    Integrated production quality and condition-based maintenance optimisation for a stochastically deteriorating manufacturing system

    Get PDF
    This paper investigates the problem of optimally integrating production quality and condition-based maintenance in a stochastically deteriorating single- product, single-machine production system. Inspections are periodically performed on the system to assess its actual degradation status. The system is considered to be in ‘fail mode’ whenever its degradation level exceeds a predetermined threshold. The proportion of non-conforming items, those that are produced during the time interval where the degradation is beyond the specification threshold, are replaced either via overtime production or spot market purchases. To optimise preventive maintenance costs and at the same time reduce production of non-conforming items, the degradation of the system must be optimally monitored so that preventive maintenance is carried out at appropriate time intervals. In this paper, an integrated optimisation model is developed to determine the optimal inspection cycle and the degradation threshold level, beyond which preventive maintenance should be carried out, while minimising the sum of inspection and maintenance costs, in addition to the production of non-conforming items and inventory costs. An expression for the total expected cost rate over an infinite time horizon is developed and solution method for the resulting model is discussed. Numerical experiments are provided to illustrate the proposed approach

    Optimal replacement in the proportional hazards model and its applications in a product-service system

    Get PDF
    Condition-based maintenance is rapidly gaining favor as a way to prevent the failures of capital-intensive assets and to maintain them in good operating condition with minimum cost. A valuable and increasingly prevalent way to incorporate condition information into risk estimation is by the proportional hazards model (PHM), which explicitly includes both the age and the condition information in the calculation of the hazard function. This dissertation consists of three papers, in which the optimal replacement policies for systems whose deterioration process follows the PHM are developed under different settings; and a joint optimization of the asset and inventory management problem in the context of a product-service system is considered. In the first paper, a continuous time Markov covariate process is assumed to describe the condition of a system that is under periodic monitoring. Although the form of an optimal replacement policy for such a system in the PHM was developed previously, an approximation of the Markov process as constant within inspection intervals led to a counter-intuitive result that less frequent monitoring could yield a replacement policy with lower average cost. Accounting for possible state transitions between inspection epochs removes the approximation and eliminates the cost anomaly. A new recursive procedure to obtain the parameters of the optimal replacement policy is presented. By comparing the replacement and monitoring costs of different monitoring scheme, the value of condition information is evaluated. In the second paper, the optimal replacement policy for systems in the PHM with semi-Markovian covariate process and continuous monitoring is developed. Numerical examples and sensitivity analysis provide some insights about the suitability of a Markov approximation and the impact of the variations in the input parameters on the cost. In applying the optimal replacement policies to a product-service system, where the producers provide the use of the products to customers while retaining ownership, the coupling between the decision making for preventive replacement and the decision making for inventory management is evident. In the third paper, an integrated model is proposed for the preventive maintenance of a fleet of products and the inventory management of a hybrid manufacturing-remanufacturing system in the context of a product-service system. A joint optimization technique is developed to obtain the optimal parameters for the operational policy of the integrated model to minimize the long run average cost per unit time. In addition, the effect of the assumption that the replaced products are not sorted is evaluated

    Integration of production, maintenance and quality : Modelling and solution approaches

