacts on the construction industry. A rigorous analysis of the myriad specific interactions between them indicates that a synergy exists which, if properly understood in theoretical terms, can be exploited to improve construction processes beyond the degree to which it might be improved by application of either of these paradigms independently. Using a matrix that juxtaposes BIM functionalities with prescriptive lean construction principles, fifty-six interactions have been identified, all but four of which represent constructive interaction. Although evidence for the majority of these has been found, the matrix is not considered complete, but rather a framework for research to explore the degree of validity of the interactions. Construction executives, managers, designers and developers of IT systems for construction can also benefit from the framework as an aid to recognizing the potential synergies when planning their lean and BIM adoption strategies

    4D BIM application in AEC industry: impact on integrated project delivery

    Get PDF
    As project delivery approaches that are supported by Building Information Modelling (BIM) are continuously acknowledged throughout the Architecture, Engineering and Construction (AEC) industry, an innovative modelling approach called 4D BIM is starting to develop, which associates elements of 3D BIM with time and scheduling information. Traditional construction planning applications like bar charts and network diagrams fail to present and communicate the spatial and temporal or 4D components of construction schedules efficiently. As a result, they do not permit project managers to produce scheduling alternatives quickly to obtain the finest solution to develop a particular design. With 4D modelling, the whole period of a sequence of activities that is executed by those involved in the project can be presented visually. With the rising interest in BIM and the wider use of this and other technological innovations in the AEC industry, 4D BIM tools, which has been broadly employed, is becoming increasingly recognized among fundamental technological fields under BIM. This study aims to highlight and review numerous impacts of 4D applications on Integrated Project Delivery (IPD) in the AEC industry and suggest the ideal strategy to optimize the tools for rapid project delivery

    Implementing last planner in the context of social housing retrofit

    Get PDF
    The paper aims to investigate the implementation issues and benefits of utilising the Last Planner and 4D modelling in the context of retrofit of social housing. It presents initial results of an on-going research project carried out in Northern Ireland, which focuses on the retrofit of solid wall homes. The research project involves the proposal of a process in which BIM is used to evaluate what-if scenarios for the retrofit of social housing with a focus on reducing user’s disruption throughout the construction process. Both 4D and the Last Planner are used to ensure the retrofit works with the minimum disruption. A case study on the retrofit of a set of houses was carried out, which is part of a bigger research project entitled S-IMPLER. Data was collected via semi-structured interviews, participant observation in planning meetings, site visits and documental analysis. The study sheds light on a particular type of project that has not been well explored by the lean community, i.e. retrofits. It is argued that the results can be applicable to support the retrofit of a number of solid wall homes throughout the UK

    User-centred design for collaborative 4D modelling

    Get PDF
    Purpose - The purpose of this paper is to clarify the CSCW in collaborative 4D modelling and its user interface (UI)/interaction designs for prototyping. Four-dimensional (4D) modelling technology has potentials to integrate geographically dispersed planners to achieve collaborative construction planning. However, applying this technology in teamwork remains a challenge in computer-supported collaborative work (CSCW).Design/methodology/approach - The research adopted user-centred design (UCD) methodology to investigate a usable 4D collaboration prototype through analysis, design and usability testing. By applying CSCW theories, it first clarified the meaning of 4D CSCW to formulate design propositions as design target. By leveraging UCD theories, subsequently, the first-stage research sought an optimal standalone 4D modelling prototype following a parallel design approach. At the second stage, it further investigated into a collaborative 4D modelling prototype using an iterative design. It adopted collaborative task analysis into the UI/interaction design extension for a collaborative prototype based on results obtained from the first stage. The final usability testing was performed on the collaborative prototype to evaluate the designed CSCW and UI in a controlled geographically dispersed teamwork situation.Findings - The test results and user feedback verified their usability. It also disclosed design weaknesses in collaborators' awareness and smooth tasks' transitions for further enhancement.Originality/value - The combination of CSCW and UCD theories is practical for designing collaborative 4D modelling. It can also benefit designs for collaborative modelling in other dimensions like cost analysis, sustainable design, facility management, etc. in building information modelling.Published versio