    Resource dedication problem in a multi-project environment

    Get PDF
    Resource dedication problem (RDP) in a multi-project environment is defined as the optimal dedication of resource capacities to dierent projects within the overall limits of the resources with the objective of minimizing the sum of the weighted tardinesses of all projects. The projects involved are in general multi-mode resource constrained project scheduling problems (MRCPSP) with nish to start zero time lag and nonpreemtive activities. In general, approaches to multi-project scheduling consider the resources as a pool shared by all projects. When projects are distributed geographically or sharing resources between projects is too costly, then the resource sharing policy may not be appropriate and hence the resources are dedicated to individual projects throughout project durations. To the best of our knowledge, this point of view for resources is not considered in multi-project literature. In the following, we propose a solution methodology for RDP with a new local improvement heuristic by determining the resource dedications to individual projects and solving scheduling problems with the given resource limits

    Resource dedication problem in a multi-project environment

    Get PDF
    There can be different approaches to the management of resources within the context of multi-project scheduling problems. In general, approaches to multiproject scheduling problems consider the resources as a pool shared by all projects. On the other hand, when projects are distributed geographically or sharing resources between projects is not preferred, then this resource sharing policy may not be feasible. In such cases, the resources must be dedicated to individual projects throughout the project durations. This multi-project problem environment is defined here as the resource dedication problem (RDP). RDP is defined as the optimal dedication of resource capacities to different projects within the overall limits of the resources and with the objective of minimizing a predetermined objective function. The projects involved are multi-mode resource constrained project scheduling problems with finish to start zero time lag and non-preemptive activities and limited renewable and nonrenewable resources. Here, the characterization of RDP, its mathematical formulation and two different solution methodologies are presented. The first solution approach is a genetic algorithm employing a new improvement move called combinatorial auction for RDP, which is based on preferences of projects for resources. Two different methods for calculating the projects’ preferences based on linear and Lagrangian relaxation are proposed. The second solution approach is a Lagrangian relaxation based heuristic employing subgradient optimization. Numerical studies demonstrate that the proposed approaches are powerful methods for solving this problem

    A Computer Modeling Approach Using Critical Resource Diagramming Network Analysis in Project Scheduling

    Get PDF
    The problem of resource constrained project scheduling (RCPSP) continues to be an important topic in project management. Different scheduling processes have been introduced to solve cases of RCPSP. Most of the developed methods are based on a network analysis approach. The two main technique of project network analysis used for planning, scheduling, and control are PERT and CPM. These approaches assume unlimited resource availability in project network analysis. In realistic projects, both the time and resource requirements of activities should be considered in developing network schedules. Another particularity of the methods created, so far, is the focus on activities during the scheduling process. Therefore, from a resource point of view, the current procedures do not allow the project manager to incorporate information concerning each resource unit under supervision in the scheduling process of a project. There is a need for simple tools for resource planning, scheduling, tracking, and control. Critical resource diagramming (CRD) is a relatively new resource management tool. CRD is a simple extension to the CPM technique developed for resource management purposes. Unlike activity networks, CRD uses nodes to represent each resource unit. Also, contrasting with activities, a resource unit may appear more than once in a CRD network, specifying all different tasks to which a particular unit is assigned. Similar to CPM, the same backward and forward computations may be performed to CRD. The CRD method can also be used in solving RCPSP problems. This present study explores that advantage of CRD. The purposes are to develop a methodology, based on CRD, which allows its use in specific case of RCPSP, to implement the developed technique using a computer model, to conduct test to validate the CRD computer model, and then to investigate the advantages and disadvantages of the introduced method. The CRD computer model will be implemented using the Visual Basic 6.0 language

    Performance evaluation of scheduling policies for the DRCMPSP

    Get PDF
    In this study, we consider the dynamic resource-constrained multi-project scheduling problem (DRCMPSP) where projects generate rewards at their completion, completions later than a due date cause tardiness costs and new projects arrive randomly during the ongoing project execution which disturbs the existing project scheduling plan. We model this problem as a discrete Markov decision process and explore the computational limitations of solving the problem by dynamic programming. We run and compare four different solution approaches on small size problems. These solution approaches are: a dynamic programming algorithm to determine a policy that maximises the average profit per unit time net of charges for late project completion, a genetic algorithm which generates a schedule to maximise the total reward of ongoing projects and updates the schedule with each new project arrival, a rule-based algorithm which prioritise processing of tasks with the highest processing durations, and a worst decision algorithm to seek a non-idling policy to minimise the average profit per unit time. Average profits per unit time of generated policies of the solution algorithms are evaluated and compared. The performance of the genetic algorithm is the closest to the optimal policies of the dynamic programming algorithm, but its results are notably suboptimal, up to 67.2\%. Alternative scheduling algorithms are close to optimal with low project arrival probability but quickly deteriorate their performance as the probability increases

    Multi-mode resource constrained multi-project scheduling and resource portfolio problem

