2,778 research outputs found
Multiobjective strategies for New Product Development in the pharmaceutical industry
New Product Development (NPD) constitutes a challenging problem in the pharmaceutical industry, due to the characteristics of the development pipeline. Formally, the NPD problem can be stated as follows: select a set of R&D projects from a pool of candidate projects in order to satisfy several criteria (economic profitability, time to market) while coping with the uncertain nature of the projects. More precisely, the recurrent key issues are to determine the projects to develop once target molecules have been identified, their order and the level of resources to assign. In this context, the proposed approach combines discrete event stochastic simulation (Monte Carlo approach) with multiobjective genetic algorithms (NSGAII type, Non-Sorted Genetic Algorithm II) to optimize the highly combinatorial portfolio management problem. In that context, Genetic Algorithms (GAs) are particularly attractive for treating this kind of problem, due to their ability to directly lead to the so-called Pareto front and to account for the combinatorial aspect. This work is illustrated with a study case involving nine interdependent new product candidates targeting three diseases. An analysis is performed for this test bench on the different pairs of criteria both for the bi- and tricriteria optimization: large portfolios cause resource queues and delays time to launch and are eliminated by the bi- and tricriteria optimization strategy. The optimization strategy is thus interesting to detect the sequence candidates. Time is an important criterion to consider simultaneously with NPV and risk criteria. The order in which drugs are released in the pipeline is of great importance as with scheduling problems
A bi-objective genetic algorithm approach to risk mitigation in project scheduling
A problem of risk mitigation in project scheduling is formulated as a bi-objective optimization problem, where the expected makespan and the expected total cost are both to be minimized. The expected total cost is the sum of four cost components: overhead cost, activity execution cost, cost of reducing risks and penalty cost for tardiness. Risks for activities are predefined. For each risk at an activity, various levels are defined, which correspond to the results of different preventive measures. Only those risks with a probable impact on the duration of the related activity are considered here. Impacts of risks are not only accounted for through the expected makespan but are also translated into cost and thus have an impact on the expected total cost. An MIP model and a heuristic solution approach based on genetic algorithms (GAs) is proposed. The experiments conducted indicate that GAs provide a fast and effective solution approach to the problem. For smaller problems, the results obtained by the GA are very good. For larger problems, there is room for improvement
Multiobjective strategies for New Product Development in the pharmaceutical industry
New Product Development (NPD) constitutes a challenging problem in the pharmaceutical industry, due to the characteristics of the development pipeline. Formally, the NPD problem can be stated as follows: select a set of R&D projects from a pool of candidate projects in order to satisfy several criteria (economic profitability, time to market) while coping with the uncertain nature of the projects. More precisely, the recurrent key issues are to determine the projects to develop once target molecules have been identified, their order and the level of resources to assign. In this context, the proposed approach combines discrete event stochastic simulation (Monte Carlo approach) with multiobjective genetic algorithms (NSGAII type, Non-Sorted Genetic Algorithm II) to optimize the highly combinatorial portfolio management problem. In that context, Genetic Algorithms (GAs) are particularly attractive for treating this kind of problem, due to their ability to directly lead to the so-called Pareto front and to account for the combinatorial aspect. This work is illustrated with a study case involving nine interdependent new product candidates targeting three diseases. An analysis is performed for this test bench on the different pairs of criteria both for the bi- and tricriteria optimization: large portfolios cause resource queues and delays time to launch and are eliminated by the bi- and tricriteria optimization strategy. The optimization strategy is thus interesting to detect the sequence candidates. Time is an important criterion to consider simultaneously with NPV and risk criteria. The order in which drugs are released in the pipeline is of great importance as with scheduling problems
An Interactive Fuzzy Satisficing Method for Multiobjective Stochastic Integer Programming Problems through Simple Recourse Model
Two major approaches to deal with randomness or impression involved in mathematical programming problems have been developed. The one is called stochastic programming,
and the other is called fuzzy programming. In this paper, we focus on multiobjective integer programming problems involving random variable coefficients in constraints. Using the concept of simple recourse, such multiobjective stochastic integer programming problems are transformed into deterministic ones. As a fusion of stochastic programming and fuzzy one, after introducing fuzzy goals to reflect the ambiguity of the decision maker's judgments for objective functions, we propose an interactive fuzzy satisficing method to derive a satisficing solution for the decision maker by updating the reference membership levels
Recommended from our members
Decision support for build-to-order supply chain management through multiobjective optimization
