2,910 research outputs found

    Multi-layer Decision methodology For ranking Z-numbers

    Get PDF
    The new concept of a – number has been recently introduced in decision making analysis. This concept is capable of effectively dealing with uncertainty in information about a decision. As this concept is relatively new in fuzzy sets, its underlying theoretical aspects have not been established yet. In this paper, a multi-layer methodology for ranking Z – numbers is proposed for the first time. This methodology consists of two layers: Z – number conversion as the first layer and fuzzy number ranking as the second layer. In this study, the conversion methodology of Z – numbers into fuzzy numbers is extended to conversion into standardised generalised fuzzy number so that the methodology is applicable to both positive and negative data values. The methodology is validated by means of thorough comparison with some established ranking methods for consistency purposes. This methodology is considered as a generic decision making procedure, especially when – numbers are applied to real decision making problems

    Hybrid Ant Colony Optimization For Fuzzy Unrelated Parallel Machine Scheduling Problems

    Get PDF
    This study extends the best hybrid ant colony optimization variant developed by Liao et al. (2014) for crisp unrelated parallel machine scheduling problems to solve fuzzy unrelated parallel machine scheduling problems in consideration of trapezoidal fuzzy processing times, trapezoidal fuzzy sequencing dependent setup times and trapezoidal fuzzy release times. The objective is to find the best schedule taking minimum fuzzy makespan in completing all jobs. In this study, fuzzy arithmetic is used to determine fuzzy completion times of jobs and defuzzification function is used to convert fuzzy numbers back to crisp numbers for ranking. Eight fuzzy ranking methods are tested to find the most feasible one to be employed in this study. The fuzzy arithmetic testing includes four different cases and each case with the following operations separately, i.e., addition, subtraction, multiplication and division, to investigate the spread of fuzziness as fuzzy numbers are subject to more and more number of operations. The effect of fuzzy ranking methods on hybrid ant colony optimization (hACO) is investigated. To prove the correctness of our methodology and coding, unrelated parallel machine scheduling with fuzzy numbers and crisp numbers are compared based on scheduling problems up to 15 machines and 200 jobs. Relative percentage deviation (RPD) is used to evaluate the performance of hACO in solving fuzzy unrelated parallel machine scheduling problems. A numerical study on large-scale scheduling problems up to 20 machines and 200 jobs is conducted to assess the performance of the hACO algorithm. For comparison, a discrete particle swarm optimization (dPSO) algorithm is implemented for fuzzy unrelated parallel machine scheduling problem as well. The results show that the hACO has better performance than dPSO not only in solution quality in terms of RPD value, but also in computational time

    Ranking Indices for Fuzzy Numbers

    Get PDF
    • …
    corecore