Planning and Scheduling Optimization
Although planning and scheduling optimization have been explored in the literature for many years now, it still remains a hot topic in the current scientific research. The changing market trends, globalization, technical and technological progress, and sustainability considerations make it necessary to deal with new optimization challenges in modern manufacturing, engineering, and healthcare systems. This book provides an overview of the recent advances in different areas connected with operations research models and other applications of intelligent computing techniques used for planning and scheduling optimization. The wide range of theoretical and practical research findings reported in this book confirms that the planning and scheduling problem is a complex issue that is present in different industrial sectors and organizations and opens promising and dynamic perspectives of research and development
An approach for the production scheduling problem when lot streaming is enabled at the operational level
By means of the present work, the production scheduling and the lot streaming problems are simultaneously addressed at flexible manufacturing environments. The proposal is based on a Constraint Programming (CP) formulation that can efficiently tackle the scheduling of manufacturing operations and the splitting of lots into smaller sublots. The approach is capable to define the number of sublots for each lot and the number of parts belonging to each sublot, as well as the assignment of the operations on sublots to machines, with their corresponding start and completion times. The CP model can be easily adapted to cope with different problem issues and several operational policies, which constitutes the main novelty of the contribution. A set of case studies were solved in order to validate the proposal and good quality solutions were found when minimizing the makespan.Sociedad Argentina de Informática e Investigación Operativ
An approach for the production scheduling problem when lot streaming is enabled at the operational level
By means of the present work, the production scheduling and the lot streaming problems are simultaneously addressed at flexible manufacturing environments. The proposal is based on a Constraint Programming (CP) formulation that can efficiently tackle the scheduling of manufacturing operations and the splitting of lots into smaller sublots. The approach is capable to define the number of sublots for each lot and the number of parts belonging to each sublot, as well as the assignment of the operations on sublots to machines, with their corresponding start and completion times. The CP model can be easily adapted to cope with different problem issues and several operational policies, which constitutes the main novelty of the contribution. A set of case studies were solved in order to validate the proposal and good quality solutions were found when minimizing the makespan.Sociedad Argentina de Informática e Investigación Operativ
An approach for the production scheduling problem when lot streaming is enabled at the operational level
By means of the present work, the production scheduling and the lot streaming problems are simultaneously addressed at flexible manufacturing environments. The proposal is based on a Constraint Programming (CP) formulation that can efficiently tackle the scheduling of manufacturing operations and the splitting of lots into smaller sublots. The approach is capable to define the number of sublots for each lot and the number of parts belonging to each sublot, as well as the assignment of the operations on sublots to machines, with their corresponding start and completion times. The CP model can be easily adapted to cope with different problem issues and several operational policies, which constitutes the main novelty of the contribution. A set of case studies were solved in order to validate the proposal and good quality solutions were found when minimizing the makespan.Sociedad Argentina de Informática e Investigación Operativ
Research study of state-of-the-art algorithms for flexible job-shop scheduling problem
The paper discusses various approaches used to solve flexible job-shop scheduling problem concentrating on formulations proposed in the last ten years. It mainly refers to the applied metaheuristic techniques which have been exploited in this research area. A comparison of presented approaches is attempted, some concluding insights are highlighted. Finally future research directions are suggested
Recommended from our members
Bi-Criteria Batching and Scheduling in Hybrid Flow Shops