This is the post-print version of the final paper published in International Journal of Production Economics. The published article is available from the link below. Changes resulting from the publishing process, such as peer review, editing, corrections, structural formatting, and other quality control mechanisms may not be reflected in this document. Changes may have been made to this work since it was submitted for publication. Copyright @ 2010 Elsevier B.V.This paper aims to identify the gaps in decision-making support based on multiobjective optimization (MOO) for build-to-order supply chain management (BTO-SCM). To this end, it reviews the literature available on modelling build-to-order supply chains (BTO-SC) with the focus on adopting MOO techniques as a decision support tool. The literature has been classified based on the nature of the decisions in different part of the supply chain, and the key decision areas across a typical BTO-SC are discussed in detail. Available software packages suitable for supporting decision making in BTO supply chains are also identified and their related solutions are outlined. The gap between the modelling and optimization techniques developed in the literature and the decision support needed in practice are highlighted. Future research directions to better exploit the decision support capabilities of MOO are proposed. These include: reformulation of the extant optimization models with a MOO perspective, development of decision supports for interfaces not involving manufacturers, development of scenarios around service-based objectives, development of efficient solution tools, considering the interests of each supply chain party as a separate objective to account for fair treatment of their requirements, and applying the existing methodologies on real-life data sets.Brunel Research Initiative and Enterprise Fund (BRIEF
Petroleum Refinery Planning Under Uncertainty: A Multiobjective Optimization Approach with Economic and Operational Risk Management
In the current modernized globalization era, crude oil prices have reached a record high of USD 147 per barrel according to the NYMEX exchange on June 2008. It is forecast to spiral upwards (with the current graph trend) to a much higher price level. The current situation of fluctuating high petroleum crude oil prices is affecting the markets and industries worldwide by the uncertainty and volatility of the petroleum industry. As oil refining is the downstream of the petroleum industry, it is increasingly important for refineries to operate at an optimal level in the presence of volatility of crude oil prices. Downstream refineries must assess the potential impact that may affect its optimal profit margin by considering the costs of purchasing the raw material of crude oils and prices of saleable intermediates and products as well as production yields. With optimization, refinery will be able to operate at optimal condition.
In this work, we have attempted to solve model formulation concerning the petroleum refinery planning under uncertainty. We use stochastic programming optimization incorporating the weighted sum method as well as the epsilon constraint method to solve the model formulation of the petroleum refinery planning under uncertainty.
The objective of this research project is to formulate a deterministic model followed by a two stage stochastic programming model with recourse problem for a petroleum refinery planning. The two stage stochastic risk model is then reformulated using Mean Absolute Deviation as the risk measure. After formulating the stochastic model using Mean Absolute Deviation, the problem is then investigated using the Pareto front solution of efficient frontier of the resulting multiobjective optimization problem by using the Weighted Sum Method as well as the ε-constraint method in order to obtain the Pareto Optimal Curve which generates a wide selection of optimization solutions for our problem. The implementation of the multiobjective optimization problem is then automated to report the model solution by capturing the solution values using the GAMS looping system. Note that some of the major parameters used throughout the formulated stochastic programming model include prices of the raw material crude oil and saleable products, market demands for products, and production yields.
The main contribution on this work in the first part is to conduct a further study/research on the implementation of the model formulation in Khor et al. (2008) where the model formulated by Khor et al. (2008) uses variance as the risk measure. The results obtain in the previous paper will be compared with the method in this paper that incorporates Mean Absolute Deviation as the risk measure. To further study the model formulated, the solution obtain is further enhanced using the Weighted Sum Method as well as the Epsilon constraint method to obtain the Pareto Optimal Curve generation. Hence, most of the exposition on the model formulation and solution algorithms are taken directly from the original paper so as to provide the readers with the most accurate information possible
Recommended from our members
Toward improved calibration of hydrologic models: Multiple and noncommensurable measures of information
Several contributions to the hydrological literature have brought into question the continued usefulness of the classical paradigm for hydrologic model calibration. With the growing popularity of sophisticated 'physically based' watershed models (e.g., landsurface hydrology and hydrochemical models) the complexity of the calibration problem has been multiplied many fold. We disagree with the seemingly widespread conviction that the model calibration problem will simply disappear with the availability of more and better field measurements. This paper suggests that the emergence of a new and more powerful model calibration paradigm must include recognition of the inherent multiobjective nature of the problem and must explicitly recognize the role of model error. The results of our preliminary studies are presented. Through an illustrative case study we show that the multiobjective approach is not only practical and relatively simple to implement but can also provide useful information about the limitations of a model
Recommended from our members
Decision support for build-to-order supply chain management through multiobjective optimization
This paper aims to identify the gaps in decision-making support based on
multiobjective optimization for build-to-order supply chain management (BTOSCM).
To this end, it reviews the literature available on modelling build-to-order
supply chains (BTO-SC) with the focus on adopting multiobjective optimization
(MOO) techniques as a decision support tool. The literature has been classified based
on the nature of the decisions in different part of the supply chain, and the key
decision areas across a typical BTO-SC are discussed in detail. Available software
packages suitable for supporting decision making in BTO supply chains are also
identified and their related solutions are outlined. The gap between the modelling and
optimization techniques developed in the literature and the decision support needed in
practice are highlighted and future research directions to better exploit the decision
support capabilities of MOO are proposed
- …