5,629 research outputs found

    State of the art in simulation-based optimisation for maintenance systems

    Get PDF
    Recently, more attention has been directed towards improving and optimising maintenance in manufacturing systems using simulation. This paper aims to report the state of the art in simulation-based optimisation of maintenance by systematically classifying the published literature and outlining main trends in modelling and optimising maintenance systems. The authors investigate application areas and published real case studies as well as researched maintenance strategies and policies. Much of the research in this area is focusing on preventive maintenance and optimising preventive maintenance frequency that will lead to the minimum cost. Discrete event simulation was the most reported technique to model maintenance systems whereas modern optimisation methods such as Genetic Algorithms was the most reported optimisation method in the literature. On this basis, the paper identifies the current gaps and discusses future prospects. Further research can be done to develop a framework that guides the experimenting process with different maintenance strategies and policies. More real case studies can be conducted on multi-objective optimisation and condition based maintenance especially in a production context

    Optimal Maintenance Scheduling for Multi-Component E-Manufacturing System

    Get PDF
    During the recent years, development of information technology caused to develop a new industrial system which is called e-Manufacturing system. Thanks to the webenabled manufacturing technologies, the lead times are being minimized to their extreme level, and the minimum amount of inventory is kept, though the products are being made-to order. Under these circumstances, achieving near-zero downtime of the plant floor’s equipments is a crucial factor which mitigates the risk of facing unmet demands. Many researches carried out to schedule maintenance actions in short term, but none of them have utilized all of planning horizon to spread maintenance actions along available time. In this research a method of enhanced maintenance scheduling of multi-component e-Manufacturing systems has been developed. In this multi-component system, importance of all machines is considered and the benefit of the entire system in term of produced parts is taken into account (versus benefits of single machine). In proposed system, the predicted machines degradation information, online information about work in process (WIP) inventory (at inventory buffer of each work station) as well as production line’s dynamism are taken into account. All of makespans of planning horizon have been utilized to improve scheduling efficiency and operational productivity by maximizing the system throughputs. A state-of-the-art method which is called simulation optimization has been utilized to implement the proposed scheduling method. The production system is simulated by ProModel software. It plays the role of objective function of the maintenance scheduling optimization problem. Using a production related heuristic method which is called system value method, the value of each workstation is determined. These values are used to define the objective function’s parameters. Then, using genetic algorithm-based software which is called SimRunner and has been embedded by ProModel, the scheduling optimization procedure is run to find optimum maintenance schedule. This process is carried out for nine generated scenarios. At the end, the results are benchmarked by two commonly used maintenance scheduling methods to magnify the importance of proposed intelligent maintenance scheduling in the multi-component e-Manufacturing systems. The results demonstrate that the proposed optimal maintenance scheduling method yields much better system value rather than sequencing methods. Furthermore, it indicates that when the mean time to repairs are longer, this method is more efficient. The results in the simulated testbed indicate that the developed scheduling method using simulation optimization functions properly and can be applied in other cases

    Preventive maintenance and replacement scheduling : models and algorithms.

    Get PDF
    Preventive maintenance is a broad term that encompasses a set of activities aimed at improving the overall reliability and availability of a system. Preventive maintenance involves a basic trade-off between the costs of conducting maintenance/replacement activities and the cost savings achieved by reducing the overall rate of occurrence of system failures. Designers of preventive maintenance schedules must weigh these individual costs in an attempt to minimize the overall cost of system operation. They may also be interested in maximizing the system reliability, subject to some sort of budget constraint. In this dissertation, we present a complete discussion about the problem definition and review the literature. We develop new nonlinear mixed-integer optimization models, solve them by standard nonlinear optimization algorithms, and analyze their computational results. In addition, we extend the optimization models by considering engineering economy features and reformulate them as a multi-objective optimization model. We optimize this model by generational and steady state genetic algorithms as well as by a simulated annealing algorithm and demonstrate the computational results obtained by implementation of these algorithms. We perform a sensitivity analysis on the parameters of the optimization models and present a comparison between exact and metaheuristic algorithms in terms of computational efficiency and accuracy. Finally, we present a new mathematical function to model age reduction and improvement factor parameter used in optimization models. In addition, we develop a practical procedure to estimate the effect of maintenance activity on failure rate and effective age of multi component systems

    Prognostics-Based Two-Operator Competition for Maintenance and Service Part Logistics