In this research, a bi-criteria batching and scheduling problem is investigated in hybrid flow shop environments, where unrelated-parallel machines are run simultaneously with different capacities and eligibilities in processing, in some stages. The objective is to simultaneously minimize a linear combination of the total weighted completion time and total weighted tardiness. The first favors the producer’s interest by minimizing work-in-process inventory, inventory holding cost, and energy consumption as well as maximizing machine utilization, while the second favors the customers’ interest by maximizing customers’ service level and delivery speed. In particular, it disregards the group technology assumptions (GTAs) by allowing for the possibility of splitting pre-determined groups of jobs into inconsistent batches in order to improve the operational efficiency. A comparison between the group scheduling and batch scheduling approaches reveals the outstanding performance of the batch scheduling approach. As a result, contrary to the GTAs, jobs belonging to a group might be processed on more than one machine as batches, but not all machines may be capable of processing all jobs. A sequence- and machine-dependent setup time is required between each of two consecutively scheduled batches belonging to different groups. Based on manufacturing company policy, the desired lower bounds on batch sizes are considered for the number of jobs assigned to batches. Although, the direction in which all jobs move through production line is the same, some jobs may skip some stages. Furthermore, to reflect real industry requirements, the job release times and the machine availability times are considered to be dynamic, which means not all machines and jobs are available at the beginning of the planning horizon.The problem is formulated with the help of four mixed-integer linear programming (MILP) models. Two out of four MILP models are formulated as two integrated phases, i.e., batching and scheduling phases, with respect to the precedence constraints between each pair of jobs batches and or the position concept within batches. The optimal combination between batch compositions of groups are determined in the batching phase, while the optimal assignment and sequence of batches on machines and sequence of jobs within batches are determined in the scheduling phase, with respect to a set of operational constraints. A batch composition of a group corresponding to a particular stage, determined in the batching phase of the MILP model, represents the number of batches assigned to the group as well as the number and type of jobs belonging to each batch of that group. Since the first and second MILP models lead to unmanageable solution space, the relaxed MILP model, which allocates one and only one job to each batch of each group in each stage, can be developed to focus on the non-dominated solution space. The optimal solutions of MILP models and relaxed MILP model are equal, if and only if the optimal solution of the relaxed MILP model does not violate the desired lower bounds on batch sizes. Since the relaxed MILP model cannot guarantee the optimal solution of the MILP models, a third MILP model is developed by integrating batching and scheduling phases. This MILP model eliminates an exhaustive combination enumeration between batch compositions of all groups in all stages. Although the third MILP model converges to the optimal solution slower than the relaxed MILP model, it guarantees finding the optimal solution of the first and second MILP models. A comparison between four MILP models shows the superior performance of the third MILP model. However, since the problem is strongly NP-hard, it is not possible to find its optimal solution within a reasonable time as the problem size increases from small to medium to large, even by the relaxed MILP model or the fourth MILP model. Therefore, several meta-heuristic algorithms based upon basic local search, basic population-based search, and hybridization of local search and population-based searches are developed, which move back and forth between batching and scheduling phases. Tabu Search (TS) is implemented as a basic local search algorithm, while Tabu Search Path-Relinking (TS PR) is implemented as a local search algorithm enhanced with a population-based structure. TS is incorporated into the framework of path-relinking to exploit the information on good solutions. The TS PR algorithm comprises several distinguishing features including relinking procedures to effectively explore trajectories connecting elite solutions and the methods used to choose the reference solution. Particle Swarm Optimization (PSO) is implemented as a basic population-based algorithm, while Particle Swarm Optimization enhanced with a local search algorithm (PSO LSA) is developed to realize the benefits of batching and, consequently, enhance the quality of solutions.Since there is interdependency between positions of a job in different stages of a hybrid flow shop in batch scheduling, a meta-heuristic algorithm is not capable of capturing these interdependencies and, subsequently, its efficacy can be diminished. In order to capture this interdependency, the non-, partial- complete-, and stage-based interdependency strategy are developed. In the stage-based-interdependency strategy, a complete sequence related to all of the stages is gradually determined, stage by stage. An initial solution finding mechanism is developed to trigger the search into the solution space and generate an initial population. The performances of these algorithms are compared to each other in order to identify which algorithm(s) outperforms the others. Nevertheless, the performances of the best algorithm(s) are evaluated with respect to a tight lower bound obtained from a branch-and-price (B&P) algorithm. The B&P algorithm uses Dantzig-Wolfe decomposition (DWD) to divide the original problem into a master problem and several sub-problems (SPs) corresponding to each