21,990 research outputs found
Recommended from our members
Improving the multi-objective evolutionary optimization algorithm for hydropower reservoir operations in the California Oroville-Thermalito complex
This study demonstrates the application of an improved Evolutionary optimization Algorithm (EA), titled Multi-Objective Complex Evolution Global Optimization Method with Principal Component Analysis and Crowding Distance Operator (MOSPD), for the hydropower reservoir operation of the Oroville-Thermalito Complex (OTC) - a crucial head-water resource for the California State Water Project (SWP). In the OTC's water-hydropower joint management study, the nonlinearity of hydropower generation and the reservoir's water elevation-storage relationship are explicitly formulated by polynomial function in order to closely match realistic situations and reduce linearization approximation errors. Comparison among different curve-fitting methods is conducted to understand the impact of the simplification of reservoir topography. In the optimization algorithm development, techniques of crowding distance and principal component analysis are implemented to improve the diversity and convergence of the optimal solutions towards and along the Pareto optimal set in the objective space. A comparative evaluation among the new algorithm MOSPD, the original Multi-Objective Complex Evolution Global Optimization Method (MOCOM), the Multi-Objective Differential Evolution method (MODE), the Multi-Objective Genetic Algorithm (MOGA), the Multi-Objective Simulated Annealing approach (MOSA), and the Multi-Objective Particle Swarm Optimization scheme (MOPSO) is conducted using the benchmark functions. The results show that best the MOSPD algorithm demonstrated the best and most consistent performance when compared with other algorithms on the test problems. The newly developed algorithm (MOSPD) is further applied to the OTC reservoir releasing problem during the snow melting season in 1998 (wet year), 2000 (normal year) and 2001 (dry year), in which the more spreading and converged non-dominated solutions of MOSPD provide decision makers with better operational alternatives for effectively and efficiently managing the OTC reservoirs in response to the different climates, especially drought, which has become more and more severe and frequent in California
A review on the complementarity of renewable energy sources: concept, metrics, application and future research directions
It is expected, and regionally observed, that energy demand will soon be
covered by a widespread deployment of renewable energy sources. However, the
weather and climate driven energy sources are characterized by a significant
spatial and temporal variability. One of the commonly mentioned solutions to
overcome the mismatch between demand and supply provided by renewable
generation is a hybridization of two or more energy sources in a single power
station (like wind-solar, solar-hydro or solar-wind-hydro). The operation of
hybrid energy sources is based on the complementary nature of renewable
sources. Considering the growing importance of such systems and increasing
number of research activities in this area this paper presents a comprehensive
review of studies which investigated, analyzed, quantified and utilized the
effect of temporal, spatial and spatio-temporal complementarity between
renewable energy sources. The review starts with a brief overview of available
research papers, formulates detailed definition of major concepts, summarizes
current research directions and ends with prospective future research
activities. The review provides a chronological and spatial information with
regard to the studies on the complementarity concept.Comment: 34 pages 7 figures 3 table
Demand response within the energy-for-water-nexus - A review. ESRI WP637, October 2019
A promising tool to achieve more flexibility within power systems is demand re-sponse (DR). End-users in many strands
of industry have been subject to research up to now regarding the opportunities for implementing DR programmes. One sector
that has received little attention from the literature so far, is wastewater treatment. However, case studies indicate that the
potential for wastewater treatment plants to provide DR services might be significant. This review presents and categorises recent
modelling approaches for industrial demand response as well as for the wastewater treatment plant operation. Furthermore, the
main sources of flexibility from wastewater treatment plants are presented: a potential for variable electricity use in aeration, the
time-shifting operation of pumps, the exploitation of built-in redundan-cy in the system and flexibility in the sludge processing.