    Get PDF
    Dans cette thèse, nous analysons le problème de l'intégration de la planification de production et de la maintenance préventive, ainsi que l'élaboration du système de contrôle de la qualité. Premièrement, on considère un système de production composé d'une machine et de plusieurs produits dans un contexte incertain, dont les prix et le coût changent d'une période à l'autre. La machine se détériore avec le temps et sa probabilité de défaillance, ainsi que le risque de passage à un état hors contrôle augmentent. Le taux de défaillance dans un état dégradé est plus élevé et donc, des coûts liés à la qualité s’imposent. Lorsque la machine tombe en panne, une maintenance corrective ou une réparation minimale seront initiées pour la remettre en marche sans influer ses conditions ou le processus de détérioration. L'augmentation du nombre de défaillances de la machine se traduit par un temps d'arrêt supérieur et un taux de disponibilité inférieur. D'autre part, la réalisation des plans de production est fortement influencée par la disponibilité et la fiabilité de la machine. Les interactions entre la planification de la maintenance et celle de la production sont incorporées dans notre modèle mathématique. Dans la première étape, l'effet de maintenance sur la qualité est pris en compte. La maintenance préventive est considérée comme imparfaite. La condition de la machine est définie par l’âge actuel, et la machine dispose de plusieurs niveaux de maintenance avec des caractéristiques différentes (coûts, délais d'exécution et impacts sur les conditions du système). La détermination des niveaux de maintenance préventive optimaux conduit à un problème d’optimisation difficile. Un modèle de maximisation du profit est développé, dans lequel la vente des produits conformes et non conformes, les coûts de la production, les stocks tenus, la rupture de stock, la configuration de la machine, la maintenance préventive et corrective, le remplacement de la machine et le coût de la qualité sont considérés dans la fonction de l’objectif. De plus, un système composé de plusieurs machines est étudié. Dans cette extension, les nombres optimaux d’inspections est également considéré. La fonction de l’objectif consiste à minimiser le coût total qui est la somme des coûts liés à la maintenance, la production et la qualité. Ensuite, en tenant compte de la complexité des modèles préposés, nous développons des méthodes de résolution efficaces qui sont fondées sur la combinaison d'algorithmes génétiques avec des méthodes de recherches locales. On présente un algorithme mimétique qui emploi l’algorithme Nelder-Mead, avec un logiciel d'optimisation pour déterminer les valeurs exactes de plusieurs variables de décisions à chaque évaluation. La méthode de résolution proposée est comparée, en termes de temps d’exécution et de qualités des solutions, avec plusieurs méthodes Métaheuristiques. Mots-clés : Planification de la production, Maintenance préventive imparfaite, Inspection, Qualité, Modèles intégrés, MétaheuristiquesIn this thesis, we study the integrated planning of production, maintenance, and quality in multi-product, multi-period imperfect systems. First, we consider a production system composed of one machine and several products in a time-varying context. The machine deteriorates with time and so, the probability of machine failure, or the risk of a shift to an out-of-control state, increases. The defective rate in the shifted state is higher and so, quality related costs will be imposed. When the machine fails, a corrective maintenance or a minimal repair will be initiated to bring the machine in operation without influencing on its conditions or on the deterioration process. Increasing the expected number of machine failures results in a higher downtime and a lower availability rate. On the other hand, realization of the production plans is significantly influenced by the machine availability and reliability. The interactions between maintenance scheduling and production planning are incorporated in the mathematical model. In the first step, the impact of maintenance on the expected quality level is addressed. The maintenance is also imperfect and the machine conditions after maintenance can be anywhere between as-good-as-new and as-bad-as-old situations. Machine conditions are stated by its effective age, and the machine has several maintenance levels with different costs, execution times, and impacts on the system conditions. High level maintenances on the one hand have greater influences on the improvement of the system state and on the other hand, they occupy more the available production time. The optimal determination of such preventive maintenance levels to be performed at each maintenance intrusion is a challenging problem. A profit maximization model is developed, where the sale of conforming and non-conforming products, costs of production, inventory holding, backorder, setup, preventive and corrective maintenance, machine replacement, and the quality cost are addressed in the objective function. Then, a system with multiple machines is taken into account. In this extension, the number of quality inspections is involved in the joint model. The objective function minimizes the total cost which is the sum of maintenance, production and quality costs. In order to reduce the gap between the theory and the application of joint models, and taking into account the complexity of the integrated problems, we have developed an efficient solution method that is based on the combination of genetic algorithms with local search and problem specific methods. The proposed memetic algorithm employs Nelder-Mead algorithm along with an optimization package for exact determination of the values of several decision variables in each chromosome evolution. The method extracts not only the positive knowledge in good solutions, but also the negative knowledge in poor individuals to determine the algorithm transitions. The method is compared in terms of the solution time and quality to several heuristic methods. Keywords : Multi-period production planning, Imperfect preventive maintenance, Inspection, Quality, Integrated model, Metaheuristic

    Joint maintenance-inventory optimisation of parallel production systems

    Get PDF
    We model a joint inspection and spare parts inventory policy for maintaining machines in a parallel system, where simultaneous downtime seriously impacts upon production performance and has a significant financial consequence. This dependency between system components means that analysis of realistic maintenance models is intractable. Therefore we use simulation and a numerical optimisation tool to study the cost-optimality of several policies. Inspection maintenance is modelled using the delay-time concept. Critical spare parts replenishment is considered using several variants of a periodic review policy. In particular, our results indicate that the cost-optimal policy is characterised by equal frequencies of inspection and replenishment, and delivery of spare parts that coincides with maintenance intervention. In general, our model provides a framework for studying the interaction of spare parts ordering with maintenance scheduling. The sensitivity analysis that we present offers insights for the effective management of such parallel systems, not only in a paper-making plant, which motivates our modelling development, but also in other manufacturing contexts

