    Optimized shunting with mixed-usage tracks

    Get PDF
    We consider the planning of railway freight classification at hump yards, where the problem involves the formation of departing freight train blocks from arriving trains subject to scheduling and capacity constraints. The hump yard layout considered consists of arrival tracks of sufficient length at an arrival yard, a hump, classification tracks of non-uniform and possibly non-sufficient length at a classification yard, and departure tracks of sufficient length. To increase yard capacity, freight cars arriving early can be stored temporarily on specific mixed-usage tracks. The entire hump yard planning process is covered in this paper, and heuristics for arrival and departure track assignment, as well as hump scheduling, have been included to provide the neccessary input data. However, the central problem considered is the classification track allocation problem. This problem has previously been modeled using direct mixed integer programming models, but this approach did not yield lower bounds of sufficient quality to prove optimality. Later attempts focused on a column generation approach based on branch-and-price that could solve problem instances of industrial size. Building upon the column generation approach we introduce a direct arc-based integer programming model, where the arcs are precedence relations between blocks on the same classification track. Further, the most promising models are adapted for rolling-horizon planning. We evaluate the methods on historical data from the Hallsberg shunting yard in Sweden. The results show that the new arc-based model performs as well as the column generation approach. It returns an optimal schedule within the execution time limit for all instances but from one, and executes as fast as the column generation approach. Further, the short execution times of the column generation approach and the arc-indexed model make them suitable for rolling-horizon planning, while the direct mixed integer program proved to be too slow for this. Extended analysis of the results shows that mixing was only required if the maximum number of concurrent trains on the classification yard exceeds 29 (there are 32 available tracks), and that after this point the number of extra car roll-ins increases heavily

    Track Allocation in Freight-Train Classification with Mixed Tracks

    Get PDF
    We consider the process of forming outbound trains from cars of inbound trains at rail-freight hump yards. Given the arrival and departure times as well as the composition of the trains, we study the problem of allocating classification tracks to outbound trains such that every outbound train can be built on a separate classification track. We observe that the core problem can be formulated as a special list coloring problem in interval graphs, which is known to be NP-complete. We focus on an extension where individual cars of different trains can temporarily be stored on a special subset of the tracks. This problem induces several new variants of the list-coloring problem, in which the given intervals can be shortened by cutting off a prefix of the interval. We show that in case of uniform and sufficient track lengths, the corresponding coloring problem can be solved in polynomial time, if the goal is to minimize the total cost associated with cutting off prefixes of the intervals. Based on these results, we devise two heuristics as well as an integer program to tackle the problem. As a case study, we consider a real-world problem instance from the Hallsberg RangerbangÄrd hump yard in Sweden. Planning over horizons of seven days, we obtain feasible solutions from the integer program in all scenarios, and from the heuristics in most scenarios

    Optimisation of simultaneous train formation and car sorting at marshalling yards

    Get PDF
    Efficient and correct freight train marshalling is vital for high quality carload freight transportations. During marshalling, it is desirable that cars are sorted according to their individual drop-off locations in the outbound freight trains. Furthermore, practical limitations such as non-uniform and limited track lengths and the arrival and departure times of trains need to be considered. This paper presents a novel optimisation method for freight marshalling scheduling under these circumstances. The method is based on an integer programming formulation that is solved using column generation and branch and price. The approach minimises the number of extra shunting operations that have to be performed, and is evaluated on real-world data from the Hallsberg marshalling yard in Sweden

    Hump Yard Track Allocation with Temporary Car Storage

    Get PDF
    In rail freight operation, freight cars need to be separated and reformed into new trains at hump yards. The classification procedure is complex and hump yards constitute bottlenecks in the rail freight network, often causing outbound trains to be delayed. One of the problems is that planning for the allocation of tracks at hump yards is difficult, given that the planner has limited resources (tracks, shunting engines, etc.) and needs to foresee the future capacity requirements when planning for the current inbound trains. In this paper, we consider the problem of allocating classification tracks in a rail freight hump yard for arriving and departing trains with predetermined arrival and departure times. The core problem can be formulated as a special list coloring problem. We focus on an extension where individual cars can temporarily be stored on a special subset of the tracks. An extension where individual cars can temporarily be stored on a special subset of the tracks is also considered. We model the problem using mixed integer programming, and also propose several heuristics that can quickly give feasible track allocations. As a case study, we consider a real-world problem instance from the Hallsberg RangerbangÄrd hump yard in Sweden. Planning over horizons over two to four days, we obtain feasible solutions from both the exact and heuristic approaches that allow all outgoing trains to leave on time

    Single-machine scheduling with stepwise tardiness costs and release times

    Get PDF
    We study a scheduling problem that belongs to the yard operations component of the railroad planning problems, namely the hump sequencing problem. The scheduling problem is characterized as a single-machine problem with stepwise tardiness cost objectives. This is a new scheduling criterion which is also relevant in the context of traditional machine scheduling problems. We produce complexity results that characterize some cases of the problem as pseudo-polynomially solvable. For the difficult-to-solve cases of the problem, we develop mathematical programming formulations, and propose heuristic algorithms. We test the formulations and heuristic algorithms on randomly generated single-machine scheduling problems and real-life datasets for the hump sequencing problem. Our experiments show promising results for both sets of problems