    Get PDF
    This paper introduces a multi-project problem environment which involves multiple projects with assigned due dates; with activities that have alternative resource usage modes; a resource dedication policy that does not allow sharing of resources among projects throughout the planning horizon; and a total budget. There are three issues to face when investigating this multiproject environment. First, the total budget should be distributed among different resource types to determine the general resource capacities which correspond to the total amount for each renewable resource to be dedicated to the projects. With the general resource capacities at hand, the next issue is to determine the amounts of resources to be dedicated to the individual projects. With the dedication of resources accomplished, the scheduling of the projects' activities reduces to the multi-mode resource constrained project scheduling problem (MRCPSP) for each individual project. Finally the last issue is the effcient solution of the resulting MRCPSPs. In this paper, this multi-project environment is modeled in an integrated fashion and designated as the Resource Portfolio Problem. A two-phase and a monolithic genetic algorithm are proposed as two solution approaches each of which employs a new improvement move designated as the combinatorial auction for resource portfolio and the combinatorial auction for resource dedication. Computational study using test problems demonstrated the effectiveness of the solution approach proposed

    Multi-project scheduling with 2-stage decomposition

    Get PDF
    A non-preemptive, zero time lag multi-project scheduling problem with multiple modes and limited renewable and nonrenewable resources is considered. A 2-stage decomposition approach is adopted to formulate the problem as a hierarchy of 0-1 mathematical programming models. At stage one, each project is reduced to a macro-activity with macro-modes resulting in a single project network where the objective is the maximization of the net present value and the cash flows are positive. For setting the time horizon three different methods are developed and tested. A genetic algorithm approach is designed for this problem, which is also employed to generate a starting solution for the exact solution procedure. Using the starting times and the resource profiles obtained in stage one each project is scheduled at stage two for minimum makespan. The result of the first stage is subjected to a post-processing procedure to distribute the remaining resource capacities. Three new test problem sets are generated with 81, 84 and 27 problems each and three different configurations of solution procedures are tested

    Project scheduling under uncertainty using fuzzy modelling and solving techniques

    Get PDF
    In the real world, projects are subject to numerous uncertainties at different levels of planning. Fuzzy project scheduling is one of the approaches that deal with uncertainties in project scheduling problem. In this paper, we provide a new technique that keeps uncertainty at all steps of the modelling and solving procedure by considering a fuzzy modelling of the workload inspired from the fuzzy/possibilistic approach. Based on this modelling, two project scheduling techniques, Resource Constrained Scheduling and Resource Leveling, are considered and generalized to handle fuzzy parameters. We refer to these problems as the Fuzzy Resource Constrained Project Scheduling Problem (FRCPSP) and the Fuzzy Resource Leveling Problem (FRLP). A Greedy Algorithm and a Genetic Algorithm are provided to solve FRCPSP and FRLP respectively, and are applied to civil helicopter maintenance within the framework of a French industrial project called Helimaintenance

    A bi-objective genetic algorithm approach to risk mitigation in project scheduling

    Get PDF
    A problem of risk mitigation in project scheduling is formulated as a bi-objective optimization problem, where the expected makespan and the expected total cost are both to be minimized. The expected total cost is the sum of four cost components: overhead cost, activity execution cost, cost of reducing risks and penalty cost for tardiness. Risks for activities are predefined. For each risk at an activity, various levels are defined, which correspond to the results of different preventive measures. Only those risks with a probable impact on the duration of the related activity are considered here. Impacts of risks are not only accounted for through the expected makespan but are also translated into cost and thus have an impact on the expected total cost. An MIP model and a heuristic solution approach based on genetic algorithms (GAs) is proposed. The experiments conducted indicate that GAs provide a fast and effective solution approach to the problem. For smaller problems, the results obtained by the GA are very good. For larger problems, there is room for improvement

    Pre-emptive resource-constrained multimode project scheduling using genetic algorithm: a dynamic forward approach

    Get PDF
    Purpose: The issue resource over-allocating is a big concern for project engineers in the process of scheduling project activities. Resource over-allocating drawback is frequently seen after scheduling of a project in practice which causes a schedule to be useless. Modifying an over-allocated schedule is very complicated and needs a lot of efforts and time. In this paper, a new and fast tracking method is proposed to schedule large scale projects which can help project engineers to schedule the project rapidly and with more confidence. Design/methodology/approach: In this article, a forward approach for maximizing net present value (NPV) in multi-mode resource constrained project scheduling problem while assuming discounted positive cash flows (MRCPSP-DCF) is proposed. The progress payment method is used and all resources are considered as pre-emptible. The proposed approach maximizes NPV using unscheduled resources through resource calendar in forward mode. For this purpose, a Genetic Algorithm is applied to solve. Findings: The findings show that the proposed method is an effective way to maximize NPV in MRCPSP-DCF problems while activity splitting is allowed. The proposed algorithm is very fast and can schedule experimental cases with 1000 variables and 100 resources in few seconds. The results are then compared with branch and bound method and simulated annealing algorithm and it is found the proposed genetic algorithm can provide results with better quality. Then algorithm is then applied for scheduling a hospital in practice. Originality/value: The method can be used alone or as a macro in Microsoft Office Project® Software to schedule MRCPSP-DCF problems or to modify resource over-allocated activities after scheduling a project. This can help project engineers to schedule project activities rapidly with more accuracy in practice.Peer Reviewe