54,923 research outputs found

    A model for assessing the impact of electronic procurement forms

    Get PDF
    This paper aims to contribute to the development of a model for assessing the direct and indirect impact of various forms of electronic procurement (EP) on a firm¿s integral purchasing (-related) costs. The model builds on existing classifications of purchasing costs and benefits and is illustrated by means of a number of empirical cases

    Skill competency development strategies by a contractor

    Get PDF
    Construction skills are one of the vital aspects of construction work which is growing in importance due to skill gaps and skill shortages during different economic cycles. The aim of this study was to investigate competence development strategies by a traditional construction company within its own pool of skill resources and among its supply chain members. The study was carried out via literature review, empirical studies involving a focus study, analysis of documentary evidence supported by unstructured interviews and a report of skill development/supply chain conference. The study demonstrates how long-term skill development can be achieved through: (a) strategic capacity planning which allows high retention, continuous training, and balanced construction demand and contractor’s supply capacity over the long term; (b) updating and upgrading the knowledge base of the supply chain through conferences and training schemes; (c) strategic investment in the workforce through training, vocational and higher degrees; and (d) acquaintance with different sources of finance. This study will assist small traditional firms in building competencies in skill development and improvement. It will assist an international audience who may face similar issue with their construction firm

    Coordination, Cooperation, and Collaboration: Defining the C3 Framework

    Get PDF
    The term C3 refers to the framework of coordinative, cooperative and collaborative relationships within the realm of external supply chain partnerships. Each unique partnership offers both benefits and challenges within a supply chain and must be aligned with company and supply chain strategy in order to achieve maximum effectiveness. This paper aims to fill the current void in supply chain literature concerning C3 by defining each term based upon current supply chain research as well as give the most prevalent characteristics and differences between each “C” in this phase model. This research is then compared to the industry through a case study of a major international retailer. Finally, we propose a set of propositions that organizations can use to assess at what level their external relationships reside within the phase model as well as how companies move and evolve their relationships between the levels and what the trigger mechanisms are in this evolution

    Implementing 5D BIM on construction projects: Contractor perspectives from the UK construction sector

    Get PDF
    This is an accepted manuscript of an article published by Emerald in Journal of Engineering, Design and Technology on 09/05/2020: https://doi.org/10.1108/JEDT-01-2020-0007 The accepted version of the publication may differ from the final published version.Purpose The purpose of this paper is to report on primary research findings that sought to investigate and analyse salient issues on the implementation of 5D building information modelling (BIM) from the UK contractors’ perspective. Previous research and efforts have predominantly focussed on the use of technologies for cost estimation and quantity takeoff within a more traditional-led procurement, with a paucity of research focussing on how 5D BIM could facilitate costing within contractor-led procurement. This study fills this current knowledge gap and enhances the understanding of the specific costing challenges faced by contractors in contractor-led projects, leading to the development of 5D framework for use in future projects. Design/methodology/approach To develop a fully detailed understanding of the challenges and issues being faced in this regard, a phenomenological, qualitative-based study was undertaken through interviews involving 21 participants from UK-wide construction organisations. A thematic data analytical process was applied to the data to derive key issues, and this was then used to inform the development of a 5D-BIM costing framework. Findings Multi-disciplinary findings reveal a range of issues faced by contractors when implementing 5D BIM. These exist at strategic, operational and technological levels which require addressing successful implementation of 5D BIM on contractor-led projects adhering to Level 2 BIM standards. These findings cut across the range of stakeholders on contractor-led projects. Ultimately, the findings suggest strong commitment and leadership from organisational management are required to facilitate cost savings and generate accurate cost information. Practical implications This study highlights key issues for any party seeking to effectively deploy 5D BIM on a contractor-led construction project. A considerable cultural shift towards automating and digitising cost functions virtually, stronger collaborative working relationship relative to costing in design development, construction practice, maintenance and operation is required. Originality/value By analysing findings from primary research data, the work concludes with the development of a 5D BIM costing framework to support contractor-led projects which can be implemented to ensure that 5D BIM is successfully implemented

    Sustainable development in higher education: consultation on a framework for HEFCE

    Get PDF

    Cooperative purchasing within the United Nations

    Get PDF
    To support cooperative purchasing within the United Nations we carried out an empirical study in 2004, mainly to define cooperation forms, and to identify and rank motives and critical factors for cooperation. Important reasons to work together turn out to be lower prices and transaction costs, sharing information, and learning. Reasons not to work together are i.e. lack of opportunity or priority to purchase cooperatively. Most of the literature in the area of critical factors focuses on factors such as trust and support. Based on our study, we also emphasize the importance of choosing the right products and services. Furthermore, we observe what we call the hitchhikers’ dilemma. This dilemma deals with small agencies hitchhiking on contracts from large agencies. For large agen-cies there may be no incentive to allow hitchhiking. For small agencies hitchhiking can be very interesting though. Possible solutions to this problem are savings allocation mechanisms. The paper concludes with suggestions for further research

    Partnerships for skills : investing in training for the 21st century

    Get PDF
    corecore