3,859 research outputs found

    Dynamic resource constrained multi-project scheduling problem with weighted earliness/tardiness costs

    Get PDF
    In this study, a conceptual framework is given for the dynamic multi-project scheduling problem with weighted earliness/tardiness costs (DRCMPSPWET) and a mathematical programming formulation of the problem is provided. In DRCMPSPWET, a project arrives on top of an existing project portfolio and a due date has to be quoted for the new project while minimizing the costs of schedule changes. The objective function consists of the weighted earliness tardiness costs of the activities of the existing projects in the current baseline schedule plus a term that increases linearly with the anticipated completion time of the new project. An iterated local search based approach is developed for large instances of this problem. In order to analyze the performance and behavior of the proposed method, a new multi-project data set is created by controlling the total number of activities, the due date tightness, the due date range, the number of resource types, and the completion time factor in an instance. A series of computational experiments are carried out to test the performance of the local search approach. Exact solutions are provided for the small instances. The results indicate that the local search heuristic performs well in terms of both solution quality and solution time

    Random Keys Genetic Algorithms Scheduling and Rescheduling Systems for Common Production Systems

    Get PDF
    The majority of scheduling research deals with problems in specific production environments with specific objective functions. However, in many cases, more than one problem type and/or objective function exists, resulting in the need for a more generic and flexible system to generate schedules. Furthermore, most of the published scheduling research focuses on creating an optimal or near optimal initial schedule during the planning phase. However, after production processes start, circumstances like machine breakdowns, urgent jobs, and other unplanned events may render the schedule suboptimal, obsolete or even infeasible resulting in a rescheduling problem, which is typically also addressed for a specific production environment, constraints, and objective functions. This dissertation introduces a generic framework consisting of models and algorithms based on Random Keys Genetic Algorithms (RKGA) to handle both the scheduling and rescheduling problems in the most common production environments and for various types of objective functions. The Scheduling system produces predictive (initial) schedules for environments including single machines, flow shops, job shops and parallel machine production systems to optimize regular objective functions such as the Makespan and the Total Tardiness as well as non-regular objective functions such as the Total Earliness and Tardiness. To deal with the rescheduling problem, and using as a basis the same RKGA, a reactive Rescheduling system capable of repairing initial schedules after the occurrence of unexpected events is introduced. The reactive Rescheduling system was designed not only to optimize regular and non-regular objective functions but also to minimize the instability, a very important aspect in rescheduling to avoid shop chaos due to disruptions. Minimizing both schedule inefficiency and instability, however, turns the problem into a multi-objective optimization problem, which is even more difficult to solve. The computational experiments for the predictive model show that it is able to produce optimal or near optimal schedules to benchmark problems for different production environments and objective functions. Additional computational experiments conducted to test the reactive Rescheduling system under two types of unexpected events, machine breakdowns and the arrival of a rush job, show that the proposed framework and algorithms are robust in handling various problem types and computationally reasonable

    IMPROVED PHOTOLITHOGRAPHY SCHEDULING IN SEMICONDUCTOR MANUFACTURING

    Get PDF
    Photolithography is typically the bottleneck process in semiconductor manufacturing. In this thesis, we present a model for optimizing photolithography job scheduling in the presence of both individual and cluster tools. The combination of individual and cluster tools that process various layers or stages of the semiconductor manufacturing process flow is a special type of flexible flowshop. We seek separately to minimize total weighted completion time and maximize on-time delivery performance. Experimental results suggest that our mathematical- and heuristic-based solution approaches show promise for real world implementation as they can help to improve resource utilization, reduce job completion times, and decrease unnecessary delays in a wafer fab

    The mystical power of twoness: in memoriam Eugene L. Lawler

    Get PDF

    The mystical power of twoness: in memoriam Eugene L. Lawler

    Get PDF

    Energy aware hybrid flow shop scheduling

    Get PDF
    Only if humanity acts quickly and resolutely can we limit global warming' conclude more than 25,000 academics with the statement of SCIENTISTS FOR FUTURE. The concern about global warming and the extinction of species has steadily increased in recent years

    Methods and Techniques Used for Job Shop Scheduling

    Get PDF
    The job shop scheduling problem, in which we must determine the order or sequence for processing a set of jobs through several machines in an optimum manner, has received considerable attention. In this paper a number of the methods and techniques are reviewed and an attempt to categorize them according to their appropriateness for effective use in job shop scheduling has been made. Approaches are classified in two categories: a) analytical techniques and b) graphical methods. Also, it should be noticed that this report does not include all the attempts and trials, especially the heuristic approaches