3,805 research outputs found

    TRAVISIONS 2022

    Get PDF

    Towards the Internet of Smart Trains: A Review on Industrial IoT-Connected Railways

    Get PDF
    [Abstract] Nowadays, the railway industry is in a position where it is able to exploit the opportunities created by the IIoT (Industrial Internet of Things) and enabling communication technologies under the paradigm of Internet of Trains. This review details the evolution of communication technologies since the deployment of GSM-R, describing the main alternatives and how railway requirements, specifications and recommendations have evolved over time. The advantages of the latest generation of broadband communication systems (e.g., LTE, 5G, IEEE 802.11ad) and the emergence of Wireless Sensor Networks (WSNs) for the railway environment are also explained together with the strategic roadmap to ensure a smooth migration from GSM-R. Furthermore, this survey focuses on providing a holistic approach, identifying scenarios and architectures where railways could leverage better commercial IIoT capabilities. After reviewing the main industrial developments, short and medium-term IIoT-enabled services for smart railways are evaluated. Then, it is analyzed the latest research on predictive maintenance, smart infrastructure, advanced monitoring of assets, video surveillance systems, railway operations, Passenger and Freight Information Systems (PIS/FIS), train control systems, safety assurance, signaling systems, cyber security and energy efficiency. Overall, it can be stated that the aim of this article is to provide a detailed examination of the state-of-the-art of different technologies and services that will revolutionize the railway industry and will allow for confronting today challenges.Galicia. Consellería de Cultura, Educación e Ordenación Universitaria; ED431C 2016-045Galicia. Consellería de Cultura, Educación e Ordenación Universitaria; ED341D R2016/012Galicia. Consellería de Cultura, Educación e Ordenación Universitaria; ED431G/01Agencia Estatal de Investigación (España); TEC2013-47141-C4-1-RAgencia Estatal de Investigación (España); TEC2015-69648-REDCAgencia Estatal de Investigación (España); TEC2016-75067-C4-1-

    Methodologies for the assessment of industrial and energy assets, based on data analysis and BI

    Get PDF
    In July 2020, post pandemic onset, Europe launched the Next Generation EU (NGEU) program. The amount of resources deployed to revitalize Europe has reached 750 billion. The NGEU initiative directs significant resources to Italy. These funds can enable our country to boost investment and increase employment. The missions of Italian Recovery and Resilience Plan (PNRR) include digitization, innovation and sustainable mobility (rail network investments, etc.). In this context, this doctorate thesis discusses the importance of infrastructure for society with a special focus on energy, railway and motorway infrastructure. The central theme of sustainability, defined by the World Commission on Environment and Development (WCDE) as ''development that meets the needs of the present generation without compromising the ability of future generations to meet their needs’’, is also highlighted. Through their activities and relationships, organizations contribute positively or negatively to the goal of sustainable development. Sustainability becomes an integrated part of corporate culture. First research in this thesis describes how Artificial Intelligence techniques can play a supporting role for both maintenance operators in tunnel monitoring and those responsible for safety in operation. Relevant information can be extracted from large volumes of data from sensor equipment in an efficient, fast, dynamic and adaptive manner and made immediately usable by those operating machinery and services to support rapid decisions. Performing sensor-based analysis in motorway tunnels represents a major technological breakthrough that would simplify tunnel management activities and thus the detection of possible deterioration, while keeping risk within tolerance limits. The idea involves the creation of an algorithm for detecting faults, acquiring real-time data from tunnel subsystem sensors and using it to help identify the tunnel's state of service. Artificial intelligence models were trained over a sixmonth period with a granularity of one-hour time series measured on a road tunnel forming part of the Italian motorway systems. The verification was carried out with 3 reference to a series of failures recorded by the sensors. The second research argument is relates to the transfer capacities of high-voltage overhead lines (HVOHL), which are often limited by the critical temperature of the power line, which depends on the magnitude of the current transferred and the environmental conditions, i.e. ambient temperature, wind, etc. In order to use existing power lines more effectively (with a view to progressive decarbonization) and more safely with respect to critical power line temperatures, this work proposes a Dynamic Thermal Rating (DTR) approach using IoT sensors installed on a number of HV OHL located in different geographical locations in Italy. The objective is to estimate the temperature and ampacity of the OHL conductor, using a data-driven thermomechanical model with a bayesian probabilistic approach, in order to improve the confidence interval of the results. This work shows that it might be possible to estimate a spatio-temporal temperature distribution for each OHL and an increase in the threshold values of the effective current to optimize the OHL ampacity. The proposed model was validated using the Monte Carlo method. Finally, in this thesis is presented study on KPIs as indispensable allies of top management in the asset control phase. They are often overwhelmed by the availability of a huge amount of Key Performance Indicators (KPIs). Most managers struggle In understanding and identifying the few vital management metrics and instead collect and report a vast amount of everything that is easy to measure. As a result, they end up drowning in data, thirsty for information. This condition does not allow good systems management. The aim of this research is help the Asset Management System (AMS) of a railway infrastructure manager using business intelligence (BI) to equip itself with a KPI management system in line with the AM presented by the normative ISO 55000 - 55001 - 55002 and UIC (International Union of Railways) guideline, for the specific case of a railway infrastructure. This work starts from the study of these regulations, continues with the exploration, definition and use of KPIs. Subsequently KPIs of a generic infrastructure are identified and analyzed, 4 especially for the specific case of a railway infrastructure manager. These KPIs are fitted in the internal elements of the AM frameworks (ISO-UIC) for systematization. Moreover, an analysis of the KPIs now used in the company is made, compared with the KPIs that an infrastructure manager should have. Starting from here a gap analysis is done for the optimization of AMS

