134 research outputs found

    A Comparative Study for enhancing PV Penetration limit of a LV CIGRE Residential Network with Distributed Grid-Tie Single-Phase PV Systems

    Get PDF
    Photovoltaic distributed generation (PVDG) has seen tremendous growth in recent years, especially in the residential sector. Among other concerns, the voltage rise in AC networks is considered the most limiting factor in achieving increased PV penetration levels. A steady-state impact study is performed on a CIGRE low-voltage (LV) residential network. This paper compares six techniques to increase the PV penetration limit in the LV residential network, namely single-phase penetration (SPP), Distribution Scheme 1 (DS1), Distribution Scheme 2 (DS2), alternate phase penetration (APP), offline tap adjustment (OTA) and switched on-load tap adjustment (SOLTA). PSCAD software is used for this study. The best results are obtained for the DS2-SOLTA case that gives the minimum voltage magnitude and voltage unbalance in the system. The steady-state results are validated by a dynamic data study using measured solar irradiance and residential load data. A novel approach is also proposed for calculating the worst day from the data set. The obtained results verify the effectiveness of the proposed approach

    Optimal Voltage Regulation of Unbalanced Distribution Networks with Coordination of OLTC and PV Generation

    Full text link
    Photovoltaic (PV) smart inverters can regulate voltage in distribution systems by modulating reactive power of PV systems. In this paper, an optimization framework for optimal coordination of reactive power injection of smart inverters and tap operations of voltage regulators for multi-phase unbalanced distribution systems is proposed. Optimization objectives are minimization of voltage deviations and tap operations. A novel linearization method convexifies the problem and speeds up the solution. The proposed method is validated against conventional rule-based autonomous voltage regulation (AVR) on the highly-unbalanced IEEE 37 bus test system. Simulation results show that the proposed method estimates feeder voltage accurately, voltage deviation reductions are significant, over-voltage problems are mitigated, and voltage imbalance is reduced.Comment: IEEE Power and Energy Society General Meeting 201

    Coordination of OLTC and Smart Inverters for Optimal Voltage Regulation of Unbalanced Distribution Networks

    Full text link
    Photovoltaic (PV) smart inverters can improve the voltage profile of distribution networks. A multi-objective optimization framework for coordination of reactive power injection of smart inverters and tap operations of on-load tap changers (OLTCs) for multi-phase unbalanced distribution systems is proposed. The optimization objective is to minimize voltage deviations and the number of tap operations simultaneously. A novel linearization method is proposed to linearize power flow equations and to convexify the problem, which guarantees convergence of the optimization and less computation costs. The optimization is modeled and solved using mixed-integer linear programming (MILP). The proposed method is validated against conventional rule-based autonomous voltage regulation (AVR) on the highly-unbalanced modified IEEE 37 bus test system and a large California utility feeder. Simulation results show that the proposed method accurately estimates feeder voltage, significantly reduces voltage deviations, mitigates over-voltage problems, and reduces voltage unbalance while eliminating unnecessary tap operations. The robustness of the method is validated against various levels of forecast error. The computational efficiency and scalability of the proposed approach are also demonstrated through the simulations on the large utility feeder.Comment: Accepted for Electric Power Systems Research. arXiv admin note: text overlap with arXiv:1901.0950

    A Review and Synthesis of the Outcomes from Low Carbon Networks Fund Projects

    Get PDF
    The Low Carbon Networks Fund (LCNF) was established by Ofgem in 2009 with an objective to “help Distribution Network Operators (DNOs) understand how they provide security of supply at value for money and facilitate transition to the low carbon economy”. The £500m fund operated in a tiered format, funding small scale projects as Tier 1 and running a Tier 2 annual competitive process to fund a smaller number of large projects. By 31st March 2015, forty Tier 1 projects and twenty-three Tier 2 projects had been approved with project budgets totalling £29.5m and £220.3m respectively. The LCNF governance arrangements state that projects should focus on the trialling of: new equipment (more specifically, that unproven in GB), novel arrangements or applications of existing equipment, novel operational practices, or novel commercial arrangements. The requirement that learning gained from projects could be disseminated was a key feature of the LCNF. The motivation for the review reported here was a recognition that significant learning and data had been generated from a large volume of project activity but, with so many individual reports published, that it was difficult for outside observers to identify clear messages with respect to the innovations investigated under the programme. This review is therefore intended to identify, categorise and synthesise the learning outcomes published by LCNF projects up to December 2015

    Analysis of Large Scale PV Systems with Energy Storage to a Utility Grid

    Get PDF
    With electric distribution network operators experiencing an exponential increase in distributed energy resource connections to the power grid, operational challenges arise attributable to the traditional methods of building distribution feeders. Photovoltaic (PV) solar systems are the major contributor due to recent technological advancements. Though this renewable energy resource is beneficial to human society, unfavorable electrical conditions can arise from the inherit variability of solar energy. Extreme variability of power injection can force excessive operations of voltage regulation equipment and potentially degrade customer voltage quality. If managed and controlled properly, battery energy storage systems installed on a distribution feeder have the ability to compliment solar generation and dampen the negative effects of solar generation. Now that customers are connecting their own generation, the traditional design assumption of load flowing from substation to customer is nullified. This research aims first to capture the maximum amount of generation that can be connected to a distribution feeder. Numerous deployments of generation scenarios are applied on six unique distribution feeders to conclude that hosting capacity is dependent on interconnect location. Then, existing controllers installed on voltage regulation equipment are modeled in detail. High resolution time series analysis driven from historical measurements is conducted on two contrasting feeders with specific PV generator deployments. With the proper modeling of on-load tap changer controls, excessive operations caused by extreme PV generation swings were captured. Several services that battery energy storage systems can provide when connected to an individual distribution feeder with significant PV generation include long term absorption of excessive PV generation, dynamic response to extreme PV generation ramping, and release of stored energy for system peak shaving. A centralized master energy coordinator is proposed with the ability to dispatch the battery system in such a fashion to implement each service throughout consecutive days of operation. This solution was built by integrating load and solar energy forecasting predictions in order to construct an optimum charging and discharging schedule that would maximize the asset’s lifespan. Multiple load and solar generation scenarios including a consecutive three day run is included to verify the robustness of this energy coordinator