stage. The original problem is decomposed into the SPs by three DWDs corresponding to the three MILP models. Although, by applying DWD technique in the first and second MILP models, an exhaustive combination enumeration between batch compositions of all groups in all stages is excluded and, as a result, the SPs are easier to solve than the original problem, they are still strongly NP-hard because of an enormous number of combinations between batch compositions of all groups in each stage. However, the DWD technique corresponding to the relaxed MILP model not only drastically reduces the number of variables and constraints in the SPs, but also eliminates the batching phase of the first and second MILP models. Decomposing the original problem based on the relaxed MILP model and implementing the B&P algorithm cannot guarantee optimal solutions or tight lower bounds of problems unless the number of violations in the desired lower bounds on batch sizes is not significant. Therefore, the third MILP model is decomposed by DWD so that the B&P algorithm is capable of finding tight lower bounds even for large-size instances of the problem. A comparison between the lower bounds obtained from the B&P algorithm and CPLEX reveals the impressive performance of the B&P algorithm, particularly for large-size problems. The evaluation of the best algorithms based upon these tight lower bounds developed by the B&P algorithm, uncovers the outstanding performance of hybrid algorithms compared to the results obtained from CPLEX.Keywords: Dantzig-Wolfe Decomposition, Mixed-Integer Linear Programming Model, Branch-and-Price Optimization Algorithm, Sequence- and Machine-Dependent Setup Time, Column Generation, Group Scheduling, Particle Swarm Optimization, Batching and Scheduling, Hybrid Flow Shop, Tabu Search, Desired Lower Bounds on Batch Sizes, Bi-Criteria Objective, Path-Relinkin
Recommended from our members
Bi-Criteria Batching and Scheduling in Hybrid Flow Shops
In this research, a bi-criteria batching and scheduling problem is investigated in hybrid flow shop environments, where unrelated-parallel machines are run simultaneously with different capacities and eligibilities in processing, in some stages. The objective is to simultaneously minimize a linear combination of the total weighted completion time and total weighted tardiness. The first favors the producer’s interest by minimizing work-in-process inventory, inventory holding cost, and energy consumption as well as maximizing machine utilization, while the second favors the customers’ interest by maximizing customers’ service level and delivery speed. In particular, it disregards the group technology assumptions (GTAs) by allowing for the possibility of splitting pre-determined groups of jobs into inconsistent batches in order to improve the operational efficiency. A comparison between the group scheduling and batch scheduling approaches reveals the outstanding performance of the batch scheduling approach. As a result, contrary to the GTAs, jobs belonging to a group might be processed on more than one machine as batches, but not all machines may be capable of processing all jobs. A sequence- and machine-dependent setup time is required between each of two consecutively scheduled batches belonging to different groups. Based on manufacturing company policy, the desired lower bounds on batch sizes are considered for the number of jobs assigned to batches. Although, the direction in which all jobs move through production line is the same, some jobs may skip some stages. Furthermore, to reflect real industry requirements, the job release times and the machine availability times are considered to be dynamic, which means not all machines and jobs are available at the beginning of the planning horizon.The problem is formulated with the help of four mixed-integer linear programming (MILP) models. Two out of four MILP models are formulated as two integrated phases, i.e., batching and scheduling phases, with respect to the precedence constraints between each pair of jobs batches and or the position concept within batches. The optimal combination between batch compositions of groups are determined in the batching phase, while the optimal assignment and sequence of batches on machines and sequence of jobs within batches are determined in the scheduling phase, with respect to a set of operational constraints. A batch composition of a group corresponding to a particular stage, determined in the batching phase of the MILP model, represents the number of batches assigned to the group as well as the number and type of jobs belonging to each batch of that group. Since the first and second MILP models lead to unmanageable solution space, the relaxed MILP model, which allocates one and only one job to each batch of each group in each stage, can be developed to focus on the non-dominated solution space. The optimal solutions of MILP models and relaxed MILP model are equal, if and only if the optimal solution of the relaxed MILP model does not violate the desired lower bounds on batch sizes. Since the relaxed MILP model cannot guarantee the optimal solution of the MILP models, a third MILP model is developed by integrating batching and scheduling phases. This MILP model eliminates an exhaustive combination enumeration between batch compositions