    Risk-Based Optimal Scheduling for the Predictive Maintenance of Railway Infrastructure

    Get PDF
    In this thesis a risk-based decision support system to schedule the predictive maintenance activities, is proposed. The model deals with the maintenance planning of a railway infrastructure in which the due-dates are defined via failure risk analysis.The novelty of the approach consists of the risk concept introduction in railway maintenance scheduling, according to ISO 55000 guidelines, thus implying that the maintenance priorities are based on asset criticality, determined taking into account the relevant failure probability, related to asset degradation conditions, and the consequent damages

    Interactive reinforcement learning innovation to reduce carbon emissions in railway infrastructure maintenance

    Get PDF
    Carbon emission is one of the primary contributors to global warming. The global community is paying great attention to this negative impact. The goal of this study is to reduce the negative impact of railway maintenance by applying reinforcement learning (RL) by optimizing maintenance activities. Railway maintenance is a complex process that may not be efficient in terms of environmental aspect. This study is the world's first to use the potential of RL to reduce carbon emission from railway maintenance. The data used to create the RL model are gathered from the field data between 2016–019. The study section is 30 km long. Proximal Policy Optimization (PPO) is applied in the study to develop the RL model. The results demonstrate that using RL reduces carbon emission from railway maintenance by 48%, which generates a considerable amount of carbon emission reduction and reduces railway defects by 68%, which also improves maintenance efficiency significantly

    Discrete Event Simulation and Optimization Approaches for the Predictive Maintenance of Railway Infrastructure

    Get PDF
    This thesis is carried out within the PhD Course in Logistics and Transport at CIELI - Italian Centre of Excellence on Logistics, Transport and Infrastructures, University of Genoa. In this work, a discrete event simulation and optimization model is created to schedule the predictive maintenance activities. Nowadays, after a severe decrease of transport demand during the pandemic period, rail public transport is resuming a central role for both freight and passenger transport. To cope with this increase in demand, to maintain high safety standards and to avoid unnecessary costs, the idea is to switch to predictive maintenance strategy, intervening before an asset failure and when it has reached a certain state of degradation. The degradation and asset future conditions are predicted according to probabilistic models and maintenance deadlines are defined by applying a risk based approach. The problem is first formulated as a MILP (Mixed Integer Linear Programming) optimization problem and then transformed into a simulation-based optimization problem using the ExtendSim software. Different simulative models are created to take into account the stochastic nature of some variables in real processes. After the formal description of the models, some real-world applications are presented. Finally, considerations on the proposed approach are reported highlighting limits and challenges in predictive maintenance planning, such as lack of data and the stochastic and complex environment

