1,849 research outputs found
Flexible flow shop scheduling with stochastic processing times: A decomposition-based approach
Flexible flow shop scheduling problems are NP-hard and tend to become more complex when stochastic uncertainties are taken into consideration. Although some methods have been developed to address such problems, they remain inherently difficult to solve by any single approach. This paper presents a novel decomposition-based approach (DBA), which combines both the shortest processing time (SPT) and the genetic algorithm (GA), to minimizing the makespan of a flexible flow shop (FFS) with stochastic processing times. In the proposed DBA, a neighbouring K-means clustering algorithm is developed to firstly group the machines of an FFS into an appropriate number of machine clusters, based on their stochastic nature. Two optimal back propagation networks (BPN), corresponding to the scenarios of simultaneous and non-simultaneous job arrivals, are then selectively adopted to assign either SPT or GA to each machine cluster for sub-schedule generation. Finally, an overall schedule is generated by integrating the sub-schedules of machine clusters. Computation results show that the DBA outperforms SPT and GA alone for FFS scheduling with stochastic processing times. © 2012 Elsevier Ltd. All rights reserved.postprin
Toward Robust Manufacturing Scheduling: Stochastic Job-Shop Scheduling
Manufacturing plays a significant role in promoting economic development,
production, exports, and job creation, which ultimately contribute to improving
the quality of life. The presence of manufacturing defects is, however,
inevitable leading to products being discarded, i.e. scrapped. In some cases,
defective products can be repaired through rework. Scrap and rework cause a
longer completion time, which can contribute to the order being shipped late.
In addition, complex manufacturing scheduling becomes much more challenging
when the above uncertainties are present. Motivated by the presence of
uncertainties as well as combinatorial complexity, this paper addresses the
challenge illustrated through a case study of stochastic job-shop scheduling
problems arising within low-volume high-variety manufacturing. To ensure
on-time delivery, high-quality solutions are required, and near-optimal
solutions must be obtained within strict time constraints to ensure smooth
operations on the job-shop floor. To efficiently solve the stochastic job-shop
scheduling (JSS) problem, a recently-developed Surrogate "Level-Based"
Lagrangian Relaxation is used to reduce computational effort while efficiently
exploiting the geometric convergence potential inherent to Polyak's step-sizing
formula thereby leading to fast convergence. Numerical testing demonstrates
that the new method is more than two orders of magnitude faster as compared to
commercial solvers
Coordination of Supply Webs Based on Dispositive Protocols
A lot of curricula in information systems, also at master level, exists today. However, the strong need in new approaches and new curricula still exists, especially, in European area. The paper discusses the modern curriculum in information systems at master level that is currently under development in the Socrates/Erasmus project MOCURIS. The curriculum is oriented to the students of engineering schools of technical universities. The proposed approach takes into account integration trends in European area as well as the transformation of industrial economics into knowledge-based digital economics The paper presents main characteristics of the proposed curriculum, discuses curriculum development techniques used in the project MOCURIS, describes the architecture of the proposed curriculum and the body of knowledge provided by it
Human-Machine Collaborative Optimization via Apprenticeship Scheduling
Coordinating agents to complete a set of tasks with intercoupled temporal and
resource constraints is computationally challenging, yet human domain experts
can solve these difficult scheduling problems using paradigms learned through
years of apprenticeship. A process for manually codifying this domain knowledge
within a computational framework is necessary to scale beyond the
``single-expert, single-trainee" apprenticeship model. However, human domain
experts often have difficulty describing their decision-making processes,
causing the codification of this knowledge to become laborious. We propose a
new approach for capturing domain-expert heuristics through a pairwise ranking
formulation. Our approach is model-free and does not require enumerating or
iterating through a large state space. We empirically demonstrate that this
approach accurately learns multifaceted heuristics on a synthetic data set
incorporating job-shop scheduling and vehicle routing problems, as well as on
two real-world data sets consisting of demonstrations of experts solving a
weapon-to-target assignment problem and a hospital resource allocation problem.
