1,163 research outputs found

    A hybrid dual-population genetic algorithm for the single machine maximum lateness problem

    Get PDF
    We consider the problem of scheduling a number of jobs, each job having a release time, a processing time and a due date, on a single machine with the objective of minimizing the maximum lateness. We developed a hybrid dual-population genetic algorithm and compared its performance with alternative methods on a new diverse data set. Extensions from a single to a dual population by taking problem specific characteristics into account can be seen as a stimulator to add diversity in the search process, which has a positive influence on the important balance between intensification and diversification. Based on a comprehensive literature study on genetic algorithms in single machine scheduling, a fair comparison of genetic operators was made

    Design and Analysis of an Estimation of Distribution Approximation Algorithm for Single Machine Scheduling in Uncertain Environments

    Full text link
    In the current work we introduce a novel estimation of distribution algorithm to tackle a hard combinatorial optimization problem, namely the single-machine scheduling problem, with uncertain delivery times. The majority of the existing research coping with optimization problems in uncertain environment aims at finding a single sufficiently robust solution so that random noise and unpredictable circumstances would have the least possible detrimental effect on the quality of the solution. The measures of robustness are usually based on various kinds of empirically designed averaging techniques. In contrast to the previous work, our algorithm aims at finding a collection of robust schedules that allow for a more informative decision making. The notion of robustness is measured quantitatively in terms of the classical mathematical notion of a norm on a vector space. We provide a theoretical insight into the relationship between the properties of the probability distribution over the uncertain delivery times and the robustness quality of the schedules produced by the algorithm after a polynomial runtime in terms of approximation ratios

    A survey of scheduling problems with setup times or costs

    Get PDF
    Author name used in this publication: C. T. NgAuthor name used in this publication: T. C. E. Cheng2007-2008 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe

    The integration of process planning and machine loading in small batch part manufacturing

    Get PDF
    PART is a highly automated planning system in which both process and production planning functions are integrated. This paper discusses a method to improve machine tool selection in process planning by integration with loading. A method is presented to select the best process plan from a number of possible alternatives taking into account the limited availability of resources. Various aspects of the quality of a process plan are evaluated and expressed in the so-called evaluation time. To prevent redundant work, partly worked out process plans are considered as alternatives. The consequences of the different alternatives have to be estimated which includes the estimation of machining times. The loading problem is modelled as the minimization of the total evaluation time for a given order set, subjected to capacity constraints

    A new mathematical model for single machine batch scheduling problem for minimizing maximum lateness with deteriorating jobs

    Get PDF
    This paper presents a mathematical model for the problem of minimizing the maximum lateness on a single machine when the deteriorated jobs are delivered to each customer in various size batches. In reality, this issue may happen within a supply chain in which delivering goods to customers entails cost. Under such situation, keeping completed jobs to deliver in batches may result in reducing delivery costs. In literature review of batch scheduling, minimizing the maximum lateness is known as NP-Hard problem; therefore the present issue aiming at minimizing the costs of delivering, in addition to the aforementioned objective function, remains an NP-Hard problem. In order to solve the proposed model, a Simulation annealing meta-heuristic is used, where the parameters are calibrated by Taguchi approach and the results are compared to the global optimal values generated by Lingo 10 software. Furthermore, in order to check the efficiency of proposed method to solve larger scales of problem, a lower bound is generated. The results are also analyzed based on the effective factors of the problem. Computational study validates the efficiency and the accuracy of the presented model

    Batch scheduling to minimize maximum lateness

    Get PDF
    Cataloged from PDF version of article.We address the single-machine batch scheduling problem which arises when there are job families and setup requirements exist between these families; our objective is to minimize the maximum lateness. As our main result, we give an improved dynamic program for the solution of the problem. © 1997 Elsevier Science B.V

    Minimizing value-at-risk in the single-machine total weighted tardiness problem

    Get PDF
    The vast majority of the machine scheduling literature focuses on deterministic problems, in which all data is known with certainty a priori. This may be a reasonable assumption when the variability in the problem parameters is low. However, as variability in the parameters increases incorporating this uncertainty explicitly into a scheduling model is essential to mitigate the resulting adverse effects. In this paper, we consider the celebrated single-machine total weighted tardiness (TWT) problem in the presence of uncertain problem parameters. We impose a probabilistic constraint on the random TWT and introduce a risk-averse stochastic programming model. In particular, the objective of the proposed model is to find a non-preemptive static job processing sequence that minimizes the value-at-risk (VaR) measure on the random TWT at a specified confidence level. Furthermore, we develop a lower bound on the optimal VaR that may also benefit alternate solution approaches in the future. In this study, we implement a tabu-search heuristic to obtain reasonably good feasible solutions and present results to demonstrate the effect of the risk parameter and the value of the proposed model with respect to a corresponding risk-neutral approach

    Efficient Heuristics for Scheduling with Release and Delivery Times

    Get PDF
    In this chapter, we describe efficient heuristics for scheduling jobs with release and delivery times with the objective to minimize the maximum job completion time. These heuristics are essentially based on a commonly used scheduling theory in Jackson’s extended heuristic. We present basic structural properties of the solutions delivered by Jackson’s heuristic and then illustrate how one can exploit them to build efficient heuristics