of all groups in all stages. Although the third MILP model converges to the optimal solution slower than the relaxed MILP model, it guarantees finding the optimal solution of the first and second MILP models. A comparison between four MILP models shows the superior performance of the third MILP model. However, since the problem is strongly NP-hard, it is not possible to find its optimal solution within a reasonable time as the problem size increases from small to medium to large, even by the relaxed MILP model or the fourth MILP model. Therefore, several meta-heuristic algorithms based upon basic local search, basic population-based search, and hybridization of local search and population-based searches are developed, which move back and forth between batching and scheduling phases. Tabu Search (TS) is implemented as a basic local search algorithm, while Tabu Search Path-Relinking (TS PR) is implemented as a local search algorithm enhanced with a population-based structure. TS is incorporated into the framework of path-relinking to exploit the information on good solutions. The TS PR algorithm comprises several distinguishing features including relinking procedures to effectively explore trajectories connecting elite solutions and the methods used to choose the reference solution. Particle Swarm Optimization (PSO) is implemented as a basic population-based algorithm, while Particle Swarm Optimization enhanced with a local search algorithm (PSO LSA) is developed to realize the benefits of batching and, consequently, enhance the quality of solutions.Since there is interdependency between positions of a job in different stages of a hybrid flow shop in batch scheduling, a meta-heuristic algorithm is not capable of capturing these interdependencies and, subsequently, its efficacy can be diminished. In order to capture this interdependency, the non-, partial- complete-, and stage-based interdependency strategy are developed. In the stage-based-interdependency strategy, a complete sequence related to all of the stages is gradually determined, stage by stage. An initial solution finding mechanism is developed to trigger the search into the solution space and generate an initial population. The performances of these algorithms are compared to each other in order to identify which algorithm(s) outperforms the others. Nevertheless, the performances of the best algorithm(s) are evaluated with respect to a tight lower bound obtained from a branch-and-price (B&P) algorithm. The B&P algorithm uses Dantzig-Wolfe decomposition (DWD) to divide the original problem into a master problem and several sub-problems (SPs) corresponding to each stage. The original problem is decomposed into the SPs by three DWDs corresponding to the three MILP models. Although, by applying DWD technique in the first and second MILP models, an exhaustive combination enumeration between batch compositions of all groups in all stages is excluded and, as a result, the SPs are easier to solve than the original problem, they are still strongly NP-hard because of an enormous number of combinations between batch compositions of all groups in each stage. However, the DWD technique corresponding to the relaxed MILP model not only drastically reduces the number of variables and constraints in the SPs, but also eliminates the batching phase of the first and second MILP models. Decomposing the original problem based on the relaxed MILP model and implementing the B&P algorithm cannot guarantee optimal solutions or tight lower bounds of problems unless the number of violations in the desired lower bounds on batch sizes is not significant. Therefore, the third MILP model is decomposed by DWD so that the B&P algorithm is capable of finding tight lower bounds even for large-size instances of the problem. A comparison between the lower bounds obtained from the B&P algorithm and CPLEX reveals the impressive performance of the B&P algorithm, particularly for large-size problems. The evaluation of the best algorithms based upon these tight lower bounds developed by the B&P algorithm, uncovers the outstanding performance of hybrid algorithms compared to the results obtained from CPLEX.Keywords: Bi-Criteria Objective, Column Generation, Batch Scheduling, Tabu Search, Batching and Scheduling, Desired Lower Bounds on Batch Sizes, Path-Relinking, Branch-and-Price Optimization Algorithm, Particle Swarm Optimization, Group Scheduling, Hybrid Flow Shop, Dantzig-Wolfe Decomposition, Mixed-Integer Linear Programming Model, Sequence- and Machine-Dependent Setup Tim
Particle Swarm Optimization
Particle swarm optimization (PSO) is a population based stochastic optimization technique influenced by the social behavior of bird flocking or fish schooling.PSO shares many similarities with evolutionary computation techniques such as Genetic Algorithms (GA). The system is initialized with a population of random solutions and searches for optima by updating generations. However, unlike GA, PSO has no evolution operators such as crossover and mutation. In PSO, the potential solutions, called particles, fly through the problem space by following the current optimum particles. This book represents the contributions of the top researchers in this field and will serve as a valuable tool for professionals in this interdisciplinary field
- …