    Get PDF
    Prognostics and timely maintenance of components are critical to the continuing operation of a system. By implementing prognostics, it is possible for the operator to maintain the system in the right place at the right time. However, the complexity in the real world makes near-zero downtime difficult to achieve partly because of a possible shortage of required service parts. This is realistic and quite important in maintenance practice. To coordinate with a prognostics-based maintenance schedule, the operator must decide when to order service parts and how to compete with other operators who also need the same parts. This research addresses a joint decision-making approach that assists two operators in making proactive maintenance decisions and strategically competing for a service part that both operators rely on for their individual operations. To this end, a maintenance policy involving competition in service part procurement is developed based on the Stackelberg game-theoretic model. Variations of the policy are formulated for three different scenarios and solved via either backward induction or genetic algorithm methods. Unlike the first two scenarios, the possibility for either of the operators being the leader in such competitions is considered in the third scenario. A numerical study on wind turbine operation is provided to demonstrate the use of the joint decision-making approach in maintenance and service part logistics

    Simulation-based optimisation of complex maintenance systems

    Get PDF
    There is a potential as well as a growing interest amongst researchers to utilise simulation in optimising maintenance systems. The state of the art in simulation-based optimisation of maintenance was established by systematically classifying the published literature and outlining main trends in modelling and optimising maintenance systems. In general, approaches to optimise maintenance varied significantly in the literature. Overall, these studies highlight the need for a framework that unifies the approach to optimising maintenance systems. Framework requirements were established through two main sources of published research. Surveys on maintenance simulation optimisation were examined to document comments on the approaches authors follow while optimising maintenance systems. In addition, advanced and future maintenance strategies were documented to ensure it can be accommodated in the proposed framework. The proposed framework was developed using a standard flowchart tool due to its familiarity and ability to depict decision structures clearly. It provides a systematic methodology that details the steps required to connect the simulation model to an optimisation engine. Not only it provides guidance in terms of formulating the optimal problem for the maintenance system at hand but it also provides support and assistance in defining the optimisation scope and investigating applicable maintenance strategies. Additionally, it considers current issues relating to maintenance systems both in research and in practice such as uncertainty, complexity and multi-objective optimisation. The proposed framework cannot be applied using existing approaches for modelling maintenance. Existing modelling approaches using simulation have a number of limitations: The maintenance system is modelled separately from other inter-related systems such as production and spare parts logistics. In addition, these approaches are used to model one maintenance strategy only. A novel approach for modelling maintenance using Discrete Event Simulation is proposed. The proposed approach enables the modelling of interactions amongst various maintenance strategies and their effects on the assets in non-identical multi-unit systems. Using the proposed framework and modelling approach, simulation-based optimisation was conducted on an academic case and two industrial cases that are varied in terms of sector, size, number of manufacturing processes and level of maintenance documentation. Following the structured framework enabled discussing and selecting the suitable optimisation scope and applicable maintenance strategies as well as formulating a customised optimal problem for each case. The results of the study suggest that over-looking the optimisation of maintenance strategies may lead to sub-optimal solutions. In addition, this research provides insights for non-conflicting objectives in maintenance systems

    Intelligent maintenance management in a reconfigurable manufacturing environment using multi-agent systems

    Get PDF
    Thesis (M. Tech.) -- Central University of Technology, Free State, 2010Traditional corrective maintenance is both costly and ineffective. In some situations it is more cost effective to replace a device than to maintain it; however it is far more likely that the cost of the device far outweighs the cost of performing routine maintenance. These device related costs coupled with the profit loss due to reduced production levels, makes this reactive maintenance approach unacceptably inefficient in many situations. Blind predictive maintenance without considering the actual physical state of the hardware is an improvement, but is still far from ideal. Simply maintaining devices on a schedule without taking into account the operational hours and workload can be a costly mistake. The inefficiencies associated with these approaches have contributed to the development of proactive maintenance strategies. These approaches take the device health state into account. For this reason, proactive maintenance strategies are inherently more efficient compared to the aforementioned traditional approaches. Predicting the health degradation of devices allows for easier anticipation of the required maintenance resources and costs. Maintenance can also be scheduled to accommodate production needs. This work represents the design and simulation of an intelligent maintenance management system that incorporates device health prognosis with maintenance schedule generation. The simulation scenario provided prognostic data to be used to schedule devices for maintenance. A production rule engine was provided with a feasible starting schedule. This schedule was then improved and the process was determined by adhering to a set of criteria. Benchmarks were conducted to show the benefit of optimising the starting schedule and the results were presented as proof. Improving on existing maintenance approaches will result in several benefits for an organisation. Eliminating the need to address unexpected failures or perform maintenance prematurely will ensure that the relevant resources are available when they are required. This will in turn reduce the expenditure related to wasted maintenance resources without compromising the health of devices or systems in the organisation

    Integration of production, maintenance and quality : Modelling and solution approaches