We also demonstrate that policies learned from human scheduling demonstration
via apprenticeship learning can substantially improve the efficiency of a
branch-and-bound search for an optimal schedule. We employ this human-machine
collaborative optimization technique on a variant of the weapon-to-target
assignment problem. We demonstrate that this technique generates solutions
substantially superior to those produced by human domain experts at a rate up
to 9.5 times faster than an optimization approach and can be applied to
optimally solve problems twice as complex as those solved by a human
demonstrator.Comment: Portions of this paper were published in the Proceedings of the
International Joint Conference on Artificial Intelligence (IJCAI) in 2016 and
in the Proceedings of Robotics: Science and Systems (RSS) in 2016. The paper
consists of 50 pages with 11 figures and 4 table
An agent-based genetic algorithm for hybrid flowshops with sequence dependent setup times to minimise makespan
This paper deals with a variant of flowshop scheduling, namely, the hybrid or flexible flowshop with sequence dependent setup times. This type of flowshop is frequently used in the batch production industry and helps reduce the gap between research and operational use. This scheduling problem is NP-hard and solutions for large problems are based on non-exact methods. An improved genetic algorithm (GA) based on software agent design to minimise the makespan is presented. The paper proposes using an inherent characteristic of software agents to create a new perspective in GA design. To verify the developed metaheuristic, computational experiments are conducted on a well-known benchmark problem dataset. The experimental results show that the proposed metaheuristic outperforms some of the well-known methods and the state-of-art algorithms on the same benchmark problem dataset.The translation of this paper was funded by Universidad Politecnica de Valencia, Spain.Gómez Gasquet, P.; Andrés Romano, C.; Lario Esteban, FC. (2012). An agent-based genetic algorithm for hybrid flowshops with sequence dependent setup times to minimise makespan. Expert Systems with Applications. 39(9):8095-8107. https://doi.org/10.1016/j.eswa.2012.01.158S8095810739
Mathematical models for planning support
In this paper we describe how computer systems can provide planners with active planning support, when these planners are carrying out their daily planning activities. This means that computer systems actively participate in the planning process by automatically generating plans or partial plans. Active planning support by computer systems requires the application of mathematical models and solution techniques. In this paper we describe the modeling process in general terms, as well as several modeling and solution techniques. We also present some background information on computational complexity theory, since most practical planning problems are hard to solve. We also describe how several objective functions can be handled, since it is rare that solutions can be evaluated by just one single objective. Furthermore, we give an introduction into the use of mathematical modeling systems, which are useful tools in a modeling context, especially during the development phases of a mathematical model. We finish the paper with a real life example related to the planning process of the rolling stock circulation of a railway operator.optimization;mathematical models;modeling process;planning support;Planning
Learning Models for Discrete Optimization
We consider a class of optimization approaches that incorporate machine learning models into the algorithm structure. Our focus is on the algorithms that can learn the patterns in the search space in order to boost computational performance. The idea is to design optimization techniques that allow for computationally efficient tuning a priori. The final objective of this work is to provide efficient solvers that can be tuned for optimal performance in serial and parallel environments.This dissertation provides a novel machine learning model based on logistic regression and describes an implementation for scheduling problems. We incorporate the proposed learning model into a well-known optimization algorithm, tabu search, and demonstrate the potential of the underlying ideas. The dissertation also establishes a new framework for comparing optimization algorithms. This framework provides a comparison of algorithms that is statistically meaningful and intuitive. Using this framework, we demonstrate that the inclusion of the logistic regression model into the tabu search method provides significant boost of its performance. Finally, we study the parallel implementation of the algorithm and evaluate the algorithm performance when more connections between threads exist
Working Notes from the 1992 AAAI Spring Symposium on Practical Approaches to Scheduling and Planning
The symposium presented issues involved in the development of scheduling systems that can deal with resource and time limitations. To qualify, a system must be implemented and tested to some degree on non-trivial problems (ideally, on real-world problems). However, a system need not be fully deployed to qualify. Systems that schedule actions in terms of metric time constraints typically represent and reason about an external numeric clock or calendar and can be contrasted with those systems that represent time purely symbolically. The following topics are discussed: integrating planning and scheduling; integrating symbolic goals and numerical utilities; managing uncertainty; incremental rescheduling; managing limited computation time; anytime scheduling and planning algorithms, systems; dependency analysis and schedule reuse; management of schedule and plan execution; and incorporation of discrete event techniques
- …