Although case studies con-note the potential for DR from individual WWTPs, no study acknowledges the en-dogeneity of energy
prices which arises from a large-scale utilisation of DR. There-fore, an integrated energy systems approach is required to quantify
system and market effects effectively
Combined hydro-wind generation bids in a pool-based electricity market
Present regulatory trends are promoting the irect participation of wind energy in electricity markets. The final result of these markets sets the production scheduling for the operation time, including a power commitment from the wind generators. However, wind resources are uncertain, and the final power delivered usually differs from the initial power committed. This imbalance produces an overcost in the system, which must be paid by those who produce it, e.g., wind generators among others. As a result, wind farm revenue decreases, but it could increase by allowing wind farms to submit their bids to the markets together with a hydro generating unit, which may easily modify its production according to the expected imbalance. This paper presents a stochastic optimization technique that maximizes the joint profit of hydro and wind generators in a pool-based electricity market, taking into account the uncertainty of wind power prediction.En prens
Hydro/Battery Hybrid Systems for frequency regulation
An innovative Hydro/Battery Hybrid System (HBHS), composed of a hydropower plant (HPP) and a Battery Energy Storage System (BESS) is proposed to provide frequency regulation services in the Nordic Power System (NPS). The HBHS is envisioned to have a faster and more efficient response compared to HPPs currently providing these services, whilst retaining their high energy capacity and endurance, thus alleviating stand-alone BESS operation constraints. This Thesis aims to explore the operation and optimization of such a hybrid system in order to make it efficient and economically viable. A power plant perspective is employed, evaluating the impact different control algorithms and parameters have on the HBHS performance.
Providing Frequency Containment Reserves for Normal Operation (FCR-N), to the national TSO in Sweden, is defined from technology and market analyses as the use case for the HBHS. The characteristics of HPPs suitable for HBHS implementation are found theoretically, by evaluating HPP operational constraints and regulation mechanisms. With the aim of evaluating the dynamic performance of the proposed HBHS, a frequency regulation model of the NPS is built in MATLAB and Simulink. Two different HBHS architectures are introduced, the Hydro Recharge, in which the BESS is regulating the frequency and the HPP is controlling its state of charge (SoC), and the Frequency Split, in which both elements are regulating the frequency with the HPP additionally compensating for the SoC. The dynamic performance of the units is qualitatively evaluated through existing and proposed FCR-N prequalification tests, prescribed by the TSO and ENTSO-E. Quantitative performance comparison to a benchmark HPP is performed with regards to the estimated HPP regulation wear and tear and BESS degradation during 30-day operation with historical frequency data.
The two proposed HBHS architectures demonstrate significant reductions of estimated HPP wear and tear compared to the benchmark unit. Simulations consistently report a 90 % reduction in the number of movements HPP regulation mechanism performs and a more than 50 % decrease in the distance it travels. The BESS lifetime is evaluated at acceptable levels and compared for different architectures. Two different applications are identified, the first being installing the HBHS to enable the HPP to pass FCR-N prequalification tests. The second application is increasing the FCR-N capacity of the HPP by installing the HBHS. The Frequency Split HBHS shows more efficient performance when installed in the first application, as opposed to the Hydro Recharge HBHS, which shows better performance in the second application. Finally, it is concluded that a large-scale implementation of HBHSs would improve the frequency quality in the NPS, linearly decreasing the amount of time outside the normal frequency band with increasing the total installed HBHS power capacity
Inexactness of the Hydro-Thermal Coordination Semidefinite Relaxation
Hydro-thermal coordination is the problem of determining the optimal economic
dispatch of hydro and thermal power plants over time. The physics of
hydroelectricity generation is commonly simplified in the literature to account
for its fundamentally nonlinear nature. Advances in convex relaxation theory
have allowed the advent of Shor's semidefinite programming (SDP) relaxations of
quadratic models of the problem. This paper shows how a recently published SDP
relaxation is only exact if a very strict condition regarding turbine
efficiency is observed, failing otherwise. It further proposes the use of a set
of convex envelopes as a strategy to successfully obtain a stricter lower bound
of the optimal solution. This strategy is combined with a standard iterative
convex-concave procedure to recover a stationary point of the original
non-convex problem.Comment: Submitted to IEEE PES General Meeting 201
- …