    Optimal Battery Energy Storage Placement for Transient Voltage Stability Enhancement

    Full text link
    A placement problem for multiple Battery Energy Storage System (BESS) units is formulated towards power system transient voltage stability enhancement in this paper. The problem is solved by the Cross-Entropy (CE) optimization method. A simulation-based approach is adopted to incorporate higher-order dynamics and nonlinearities of generators and loads. The objective is to maximize the voltage stability index, which is set up based on certain grid-codes. Formulations of the optimization problem are then discussed. Finally, the proposed approach is implemented in MATLAB/DIgSILENT and tested on the New England 39-Bus system. Results indicate that installing BESS units at the optimized location can alleviate transient voltage instability issue compared with the original system with no BESS. The CE placement algorithm is also compared with the classic PSO (Particle Swarm Optimization) method, and its superiority is demonstrated in terms of fewer iterations for convergence with better solution qualities.Comment: This paper has been accepted by the 2019 IEEE PES General Meeting at Atlanta, GA in August 201

    A review of optimal operation of microgrids

    Get PDF
    The term microgrid refers to small-scale power grid that can operate autonomously or in concurrence with the area’s main electrical grid. The intermittent characteristic of DGs which defies the power quality and voltage manifests the requirement for new planning and operation approaches for microgrids. Consequently, conventional optimization methods in new power systems have been critically biased all through the previous decade. One of the main technological and inexpensive tools in this regard is the optimal generation scheduling of microgrid. As a primary optimization tool in the planning and operation fields, optimal operation has an undeniable part in the power system. This paper reviews and evaluates the optimal operation approaches mostly related to microgrids. In this work, the foremost optimal generation scheduling approaches are compared in terms of their objective functions, techniques and constraints. To conclude, a few fundamental challenges occurring from the latest optimal generation scheduling techniques in microgrids are addressed

    Hybrid ga-socp approach for placement and sizing of distributed generators in DC networks

    Get PDF
    This research addresses the problem of the optimal location and sizing distributed generators (DGs) in direct current (DC) distribution networks from the combinatorial optimization. It is proposed a master–slave optimization approach in order to solve the problems of placement and location of DGs, respectively. The master stage applies to the classical Chu & Beasley genetic algorithm (GA), while the slave stage resolves a second-order cone programming reformulation of the optimal power flow problem for DC grids. This master–slave approach generates a hybrid optimization approach, named GA-SOCP. The main advantage of optimal dimensioning of DGs via SOCP is that this method makes part of the exact mathematical optimization that guarantees the possibility of finding the global optimal solution due to the solution space’s convex structure, which is a clear improvement regarding classical metaheuristic optimization methodologies. Numerical comparisons with hybrid and exact optimization approaches reported in the literature demonstrate the proposed hybrid GA-SOCP approach’s effectiveness and robustness to achieve the global optimal solution. Two test feeders compose of 21 and 69 nodes that can locate three distributed generators are considered. All of the computational validations have been carried out in the MATLAB software and the CVX tool for convex optimization

    Optimal sizing and siting of smart microgrid components under high renewables penetration considering demand response

    Get PDF
    The purpose of this article is to determine the size and place of different components in microgrids (MGs) including renewable energy resources (RERs). Various factors like reliability, the uncertainty of wind speed, solar irradiance, load, and load growth are considered. The Ekbatan residential complex is studied as the pilot case study placed in Tehran, Iran. Ekbatan complex has three separate sets of buildings called phase 1, 2, and 3 considered as smart MGs. The multi‐objective optimisation problem is solved considering RERs uncertainties, improving reliability and power quality and minimizing power loss by particle swarm optimisation algorithm. Different constraints in terms of voltage, frequency, resources, and energy storage systems (ESSs) capacity are taken into consideration. The effect of load growth, photovoltaic (PV) and ESSs placement, changing the capital cost of RERs, and demand response of controllable loads are studied on optimal sizing and siting. The proposed method is tested on a wind turbine/PV/fuel cell (FC)/hydrogen tank MGs system and the optimal sizing and siting of mentioned sources could decelerate the rate of increase in the total cost of MG considering the load growth.©2019 IET. This paper is a postprint of a paper submitted to and accepted for publication in IET Renewable Power Generation and is subject to Institution of Engineering and Technology Copyright. The copy of record is available at the IET Digital Library.fi=vertaisarvioitu|en=peerReviewed

    Improving estimates for reliability and cost in microgrid investment planning models

    Get PDF
    This paper develops a new microgrid investment planning model that determines cost-optimal investment and operation of distributed energy resources (DERs) in a microgrid. We formulate the problem in a bilevel framework, using particle swarm optimization to determine investment and the DER-CAM model (Distributed Energy Resources Customer Adoption Model) to determine operation. The model further uses sequential Monte Carlo simulation to explicitly simulate power outages and integrates time-varying customer damage functions to calculate interruption costs from outages. The model treats nonlinearities in reliability evaluation directly, where existing linear models make critical simplifying assumptions. It combines investment, operating, and interruption costs together in a single objective function, thereby treating reliability endogenously and finding the cost-optimal trade-off between cost and reliability - two competing objectives. In benchmarking against a version of the DER-CAM model that treats reliability through a constraint on minimum investment, our new model improves estimates of reliability (the loss of load expectation) by up to 600%, of the total system cost by 6%-18%, of the investment cost by 32%-50%, and of the economic benefit of investing 27%-47%. Improvements stem from large differences in investment of up to 56% for natural gas generators, solar photovoltaics, and battery energy storage

    Load frequency controllers considering renewable energy integration in power system

    Get PDF
    Abstract: Load frequency control or automatic generation control is one of the main operations that take place daily in a modern power system. The objectives of load frequency control are to maintain power balance between interconnected areas and to control the power flow in the tie-lines. Electric power cannot be stored in large quantity that is why its production must be equal to the consumption in each time. This equation constitutes the key for a good management of any power system and introduces the need of more controllers when taking into account the integration of renewable energy sources into the traditional power system. There are many controllers presented in the literature and this work reviews the traditional load frequency controllers and those, which combined the traditional controller and artificial intelligence algorithms for controlling the load frequency