2,328 research outputs found
New Results on Online Resource Minimization
We consider the online resource minimization problem in which jobs with hard
deadlines arrive online over time at their release dates. The task is to
determine a feasible schedule on a minimum number of machines. We rigorously
study this problem and derive various algorithms with small constant
competitive ratios for interesting restricted problem variants. As the most
important special case, we consider scheduling jobs with agreeable deadlines.
We provide the first constant ratio competitive algorithm for the
non-preemptive setting, which is of particular interest with regard to the
known strong lower bound of n for the general problem. For the preemptive
setting, we show that the natural algorithm LLF achieves a constant ratio for
agreeable jobs, while for general jobs it has a lower bound of Omega(n^(1/3)).
We also give an O(log n)-competitive algorithm for the general preemptive
problem, which improves upon the known O(p_max/p_min)-competitive algorithm.
Our algorithm maintains a dynamic partition of the job set into loose and tight
jobs and schedules each (temporal) subset individually on separate sets of
machines. The key is a characterization of how the decrease in the relative
laxity of jobs influences the optimum number of machines. To achieve this we
derive a compact expression of the optimum value, which might be of independent
interest. We complement the general algorithmic result by showing lower bounds
that rule out that other known algorithms may yield a similar performance
guarantee
Throughput Maximization in Multiprocessor Speed-Scaling
We are given a set of jobs that have to be executed on a set of
speed-scalable machines that can vary their speeds dynamically using the energy
model introduced in [Yao et al., FOCS'95]. Every job is characterized by
its release date , its deadline , its processing volume if
is executed on machine and its weight . We are also given a budget
of energy and our objective is to maximize the weighted throughput, i.e.
the total weight of jobs that are completed between their respective release
dates and deadlines. We propose a polynomial-time approximation algorithm where
the preemption of the jobs is allowed but not their migration. Our algorithm
uses a primal-dual approach on a linearized version of a convex program with
linear constraints. Furthermore, we present two optimal algorithms for the
non-preemptive case where the number of machines is bounded by a fixed
constant. More specifically, we consider: {\em (a)} the case of identical
processing volumes, i.e. for every and , for which we
present a polynomial-time algorithm for the unweighted version, which becomes a
pseudopolynomial-time algorithm for the weighted throughput version, and {\em
(b)} the case of agreeable instances, i.e. for which if and only
if , for which we present a pseudopolynomial-time algorithm. Both
algorithms are based on a discretization of the problem and the use of dynamic
programming
Throughput Maximization in the Speed-Scaling Setting
We are given a set of jobs and a single processor that can vary its speed
dynamically. Each job is characterized by its processing requirement
(work) , its release date and its deadline . We are also given
a budget of energy and we study the scheduling problem of maximizing the
throughput (i.e. the number of jobs which are completed on time). We propose a
dynamic programming algorithm that solves the preemptive case of the problem,
i.e. when the execution of the jobs may be interrupted and resumed later, in
pseudo-polynomial time. Our algorithm can be adapted for solving the weighted
version of the problem where every job is associated with a weight and
the objective is the maximization of the sum of the weights of the jobs that
are completed on time. Moreover, we provide a strongly polynomial time
algorithm to solve the non-preemptive unweighed case when the jobs have the
same processing requirements. For the weighted case, our algorithm can be
adapted for solving the non-preemptive version of the problem in
pseudo-polynomial time.Comment: submitted to SODA 201
On the periodic behavior of real-time schedulers on identical multiprocessor platforms
This paper is proposing a general periodicity result concerning any
deterministic and memoryless scheduling algorithm (including
non-work-conserving algorithms), for any context, on identical multiprocessor
platforms. By context we mean the hardware architecture (uniprocessor,
multicore), as well as task constraints like critical sections, precedence
constraints, self-suspension, etc. Since the result is based only on the
releases and deadlines, it is independent from any other parameter. Note that
we do not claim that the given interval is minimal, but it is an upper bound
for any cycle of any feasible schedule provided by any deterministic and
memoryless scheduler
Non-preemptive Scheduling in a Smart Grid Model and its Implications on Machine Minimization
We study a scheduling problem arising in demand response management in smart
grid. Consumers send in power requests with a flexible feasible time interval
during which their requests can be served. The grid controller, upon receiving
power requests, schedules each request within the specified interval. The
electricity cost is measured by a convex function of the load in each timeslot.
The objective is to schedule all requests with the minimum total electricity
cost. Previous work has studied cases where jobs have unit power requirement
and unit duration. We extend the study to arbitrary power requirement and
duration, which has been shown to be NP-hard. We give the first online
algorithm for the general problem, and prove that the problem is fixed
parameter tractable. We also show that the online algorithm is asymptotically
optimal when the objective is to minimize the peak load. In addition, we
observe that the classical non-preemptive machine minimization problem is a
special case of the smart grid problem with min-peak objective, and show that
we can solve the non-preemptive machine minimization problem asymptotically
optimally
Scheduling of Early Quantum Tasks
An Early Quantum Task (EQT) is a Quantum EDF task that has shrunk its first period into one quantum time slot. Its purpose is to be executed as soon as possible, without causing deadline overflow of other tasks. We will derive the conditions under which an EQT can be admitted and can have an immediate start. The advantage of scheduling EQTs is shown by its use in a buffered multi-media server. The EQT is associated with a multimedia stream and it will use its first invocation to fill the buffer, such that a client can start receiving data immediately
- …