    Shunting passenger trains: getting ready for departure

    Get PDF
    In this paper we consider the problem of shunting train units on a railway station. Train units arrive at and depart from the station according to a given train schedule and in between the units may have to be stored at the station. The assignment of arriving to departing train units (called matching) and the scheduling of the movements to realize this matching is called shunting. The goal is to realize the shunting using a minimal number of shunt movements.\ud For a restricted version of this problem an ILP approach has been presented in the literature. In this paper, we consider the general shunting problem and derive a greedy heuristic approach and an exact solution method based on dynamic programming. Both methods are flexible in the sense that they allow the incorporation of practical planning rules and may be extended to cover additional requirements from practice

    Track Allocation in Freight-Train Classification with Mixed Tracks

    Get PDF
    We consider the process of forming outbound trains from cars of inbound trains at rail-freight hump yards. Given the arrival and departure times as well as the composition of the trains, we study the problem of allocating classification tracks to outbound trains such that every outbound train can be built on a separate classification track. We observe that the core problem can be formulated as a special list coloring problem in interval graphs, which is known to be NP-complete. We focus on an extension where individual cars of different trains can temporarily be stored on a special subset of the tracks. This problem induces several new variants of the list-coloring problem, in which the given intervals can be shortened by cutting off a prefix of the interval. We show that in case of uniform and sufficient track lengths, the corresponding coloring problem can be solved in polynomial time, if the goal is to minimize the total cost associated with cutting off prefixes of the intervals. Based on these results, we devise two heuristics as well as an integer program to tackle the problem. As a case study, we consider a real-world problem instance from the Hallsberg Rangerbangard hump yard in Sweden. Planning over horizons of seven days, we obtain feasible solutions from the integer program in all scenarios, and from the heuristics in most scenarios

    Online Train Shunting

    Get PDF
    At the occasion of ATMOS 2012, Tim Nonner and Alexander Souza defined a new train shunting problem that can roughly be described as follows. We are given a train visiting stations in a given order and cars located at some source stations. Each car has a target station. During the trip of the train, the cars are added to the train at their source stations and removed from it at their target stations. An addition or a removal of a car in the strict interior of the train incurs a cost higher than when the operation is performed at the end of the train. The problem consists in minimizing the total cost, and thus, at each source station of a car, the position the car takes in the train must be carefully decided. Among other results, Nonner and Souza showed that this problem is polynomially solvable by reducing the problem to the computation of a minimum independent set in a bipartite graph. They worked in the offline setting, i.e. the sources and the targets of all cars are known before the trip of the train starts. We study the online version of the problem, in which cars become known at their source stations. We derive a 2-competitive algorithm and prove than no better ratios are achievable. Other related questions are also addressed

    OPTIMIZATION MODELS AND METHODOLOGIES TO SUPPORT EMERGENCY PREPAREDNESS AND POST-DISASTER RESPONSE

    Get PDF
    This dissertation addresses three important optimization problems arising during the phases of pre-disaster emergency preparedness and post-disaster response in time-dependent, stochastic and dynamic environments. The first problem studied is the building evacuation problem with shared information (BEPSI), which seeks a set of evacuation routes and the assignment of evacuees to these routes with the minimum total evacuation time. The BEPSI incorporates the constraints of shared information in providing on-line instructions to evacuees and ensures that evacuees departing from an intermediate or source location at a mutual point in time receive common instructions. A mixed-integer linear program is formulated for the BEPSI and an exact technique based on Benders decomposition is proposed for its solution. Numerical experiments conducted on a mid-sized real-world example demonstrate the effectiveness of the proposed algorithm. The second problem addressed is the network resilience problem (NRP), involving an indicator of network resilience proposed to quantify the ability of a network to recover from randomly arising disruptions resulting from a disaster event. A stochastic, mixed integer program is proposed for quantifying network resilience and identifying the optimal post-event course of action to take. A solution technique based on concepts of Benders decomposition, column generation and Monte Carlo simulation is proposed. Experiments were conducted to illustrate the resilience concept and procedure for its measurement, and to assess the role of network topology in its magnitude. The last problem addressed is the urban search and rescue team deployment problem (USAR-TDP). The USAR-TDP seeks an optimal deployment of USAR teams to disaster sites, including the order of site visits, with the ultimate goal of maximizing the expected number of saved lives over the search and rescue period. A multistage stochastic program is proposed to capture problem uncertainty and dynamics. The solution technique involves the solution of a sequence of interrelated two-stage stochastic programs with recourse. A column generation-based technique is proposed for the solution of each problem instance arising as the start of each decision epoch over a time horizon. Numerical experiments conducted on an example of the 2010 Haiti earthquake are presented to illustrate the effectiveness of the proposed approach
    • 