51,834 research outputs found

    Measuring Software Process: A Systematic Mapping Study

    Get PDF
    Context: Measurement is essential to reach predictable performance and high capability processes. It provides support for better understanding, evaluation, management, and control of the development process and project, as well as the resulting product. It also enables organizations to improve and predict its process’s performance, which places organizations in better positions to make appropriate decisions. Objective: This study aims to understand the measurement of the software development process, to identify studies, create a classification scheme based on the identified studies, and then to map such studies into the scheme to answer the research questions. Method: Systematic mapping is the selected research methodology for this study. Results: A total of 462 studies are included and classified into four topics with respect to their focus and into three groups based on the publishing date. Five abstractions and 64 attributes were identified, 25 methods/models and 17 contexts were distinguished. Conclusion: capability and performance were the most measured process attributes, while effort and performance were the most measured project attributes. Goal Question Metric and Capability Maturity Model Integration were the main methods and models used in the studies, whereas agile/lean development and small/medium-size enterprise were the most frequently identified research contexts.Ministerio de Economía y Competitividad TIN2013-46928-C3-3-RMinisterio de Economía y Competitividad TIN2016-76956-C3-2- RMinisterio de Economía y Competitividad TIN2015-71938-RED

    Feasibility study of an Integrated Program for Aerospace-vehicle Design (IPAD) system. Volume 6: Implementation schedule, development costs, operational costs, benefit assessment, impact on company organization, spin-off assessment, phase 1, tasks 3 to 8

    Get PDF
    A baseline implementation plan, including alternative implementation approaches for critical software elements and variants to the plan, was developed. The basic philosophy was aimed at: (1) a progressive release of capability for three major computing systems, (2) an end product that was a working tool, (3) giving participation to industry, government agencies, and universities, and (4) emphasizing the development of critical elements of the IPAD framework software. The results of these tasks indicate an IPAD first release capability 45 months after go-ahead, a five year total implementation schedule, and a total developmental cost of 2027 man-months and 1074 computer hours. Several areas of operational cost increases were identified mainly due to the impact of additional equipment needed and additional computer overhead. The benefits of an IPAD system were related mainly to potential savings in engineering man-hours, reduction of design-cycle calendar time, and indirect upgrading of product quality and performance

    Spacecraft servicing demonstration plan

    Get PDF
    A preliminary spacecraft servicing demonstration plan is prepared which leads to a fully verified operational on-orbit servicing system based on the module exchange, refueling, and resupply technologies. The resulting system can be applied at the space station, in low Earth orbit with an orbital maneuvering vehicle (OMV), or be carried with an OMV to geosynchronous orbit by an orbital transfer vehicle. The three phase plan includes ground demonstrations, cargo bay demonstrations, and free flight verifications. The plan emphasizes the exchange of multimission modular spacecraft (MMS) modules which involves space repairable satellites. Three servicer mechanism configurations are the engineering test unit, a protoflight quality unit, and two fully operational units that have been qualified and documented for use in free flight verification activity. The plan balances costs and risks by overlapping study phases, utilizing existing equipment for ground demonstrations, maximizing use of existing MMS equipment, and rental of a spacecraft bus

    Deep Space Habitability Design Guidelines Based on the NASA NextSTEP Phase 2 Ground Test Program

    Get PDF
    This report summarizes habitation design guidelines for deep space habitats, which were derived from the NASA Next Space Technologies for Exploration Partnerships (NextSTEP) Phase 2 Habitat Ground Test Program. All data presented in this document have been contractor-deidentified and approved for public release. The report prioritizes capabilities and recommends allocating those capabilities to either the Habitation and Logistics Outpost (HALO) or the International Habitat (I-Hab). A review of the design guidelines is presented in the main body of the report, along with a list of the 170 specific design guidelines with references to the specific data sources from which they were derived

    Assessing database and network threats in traditional and cloud computing

    Get PDF
    Cloud Computing is currently one of the most widely-spoken terms in IT. While it offers a range of technological and financial benefits, its wide acceptance by organizations is not yet wide spread. Security concerns are a main reason for this and this paper studies the data and network threats posed in both traditional and cloud paradigms in an effort to assert in which areas cloud computing addresses security issues and where it does introduce new ones. This evaluation is based on Microsoft’s STRIDE threat model and discusses the stakeholders, the impact and recommendations for tackling each threat

    Assessing New York City's Youth Gun Violence Crisis: Crews - Volume II - CompStat for Violence Prevention Programs: Collecting Program Specific Data to Manage Performance and Inform Policy

    Get PDF
    The success or failure of community strategies to address the youth gun violence crisis is often attributed in part to how well the problem is understood and diagnosed. With support from The New York Community Trust, the Crime Commission has undertaken an analysis of youth gun violence and crew activity -- violent turf rivalries among less-organized, smaller and normally younger groups than traditional gangs -- in select New York City communities. Our initial findings from available data, existing research and interviews with stakeholders are presented in a series of papers titled, "Assessing New York City's Youth Gun Violence Crisis: Crews.

    A Review of ISO New England's Proposed Market Rules

    Get PDF
    This report reviews the proposed rules for restructured wholesale electricity markets in New England. We review the market rules, both individually and collectively, and identify potential problems that might limit the efficiency of these markets. We examine alternatives and identify the key tradeoffs among alternative designs. We believe that the wholesale electricity market in New England can begin on December 1, 1998. However, improvements are needed for long-run success. We have identified four major recommendations: 1. Switch to a multi-settlement system. 2. Introduce demand-side bidding. 3. Adopt location-based transmission congestion pricing, especially for the import/export interfaces. 4. Fix the pricing of the ten minute spinning reserves.Auctions; Multiple Object Auctions; Electricity Auctions

    Ground Systems Development Environment (GSDE) software configuration management

    Get PDF
    This report presents a review of the software configuration management (CM) plans developed for the Space Station Training Facility (SSTF) and the Space Station Control Center. The scope of the CM assessed in this report is the Systems Integration and Testing Phase of the Ground Systems development life cycle. This is the period following coding and unit test and preceding delivery to operational use. This report is one of a series from a study of the interfaces among the Ground Systems Development Environment (GSDE), the development systems for the SSTF and the SSCC, and the target systems for SSCC and SSTF. This is the last report in the series. The focus of this report is on the CM plans developed by the contractors for the Mission Systems Contract (MSC) and the Training Systems Contract (TSC). CM requirements are summarized and described in terms of operational software development. The software workflows proposed in the TSC and MSC plans are reviewed in this context, and evaluated against the CM requirements defined in earlier study reports. Recommendations are made to improve the effectiveness of CM while minimizing its impact on the developers
    • …
    corecore