133,208 research outputs found

    INFORMATION SYSTEM DEVELOPMENT METHODOLOGY: RESOURCE MODEL DESIGN

    Get PDF
    Metodika projektiranja informacijskih sustava usmjerena je na oblikovanje modela procesa, modela podataka i modela resursa kroz četiri faze razvitka: planiranje, analizu, oblikovanje i konstrukciju. Suvremeni CASE alati sadrže komponente za modeliranje procesa i podataka ali ne i resursa. ulazak otvorenih sustava i Korisnik/Poslužitelj obrade podataka povećava samostalnost i nezavisnost investitora ali, i odgovornost projektanata. Stoga se u radu predlaže metoda za oblikovanje modela resursa te odrednice za arhitekture i standardne zahtjeve za resurse pri orijentaciji na otvorene sustave.The objective of information system development methodologies is design of three models: process model, data model and resource model during the stage of planning, analysis, designand construction. CASE too/s contain components for process and data model design but there is no component for resource model design. Implementation of open system architecture and client/server data processing technology results with: (1) higher indenpendency of investitors, and (2) higher responsibility of designers. Procedure for resource model design and recommendation and resource requirements for "open system" implementation is proposed in this article

    Software engineering and middleware: a roadmap (Invited talk)

    Get PDF
    The construction of a large class of distributed systems can be simplified by leveraging middleware, which is layered between network operating systems and application components. Middleware resolves heterogeneity and facilitates communication and coordination of distributed components. Existing middleware products enable software engineers to build systems that are distributed across a local-area network. State-of-the-art middleware research aims to push this boundary towards Internet-scale distribution, adaptive and reconfigurable middleware and middleware for dependable and wireless systems. The challenge for software engineering research is to devise notations, techniques, methods and tools for distributed system construction that systematically build and exploit the capabilities that middleware deliver

    The private finance initiative (PFI) and finance capital: A note on gaps in the "accountability" debate

    Get PDF
    During recent years, a wide spectrum of research has questioned whether public services/infrastructure procurement through private finance, as exemplified by the UK Private Finance Initiative (PFI), meets minimum standard of democratic accountability. While broadly agreeing with some of these arguments, this paper suggests that this debate is flawed on two grounds. Firstly, PFI is not about effective procurement, or even about a pragmatic choice of procurement mechanisms which can potentially compromise public involvement and input; rather it is about a process where the state creates new profit opportunities at a time when the international financial system is increasingly lacking in safe investment opportunities. Secondly, because of its primary function as investment opportunity, PFI, by its very nature, prioritises the risk-return criteria of private finance over the needs of the public sector client and its stakeholders. Using two case studies of recent PFI projects, the paper illustrates some of the mechanisms through which finance capital exercises control over the PFI procurement process. The paper concludes that recent proposals aimed at “reforming” or “democratising” PFI fail to recognise the objective constraints which this type of state-finance capital nexus imposes on political process

    Strengthening Construction Management in the Rural Rehab Line of Business

    Get PDF
    The Five Key ObservationsObservation#1: Rural rehab success emanated from positive thinking and persistent implementationObservation #2: Almost every RHRO would benefit from a substantial increase in the per unit funding available, especially in light of the forthcoming HUD HOME requirement to establish written rehab standards in ten subcategories.Observation #3: A smartphone and tablet with 20 to 40 apps is the rehab specialist's Swiss Army knife. They are our, GPS, calculator, spec writer, office lifeline in case of danger, camera, clock, cost estimator calendar and a hundred other single-purpose but very important uses.Observation #4: NeighborWorks® Rural Initiative could provide a clearinghouse for success techniques targeted to rural rehab. Each month it might focus on a specific aspect of rehab management; inspection checklists in January, green specs in February, feasibility checklist in March, contractor qualification questionnaires in April and so on.Observation #5: Even with most components of in-house contractor success formula in place, per the Statistic Research Institute 53% of construction firms go out of business with in the first 4 years. It remains a very risky model that requires significant; funding, staff experience, administrative support and risk tolerance.Three Rehab Production Models And Their AlternativesThis middle section restates the introduction and methodology and offers a detailed review of the Traditional Rehab Specialist, Construction Management Of Subcontractor and the In-House General Contractor production models .for each model the article provides: definition and staffing pattern, design roles and tasks for each major player, benefits and challenges, alternative models and finally recommendations for successful implementationFocus TopicsDuring our interview process, three ideas surfaced that were best served with a mini discussion of the topic rather than being embedded in the already large middle section.The three topics are; software and technology, management of community relations – marketing and quality control, and budget solution

    The interaction of lean and building information modeling in construction

    Get PDF
    Lean construction and Building Information Modeling are quite different initiatives, but both are having profound impacts on the construction industry. A rigorous analysis of the myriad specific interactions between them indicates that a synergy exists which, if properly understood in theoretical terms, can be exploited to improve construction processes beyond the degree to which it might be improved by application of either of these paradigms independently. Using a matrix that juxtaposes BIM functionalities with prescriptive lean construction principles, fifty-six interactions have been identified, all but four of which represent constructive interaction. Although evidence for the majority of these has been found, the matrix is not considered complete, but rather a framework for research to explore the degree of validity of the interactions. Construction executives, managers, designers and developers of IT systems for construction can also benefit from the framework as an aid to recognizing the potential synergies when planning their lean and BIM adoption strategies

    Hypermedia-based discovery for source selection using low-cost linked data interfaces

    Get PDF
    Evaluating federated Linked Data queries requires consulting multiple sources on the Web. Before a client can execute queries, it must discover data sources, and determine which ones are relevant. Federated query execution research focuses on the actual execution, while data source discovery is often marginally discussed-even though it has a strong impact on selecting sources that contribute to the query results. Therefore, the authors introduce a discovery approach for Linked Data interfaces based on hypermedia links and controls, and apply it to federated query execution with Triple Pattern Fragments. In addition, the authors identify quantitative metrics to evaluate this discovery approach. This article describes generic evaluation measures and results for their concrete approach. With low-cost data summaries as seed, interfaces to eight large real-world datasets can discover each other within 7 minutes. Hypermedia-based client-side querying shows a promising gain of up to 50% in execution time, but demands algorithms that visit a higher number of interfaces to improve result completeness
    corecore