    Modelling decision-making within rail maintenance control rooms

    Get PDF
    This paper presents a cognitive task analysis to derive models of decision-making for rail maintenance processes. Maintenance processes are vital for safe and continuous availability of rail assets and services. These processes are increasingly embracing the ‘Intelligent Infrastructure’ paradigm, which uses automated analysis to predict asset state and potential failure. Understanding the cognitive processes of maintenance operators is critical to underpin design and acceptance of Intelligent Infrastructure. A combination of methods, including observation, interview and an adaptation of critical decision method, was employed to elicit the decision-making strategies of operators in three different types of maintenance control centre, with three configurations of pre-existing technology. The output is a model of decision-making, based on Rasmussen’s decision ladder, that reflects the varying role of automation depending on technology configurations. The analysis also identifies which types of fault were most challenging for operators and identifies the strategies used by operators to manage the concurrent challenges of information deficiencies (both underload and overload). Implications for design are discussed

    Space Weather and Rail: Findings and Outlook

    Get PDF
    Space weather caused by solar activity can disrupt and damage critical infrastructures in space and on the ground. Space-weather impacts to the power grid, aviation, communication, and navigation systems have already been documented. Since society relies increasingly on the services these critical infrastructures provide, awareness of the space weather threat needs to be increased and the associated risks assessed. While most research on impacts of space weather focuses on the power grid, the Global Navigation Satellite System (GNSS), and aviation, railway networks are also a potential area for concern. Anomalies in signalling systems have been observed during geomagnetic storms, and rail transport depends on power, communications, and progressively on GNSS for timing and positioning. In order to raise awareness of this topic, and to further explore the vulnerability of rail systems to space weather, the European Commission’s Joint Research Centre, the Swedish Civil Contingencies Agency, the UK Department for Transport, and the US National Oceanic and Atmospheric Administration jointly organised the “Space weather and rail” workshop in London on 16-17 September 2015. The workshop was attended by representatives from the railway sector, insurance, European and North American government agencies, academia, and the European Commission. This report presents the main findings and conclusions of this workshop.JRC.G.5-Security technology assessmen

    Transportation Systems:Managing Performance through Advanced Maintenance Engineering

    Get PDF

    Criticality analysis for improving maintenance, felling and pruning cycles in power lines

    Get PDF
    16th IFAC Symposium on Information Control Problems in Manufacturing INCOM 2018 Bergamo, Italy, 11–13 June 2018. Edited by Marco Macchi, László Monostori, Roberto PintoThis paper deals with the process of criticality analysis in overhead power lines, as a tool to improve maintenance, felling & pruning programs. Felling & pruning activities are tasks that utility companies must accomplish to respect the servitudes of the overhead lines, concerned with distances to vegetation, buildings, infrastructures and other networks crossings. Conceptually, these power lines servitudes can be considered as failure modes of the maintainable items under our analysis (power line spans), and the criticality analysis methodology developed, will therefore help to optimize actions to avoid these as other failure modes of the line maintainable items. The approach is interesting, but another relevant contribution of the paper is the process followed for the automation of the analysis. Automation is possible by utilizing existing companies IT systems and databases. The paper explains how to use data located in Enterprise Assets Management Systems, GIS and Dispatching systems for a fast, reliable, objective and dynamic criticality analysis. Promising results are included and also discussions about how this technique may result in important implications for this type of businesse
    corecore