74,372 research outputs found

    A Stochastic Benders Decomposition Scheme for Large-Scale Data-Driven Network Design

    Full text link
    Network design problems involve constructing edges in a transportation or supply chain network to minimize construction and daily operational costs. We study a data-driven version of network design where operational costs are uncertain and estimated using historical data. This problem is notoriously computationally challenging, and instances with as few as fifty nodes cannot be solved to optimality by current decomposition techniques. Accordingly, we propose a stochastic variant of Benders decomposition that mitigates the high computational cost of generating each cut by sampling a subset of the data at each iteration and nonetheless generates deterministically valid cuts (as opposed to the probabilistically valid cuts frequently proposed in the stochastic optimization literature) via a dual averaging technique. We implement both single-cut and multi-cut variants of this Benders decomposition algorithm, as well as a k-cut variant that uses clustering of the historical scenarios. On instances with 100-200 nodes, our algorithm achieves 4-5% optimality gaps, compared with 13-16% for deterministic Benders schemes, and scales to instances with 700 nodes and 50 commodities within hours. Beyond network design, our strategy could be adapted to generic two-stage stochastic mixed-integer optimization problems where second-stage costs are estimated via a sample average

    Multi-objective integer programming: An improved recursive algorithm

    Get PDF
    This paper introduces an improved recursive algorithm to generate the set of all nondominated objective vectors for the Multi-Objective Integer Programming (MOIP) problem. We significantly improve the earlier recursive algorithm of \"Ozlen and Azizo\u{g}lu by using the set of already solved subproblems and their solutions to avoid solving a large number of IPs. A numerical example is presented to explain the workings of the algorithm, and we conduct a series of computational experiments to show the savings that can be obtained. As our experiments show, the improvement becomes more significant as the problems grow larger in terms of the number of objectives.Comment: 11 pages, 6 tables; v2: added more details and a computational stud

    On optimizing over lift-and-project closures

    Full text link
    The lift-and-project closure is the relaxation obtained by computing all lift-and-project cuts from the initial formulation of a mixed integer linear program or equivalently by computing all mixed integer Gomory cuts read from all tableau's corresponding to feasible and infeasible bases. In this paper, we present an algorithm for approximating the value of the lift-and-project closure. The originality of our method is that it is based on a very simple cut generation linear programming problem which is obtained from the original linear relaxation by simply modifying the bounds on the variables and constraints. This separation LP can also be seen as the dual of the cut generation LP used in disjunctive programming procedures with a particular normalization. We study some properties of this separation LP in particular relating it to the equivalence between lift-and-project cuts and Gomory cuts shown by Balas and Perregaard. Finally, we present some computational experiments and comparisons with recent related works

    Multi-project scheduling with 2-stage decomposition

    Get PDF
    A non-preemptive, zero time lag multi-project scheduling problem with multiple modes and limited renewable and nonrenewable resources is considered. A 2-stage decomposition approach is adopted to formulate the problem as a hierarchy of 0-1 mathematical programming models. At stage one, each project is reduced to a macro-activity with macro-modes resulting in a single project network where the objective is the maximization of the net present value and the cash flows are positive. For setting the time horizon three different methods are developed and tested. A genetic algorithm approach is designed for this problem, which is also employed to generate a starting solution for the exact solution procedure. Using the starting times and the resource profiles obtained in stage one each project is scheduled at stage two for minimum makespan. The result of the first stage is subjected to a post-processing procedure to distribute the remaining resource capacities. Three new test problem sets are generated with 81, 84 and 27 problems each and three different configurations of solution procedures are tested

    Single-machine scheduling with stepwise tardiness costs and release times

    Get PDF
    We study a scheduling problem that belongs to the yard operations component of the railroad planning problems, namely the hump sequencing problem. The scheduling problem is characterized as a single-machine problem with stepwise tardiness cost objectives. This is a new scheduling criterion which is also relevant in the context of traditional machine scheduling problems. We produce complexity results that characterize some cases of the problem as pseudo-polynomially solvable. For the difficult-to-solve cases of the problem, we develop mathematical programming formulations, and propose heuristic algorithms. We test the formulations and heuristic algorithms on randomly generated single-machine scheduling problems and real-life datasets for the hump sequencing problem. Our experiments show promising results for both sets of problems