    Get PDF
    Dans cette thèse, nous analysons le problème de l'intégration de la planification de production et de la maintenance préventive, ainsi que l'élaboration du système de contrôle de la qualité. Premièrement, on considère un système de production composé d'une machine et de plusieurs produits dans un contexte incertain, dont les prix et le coût changent d'une période à l'autre. La machine se détériore avec le temps et sa probabilité de défaillance, ainsi que le risque de passage à un état hors contrôle augmentent. Le taux de défaillance dans un état dégradé est plus élevé et donc, des coûts liés à la qualité s’imposent. Lorsque la machine tombe en panne, une maintenance corrective ou une réparation minimale seront initiées pour la remettre en marche sans influer ses conditions ou le processus de détérioration. L'augmentation du nombre de défaillances de la machine se traduit par un temps d'arrêt supérieur et un taux de disponibilité inférieur. D'autre part, la réalisation des plans de production est fortement influencée par la disponibilité et la fiabilité de la machine. Les interactions entre la planification de la maintenance et celle de la production sont incorporées dans notre modèle mathématique. Dans la première étape, l'effet de maintenance sur la qualité est pris en compte. La maintenance préventive est considérée comme imparfaite. La condition de la machine est définie par l’âge actuel, et la machine dispose de plusieurs niveaux de maintenance avec des caractéristiques différentes (coûts, délais d'exécution et impacts sur les conditions du système). La détermination des niveaux de maintenance préventive optimaux conduit à un problème d’optimisation difficile. Un modèle de maximisation du profit est développé, dans lequel la vente des produits conformes et non conformes, les coûts de la production, les stocks tenus, la rupture de stock, la configuration de la machine, la maintenance préventive et corrective, le remplacement de la machine et le coût de la qualité sont considérés dans la fonction de l’objectif. De plus, un système composé de plusieurs machines est étudié. Dans cette extension, les nombres optimaux d’inspections est également considéré. La fonction de l’objectif consiste à minimiser le coût total qui est la somme des coûts liés à la maintenance, la production et la qualité. Ensuite, en tenant compte de la complexité des modèles préposés, nous développons des méthodes de résolution efficaces qui sont fondées sur la combinaison d'algorithmes génétiques avec des méthodes de recherches locales. On présente un algorithme mimétique qui emploi l’algorithme Nelder-Mead, avec un logiciel d'optimisation pour déterminer les valeurs exactes de plusieurs variables de décisions à chaque évaluation. La méthode de résolution proposée est comparée, en termes de temps d’exécution et de qualités des solutions, avec plusieurs méthodes Métaheuristiques. Mots-clés : Planification de la production, Maintenance préventive imparfaite, Inspection, Qualité, Modèles intégrés, MétaheuristiquesIn this thesis, we study the integrated planning of production, maintenance, and quality in multi-product, multi-period imperfect systems. First, we consider a production system composed of one machine and several products in a time-varying context. The machine deteriorates with time and so, the probability of machine failure, or the risk of a shift to an out-of-control state, increases. The defective rate in the shifted state is higher and so, quality related costs will be imposed. When the machine fails, a corrective maintenance or a minimal repair will be initiated to bring the machine in operation without influencing on its conditions or on the deterioration process. Increasing the expected number of machine failures results in a higher downtime and a lower availability rate. On the other hand, realization of the production plans is significantly influenced by the machine availability and reliability. The interactions between maintenance scheduling and production planning are incorporated in the mathematical model. In the first step, the impact of maintenance on the expected quality level is addressed. The maintenance is also imperfect and the machine conditions after maintenance can be anywhere between as-good-as-new and as-bad-as-old situations. Machine conditions are stated by its effective age, and the machine has several maintenance levels with different costs, execution times, and impacts on the system conditions. High level maintenances on the one hand have greater influences on the improvement of the system state and on the other hand, they occupy more the available production time. The optimal determination of such preventive maintenance levels to be performed at each maintenance intrusion is a challenging problem. A profit maximization model is developed, where the sale of conforming and non-conforming products, costs of production, inventory holding, backorder, setup, preventive and corrective maintenance, machine replacement, and the quality cost are addressed in the objective function. Then, a system with multiple machines is taken into account. In this extension, the number of quality inspections is involved in the joint model. The objective function minimizes the total cost which is the sum of maintenance, production and quality costs. In order to reduce the gap between the theory and the application of joint models, and taking into account the complexity of the integrated problems, we have developed an efficient solution method that is based on the combination of genetic algorithms with local search and problem specific methods. The proposed memetic algorithm employs Nelder-Mead algorithm along with an optimization package for exact determination of the values of several decision variables in each chromosome evolution. The method extracts not only the positive knowledge in good solutions, but also the negative knowledge in poor individuals to determine the algorithm transitions. The method is compared in terms of the solution time and quality to several heuristic methods. Keywords : Multi-period production planning, Imperfect preventive maintenance, Inspection, Quality, Integrated model, Metaheuristic
    corecore