    Deliverable 4.1 "Assessment of potential LV network solutions"

    Get PDF

    Battery Energy Storage Systems for Low Voltage Network Management

    Get PDF
    With increasing concern for the security and environmental sustainability of the UK energy supply, the penetration of low carbon technologies on the grid has increased significantly. As the installed capacity of residential rooftop PV systems increases in the UK, the likelihood that LV networks will experience unacceptably high voltages and line utilizations increases also. Furthermore, an increased penetration of ASHP systems increases the likelihood of unacceptably low voltages and ampacity violations during winter periods. Such network stresses are typically managed via reconductoring or redesign, but effective control of behind-the-meter BESSs may allow distribution network operator DNOs to delay traditional reinforcement. However, there is little consideration for the technical and economic barriers to BESS based violation management in current literature. In this thesis, a series of mixed-integer quadratically constrained programming (MIQCP) formulations that determine optimal customer BESS takeover for violation control at various PV & ASHP penetrations are designed, a multi-period mixed integer linear programming (MILP) BESS placement and sizing model that optimally locates 3rd party owned BESSs systems is formulated, and a real time dispatch algorithm based on a 2-stage convex linear programming (LP) heuristic is developed. These algorithms are applied to 6 networks located in the northwest of England to examine the technical feasibility of BESS control under varying PV penetrations, and BESS based control of ASHP demand on urban and suburban feeders is examined. The feasibility of BESS control for violation management in both the customer owned and DNO owned case are considered. It is found that the costs associated with deploying behind-the-meter BESSs for the purpose of violation control greatly exceed those of reconductoring In the DNO-owned BESS case, and that significant technical barriers to the use of BESSs for violation control exist in the customer owned BESS case when violations are controlled using BESSs alone

    Coordinated active power reduction strategy for voltage rise mitigation in LV distribution network

    Get PDF
    Integration of renewable energy systems by the utility, customers, and the third party into the electric power system, most especially in the MV and LV distribution networks grew over the last decade due to the liberalization of the electricity market, rising energy demand, and increasing environmental concern. The distributed rooftop PV system contributes to relieve the overall load, reduce losses, avoid conventional generation upgrade, and better matching of demand on the LV distribution network. Originally, the LV distribution network is designed for unidirectional current flow, that is from the substation to customers. However, a high penetration of rooftop solar PVs (with power levels typically ranging from 1 – 10 kW) may lead to the current flowing in the reverse direction and this could result in a sudden voltage rise. These negative impacts on the network have discouraged the distribution network operators (DNOs) to allow increased PV penetration in the LV distribution network because some customers load, and equipment are sensitive to voltage perturbation. Presently, the most applied voltage rise mitigation strategy for high rooftop solar PV penetration is the total disconnect from the LV distribution network when the voltage at the point of common coupling (PCC) goes above statutory voltage limits. However, the sudden disconnection of the PV system from the grid can cause network perturbation and affect the security of the network. This action may also cause voltage instability in the network and can reduce the lifetime of grid equipment such as voltage regulators, air conditioner etc. Due to this negative impact, different voltage rise mitigation strategies such as the active transformer with on load tap changers (OLTC), distributed battery energy storage system and reactive power support (D-STATCOM, etc.) have been used to curtail voltage rise in the distribution network. However, the implementation of D-STATCOM device on a radial LV distribution network results in high line current and losses. This may be detrimental to the distribution network. Therefore, in this thesis, a coordinated active power reduction (CAPR) strategy is proposed using a modified PWM PI current control strategy to ramp down the output power and voltage of a grid-tied voltage source inverter (VSI). In the proposed strategy, a reactive reference is generated based on the measured voltage level at the PCC using a threshold voltage algorithm to regulate the amplitude of the modulating signal to increase the off time of the high frequency signal which shut down the PV array momentary in an extremely short time and allow the VSI to absorb some reactive power through the freewheeling diode and reduce voltage. The proposed CAPR strategy was designed and simulated on a scaled down simple radial LV distribution network in MATLAB®/Simulink® software environment. The results show that the CAPR can ramp down the PV output power, reduce reverse power flow and reduce the sudden voltage rise at the point of common coupling (PCC) within ±5% of the standard voltage limit. The study also compares the performance of the proposed CAPR strategy to that of the distributed static compensator (D-STATCOM) and battery energy storage system (BESS) with respect to response time to curtail sudden voltage rise, losses and reverse power flow. The investigation shows that the D-STATCOM has the faster response time to curtail voltage rise. However, the voltage rise reduction is accompanied by high current, losses and reverse active power flow. The introduction of the BESS demonstrates better performance than the D- STATCOM device in terms of reverse power flow and losses. The CAPR strategy performs better than both D-STATCOM and BESS in terms of line losses and reverse power flow reduction
    • …