Transmission and Distribution Co-Simulation and Applications
As the penetration of flexible loads and distributed energy resources (DERs) increases in distribution networks, demand dispatch schemes need to consider the effects of large-scale load control on distribution grid reliability. Thus, we need demand dispatch schemes that actively ensure that distribution grid operational constraints are network-admissible and still deliver valuable market services. In this context, this work develops and evaluates the performance of a new network-admissible version of the device-driven demand dispatch scheme called Packetized Energy Management (PEM). Specifically, this work develops and investigates the live grid constraint-based coordinator and metrics for performance evaluation. The effects of grid measurements for a practical-sized, 2,522-bus, unbalanced distribution test feeder with a 3000 flexible kW-scale loads operating under the network-admissible PEM scheme is discussed. The results demonstrate the value of live grid measurements in managing distribution grid operational constraints while PEM can effectively deliver frequency regulation services.
Increased penetration of flexible loads and DERs on distribution system (DS) will lead to increased interaction of transmission and distribution (T&D) system operators to ensure reliable operation of the interconnected power grids, as well as the control actions at LV/MV grid in aggregation will have significant impact on the transmission systems (TS). Thus, a need arises to study the coupling of the transmission and distribution (T&D) systems. Therefore, this work develops a co-simulation platform based on decoupled approach to study integrated T&D systems collectively. Additionally, the results of a decoupled method applied for solving T&D power flow co-simulation is benchmarked against the collaborator developed unified solution which proves the accuracy of the decoupled approach.
The existing approaches in the literature to study steady-state interaction of TS-DS have several shortcomings including that the existing methods exhibit scalability, solve-time and computational memory usage concerns. In this regard, this work develops comprehensive mathematical models of T&D systems for integrated power flow analysis and brings advancements from the algorithmic perspective to efficiently solve large-scale T&D circuits. Further, the models are implemented in low-cost CPU-GPU hybrid computing platform to further speed up the computational performance. The efficacy of the proposed models, solution algorithms, and their hardware implementation are demonstrated with more than 13,000 nodes using an integrated system that consists of 2383-bus Polish TS and multiple instances of medium voltage part of the IEEE 8,500-node DS. Case studies demonstrate that the proposed approach is scalable and can provide more than tenfold speed up on the solve time of very large-scale integrated T&D systems.
Overall, this work develops practically applicable and efficient demand dispatch coordinator able to integrate DERs into DS while ensuring the grid operational constraints are not violated. Additionally, the dynamics introduced in the DS with such integration that travels to TS is also studied collectively using integrated T&D co-simulation and in the final step, a mathematically comprehensive model tackles the scalability, solve-time and computational memory usage concerns for large scale integrated T&D co-simulation and applications
A virtual power plant model for time-driven power flow calculations
This paper presents the implementation of a custom-made virtual power plant model in OpenDSS. The goal is to develop a model adequate for time-driven power flow calculations in distribution systems. The virtual power plant is modeled as the aggregation of renewable generation and energy storage connected to the distribution system through an inverter. The implemented operation mode allows the virtual power plant to act as a single dispatchable generation unit. The case studies presented in the paper demonstrate that the model behaves according to the specified control algorithm and show how it can be incorporated into the solution scheme of a general parallel genetic algorithm in order to obtain the optimal day-ahead dispatch. Simulation results exhibit a clear benefit from the deployment of a virtual power plant when compared to distributed generation based only on renewable intermittent generation.Peer ReviewedPostprint (published version
Recommended from our members
Provision of secondary frequency regulation by coordinated dispatch of industrial loads and thermal power plants
Demand responsive industrial loads with high thermal inertia have potential to provide ancillary service for frequency regulation in the power market. To capture the benefit, this study proposes a new hierarchical framework to coordinate the demand responsive industrial loads with thermal power plants in an industrial park for secondary frequency control. In the proposed framework, demand responsive loads and generating resources are coordinated for optimal dispatch in two-time scales: (1) the regulation reserve of the industrial park is optimally scheduled in a day-ahead manner. The stochastic regulation signal is replaced by the specific extremely trajectories. Furthermore, the extremely trajectories are achieved by the day-ahead predicted regulation mileage. The resulting benefit is to transform the stochastic reserve scheduling problem into a deterministic optimization; (2) a model predictive control strategy is proposed to dispatch the industry park in real time with an objective to maximize the revenue. The proposed technology is tested using a real-world industrial electrolysis power system based upon Pennsylvania, Jersey, and Maryland (PJM) power market. Various scenarios are simulated to study the performance of the proposed approach to enable industry parks to provide ancillary service into the power market. The simulation results indicate that an industrial park with a capacity of 500 MW can provide up to 40 MW ancillary service for participation in the secondary frequency regulation. The proposed strategy is demonstrated to be capable of maintaining the economic and secure operation of the industrial park while satisfying performance requirements from the real world regulation market
Recommended from our members
An Assessment of PIER Electric Grid Research 2003-2014 White Paper
This white paper describes the circumstances in California around the turn of the 21st century that led the California Energy Commission (CEC) to direct additional Public Interest Energy Research funds to address critical electric grid issues, especially those arising from integrating high penetrations of variable renewable generation with the electric grid. It contains an assessment of the beneficial science and technology advances of the resultant portfolio of electric grid research projects administered under the direction of the CEC by a competitively selected contractor, the University of California’s California Institute for Energy and the Environment, from 2003-2014
- …