31,569 research outputs found
Computational intelligence approaches to robotics, automation, and control [Volume guest editors]
No abstract available
A Unified Framework for Solving Multiagent Task Assignment Problems
Multiagent task assignment problem descriptors do not fully represent the complex interactions in a multiagent domain, and algorithmic solutions vary widely depending on how the domain is represented. This issue is compounded as related research fields contain descriptors that similarly describe multiagent task assignment problems, including complex domain interactions, but generally do not provide the mechanisms needed to solve the multiagent aspect of task assignment. This research presents a unified approach to representing and solving the multiagent task assignment problem for complex problem domains. Ideas central to multiagent task allocation, project scheduling, constraint satisfaction, and coalition formation are combined to form the basis of the constrained multiagent task scheduling (CMTS) problem. Basic analysis reveals the exponential size of the solution space for a CMTS problem, approximated by O(2n(m+n)) based on the number of agents and tasks involved in a problem. The shape of the solution space is shown to contain numerous discontinuous regions due to the complexities involved in relational constraints defined between agents and tasks. The CMTS descriptor represents a wide range of classical and modern problems, such as job shop scheduling, the traveling salesman problem, vehicle routing, and cooperative multi-object tracking. Problems using the CMTS representation are solvable by a suite of algorithms, with varying degrees of suitability. Solution generating methods range from simple random scheduling to state-of-the-art biologically inspired approaches. Techniques from classical task assignment solvers are extended to handle multiagent task problems where agents can also multitask. Additional ideas are incorporated from constraint satisfaction, project scheduling, evolutionary algorithms, dynamic coalition formation, auctioning, and behavior-based robotics to highlight how different solution generation strategies apply to the complex problem space
Engineering technology for networks
Space Network (SN) modeling and evaluation are presented. The following tasks are included: Network Modeling (developing measures and metrics for SN, modeling of the Network Control Center (NCC), using knowledge acquired from the NCC to model the SNC, and modeling the SN); and Space Network Resource scheduling
Recommended from our members
Reduction of Machine Tool Times Through a Software/Hardware Integrated Solution
Toolmaking is an industry that creates metal moulds, generally of durable tool steels, for
producing vacuum-formed and injection moulded plastic parts, which are used in thousands
of everyday items such as mobile phones. At present toolmaking is labour intensive with each
machining operation requiring manual supervision. The FASTOOL project was a European
Union funded collaboration that was aimed at reducing the manpower content of mould
toolmaking, and extending the working day. This paper focuses on one element which utilised
specially created scheduling and control software that operated an automated overhead gantry
system and could remotely start the workshop machines. The software was completely object
oriented which allows future proofing by creating new objects for new machines. The results
demonstrate that this manufacturing process can be automated, leading to better working
conditions for employees and an increase in efficiency and profitability.Mechanical Engineerin
Performance analysis of parallel branch and bound search with the hypercube architecture
With the availability of commercial parallel computers, researchers are examining new classes of problems which might benefit from parallel computing. This paper presents results of an investigation of the class of search intensive problems. The specific problem discussed is the Least-Cost Branch and Bound search method of deadline job scheduling. The object-oriented design methodology was used to map the problem into a parallel solution. While the initial design was good for a prototype, the best performance resulted from fine-tuning the algorithm for a specific computer. The experiments analyze the computation time, the speed up over a VAX 11/785, and the load balance of the problem when using loosely coupled multiprocessor system based on the hypercube architecture
Human-Machine Collaborative Optimization via Apprenticeship Scheduling
Coordinating agents to complete a set of tasks with intercoupled temporal and
resource constraints is computationally challenging, yet human domain experts
can solve these difficult scheduling problems using paradigms learned through
years of apprenticeship. A process for manually codifying this domain knowledge
within a computational framework is necessary to scale beyond the
``single-expert, single-trainee" apprenticeship model. However, human domain
experts often have difficulty describing their decision-making processes,
causing the codification of this knowledge to become laborious. We propose a
new approach for capturing domain-expert heuristics through a pairwise ranking
formulation. Our approach is model-free and does not require enumerating or
iterating through a large state space. We empirically demonstrate that this
approach accurately learns multifaceted heuristics on a synthetic data set
incorporating job-shop scheduling and vehicle routing problems, as well as on
two real-world data sets consisting of demonstrations of experts solving a
weapon-to-target assignment problem and a hospital resource allocation problem.
We also demonstrate that policies learned from human scheduling demonstration
via apprenticeship learning can substantially improve the efficiency of a
branch-and-bound search for an optimal schedule. We employ this human-machine
collaborative optimization technique on a variant of the weapon-to-target
assignment problem. We demonstrate that this technique generates solutions
substantially superior to those produced by human domain experts at a rate up
to 9.5 times faster than an optimization approach and can be applied to
optimally solve problems twice as complex as those solved by a human
demonstrator.Comment: Portions of this paper were published in the Proceedings of the
International Joint Conference on Artificial Intelligence (IJCAI) in 2016 and
in the Proceedings of Robotics: Science and Systems (RSS) in 2016. The paper
consists of 50 pages with 11 figures and 4 table
A parallel implementation of a multisensor feature-based range-estimation method
There are many proposed vision based methods to perform obstacle detection and avoidance for autonomous or semi-autonomous vehicles. All methods, however, will require very high processing rates to achieve real time performance. A system capable of supporting autonomous helicopter navigation will need to extract obstacle information from imagery at rates varying from ten frames per second to thirty or more frames per second depending on the vehicle speed. Such a system will need to sustain billions of operations per second. To reach such high processing rates using current technology, a parallel implementation of the obstacle detection/ranging method is required. This paper describes an efficient and flexible parallel implementation of a multisensor feature-based range-estimation algorithm, targeted for helicopter flight, realized on both a distributed-memory and shared-memory parallel computer
ReSHAPE: A Framework for Dynamic Resizing and Scheduling of Homogeneous Applications in a Parallel Environment
Applications in science and engineering often require huge computational
resources for solving problems within a reasonable time frame. Parallel
supercomputers provide the computational infrastructure for solving such
problems. A traditional application scheduler running on a parallel cluster
only supports static scheduling where the number of processors allocated to an
application remains fixed throughout the lifetime of execution of the job. Due
to the unpredictability in job arrival times and varying resource requirements,
static scheduling can result in idle system resources thereby decreasing the
overall system throughput. In this paper we present a prototype framework
called ReSHAPE, which supports dynamic resizing of parallel MPI applications
executed on distributed memory platforms. The framework includes a scheduler
that supports resizing of applications, an API to enable applications to
interact with the scheduler, and a library that makes resizing viable.
Applications executed using the ReSHAPE scheduler framework can expand to take
advantage of additional free processors or can shrink to accommodate a high
priority application, without getting suspended. In our research, we have
mainly focused on structured applications that have two-dimensional data arrays
distributed across a two-dimensional processor grid. The resize library
includes algorithms for processor selection and processor mapping. Experimental
results show that the ReSHAPE framework can improve individual job turn-around
time and overall system throughput.Comment: 15 pages, 10 figures, 5 tables Submitted to International Conference
on Parallel Processing (ICPP'07
- …