    Sustainable Inventory Management Model for High-Volume Material with Limited Storage Space under Stochastic Demand and Supply

    Get PDF
    Inventory management and control has become an important management function, which is vital in ensuring the efficiency and profitability of a company’s operations. Hence, several research studies attempted to develop models to be used to minimise the quantities of excess inventory, in order to reduce their associated costs without compromising both operational efficiency and customers’ needs. The Economic Order Quantity (EOQ) model is one of the most used of these models; however, this model has a number of limiting assumptions, which led to the development of a number of extensions for this model to increase its applicability to the modern-day business environment. Therefore, in this research study, a sustainable inventory management model is developed based on the EOQ concept to optimise the ordering and storage of large-volume inventory, which deteriorates over time, with limited storage space, such as steel, under stochastic demand, supply and backorders. Two control systems were developed and tested in this research study in order to select the most robust system: an open-loop system, based on direct control through which five different time series for each stochastic variable were generated, before an attempt to optimise the average profit was conducted; and a closed-loop system, which uses a neural network, depicting the different business and economic conditions associated with the steel manufacturing industry, to generate the optimal control parameters for each week across the entire planning horizon. A sensitivity analysis proved that the closed-loop neural network control system was more accurate in depicting real-life business conditions, and more robust in optimising the inventory management process for a large-volume, deteriorating item. Moreover, due to its advantages over other techniques, a meta-heuristic Particle Swarm Optimisation (PSO) algorithm was used to solve this model. This model is implemented throughout the research in the case of a steel manufacturing factory under different operational and extreme economic scenarios. As a result of the case study, the developed model proved its robustness and accuracy in managing the inventory of such a unique industry

    A study in joint maintenance scheduling and production planning

    Get PDF
    Master'sMASTER OF ENGINEERIN

    Optimizing the integrated economic production quantity for a stochastically deteriorating production system under condition-based maintenance

    Get PDF
    This paper proposes a new integrated economic production quantity (EPQ) and condition-based maintenance (CBM) model for a stochastically deteriorating production system. Inspections are performed periodically to measure the real time degradation. The system fails (out-of-control) whenever its degradation is beyond a critical threshold level. In the out-of-control state, a proportion of nonconforming items are produced. To assess the degradation of the system and to increase the production of conforming items, preventive maintenance (PM) actions are carried out. An integrated EPQ and CBM optimization model that minimizes the total expected cost rate over an infinite time horizon is developed. The objective is to determine a joint optimal EPQ and PM strategy minimizing the sum of inspection/maintenance and setup costs, cost of nonconforming items in addition to inventory holding cost. Numerical experiments are provided to illustrate the proposed approach

    On the design of a flow line with intermediate buffers and mixed corrective maintenance

    Get PDF
    We considered a mixed corrective maintenance policy for machines in a two-machine one-buffer flow line. The machines had stochastic processing times and suffered from unexpected failures. In the case of a failure, the machines were either minimally repaired or their failing components were replaced by spare parts. While the replacement strategy is rapid and the system can be considered new thereafter, spare parts provisioning and storage costs are very high. Thus, we additionally considered minimal repairs, which are less expensive and restore the system to a working condition at a minimum. We modeled the system as a continuous-time Markov chain. This approach was used to measure the performance of the flow line and the mixed corrective maintenance policy employed. To facilitate design decisions for the flow line, we considered both the cost of an interstage buffer and the maintenance costs for machines in line. We formulated an optimization problem based on a profit function that enables the simultaneous optimization of the buffer size and maintenance strategy. Our numerical analyses reveal useful insights into the performance and optimal design of the flow line depending on the utilized maintenance strategy

    Optimal Pricing and Ordering Policy for Two Echelon Varying Production Inventory System

    Get PDF

    Development of Fuzzy Inventory Model under Decreasing Demand and increasing Deterioration Rate

    Get PDF
    This research study proposed an inventory model with both the time varying variable deterioration and demand rate under the fuzzy environment. Fuzzy set theory is generally consider with imprecision and uncertainty nature of quantitative coefficients. In this system, we assumed the linearly increasing and decreasing function of time  for deterioration and demand respectively. In this research work, we discuss a fuzzy inventory model solving by signed distance method where demand follow time varying.&nbsp