30 research outputs found

    Formulações matemáticas para o problema de sequenciamento de tarefas com manutenções periódicas e tempos de setup

    Get PDF
    The single-machine scheduling problem with periodic maintenances and sequencedependent setup times aims at scheduling jobs on a single machine in which periodic maintenances and setups are required. The objective is the minimization of the makespan. We propose an exact algorithm based on the iterative solution of three alternative arc-time-indexed models. Extensive computational experiments are carried out on 420 benchmark instances with up to 50 jobs, and on 360 newly proposed instances involving up to 125 jobs. We compare the results found by all formulations with those obtained by the best available mathematical formulation. All instances from the existing dataset are solved to optimality for the first time.O problema de sequenciamento em uma m´aquina estudado neste trabalho tem como objetivo ordenar tarefas em apenas uma m´aquina com per´ıodos de indisponibilidade fixos, levando em considera¸c˜ao tempos de setup dependentes da sequˆencia. O objetivo ´e minimizar o makespan. Neste trabalho ´e proposto um algoritmo exato que resolve, iterativamente, uma de trˆes formula¸c˜ao matem´aticas de arcos indexados no tempo apresentadas. Experimentos computacionais extensivos s˜ao conduzidos em 420 instˆancias da literatura de at´e 50 tarefas, e em 360 instˆancias, envolvendo at´e 125 tarefas, propostas neste trabalho. Os resultados s˜ao comparados com aqueles obtidos pela melhor formula¸c˜ao matem´atica dispon´ıvel na literatura. Pela primeira vez, todas as instˆancias do conjunto existente foram resolvidas na otimalidade

    Comparison of new metaheuristics, for the solution of an integrated jobs-maintenance scheduling problem

    Get PDF
    This paper presents and compares new metaheuristics to solve an integrated jobs-maintenance scheduling problem, on a single machine subjected to aging and failures. The problem, introduced by Zammori et al. (2014), was originally solved using the Modified Harmony Search (MHS) metaheuristic. However, an extensive numerical analysis brought to light some structural limits of the MHS, as the analysis revealed that the MHS is outperformed by the simpler Simulated Annealing by Ishibuchi et al. (1995). Aiming to solve the problem in a more effective way, we integrated the MHS with local minima escaping procedures and we also developed a new Cuckoo Search metaheuristic, based on an innovative Levy Flight. A thorough comparison confirmed the superiority of the newly developed Cuckoo Search, which is capable to find better solutions in a smaller amount of time. This an important result, both for academics and practitioners, since the integrated job-maintenance scheduling problem has a high operational relevance, but it is known to be extremely hard to be solved, especially in a reasonable amount of time. Also, the developed Cuckoo Search has been designed in an extremely flexible way and it can be easily readapted and applied to a wide range of combinatorial problems. (C) 2018 Elsevier Ltd. All rights reserved

    An agent-based genetic algorithm for hybrid flowshops with sequence dependent setup times to minimise makespan

    Full text link
    This paper deals with a variant of flowshop scheduling, namely, the hybrid or flexible flowshop with sequence dependent setup times. This type of flowshop is frequently used in the batch production industry and helps reduce the gap between research and operational use. This scheduling problem is NP-hard and solutions for large problems are based on non-exact methods. An improved genetic algorithm (GA) based on software agent design to minimise the makespan is presented. The paper proposes using an inherent characteristic of software agents to create a new perspective in GA design. To verify the developed metaheuristic, computational experiments are conducted on a well-known benchmark problem dataset. The experimental results show that the proposed metaheuristic outperforms some of the well-known methods and the state-of-art algorithms on the same benchmark problem dataset.The translation of this paper was funded by Universidad Politecnica de Valencia, Spain.Gómez Gasquet, P.; Andrés Romano, C.; Lario Esteban, FC. (2012). An agent-based genetic algorithm for hybrid flowshops with sequence dependent setup times to minimise makespan. Expert Systems with Applications. 39(9):8095-8107. https://doi.org/10.1016/j.eswa.2012.01.158S8095810739

    Dynamic Scheduling for Maintenance Tasks Allocation supported by Genetic Algorithms

    Get PDF
    Since the first factories were created, man has always tried to maximize its production and, consequently, his profits. However, the market demands have changed and nowadays is not so easy to get the maximum yield of it. The production lines are becoming more flexible and dynamic and the amount of information going through the factory is growing more and more. This leads to a scenario where errors in the production scheduling may occur often. Several approaches have been used over the time to plan and schedule the shop-floor’s production. However, some of them do not consider some factors present in real environments, such as the fact that the machines are not available all the time and need maintenance sometimes. This increases the complexity of the system and makes it harder to allocate the tasks competently. So, more dynamic approaches should be used to explore the large search spaces more efficiently. In this work is proposed an architecture and respective implementation to get a schedule including both production and maintenance tasks, which are often ignored on the related works. It considers the maintenance shifts available. The proposed architecture was implemented using genetic algorithms, which already proved to be good solving combinatorial problems such as the Job-Shop Scheduling problem. The architecture considers the precedence order between the tasks of a same product and the maintenance shifts available on the factory. The architecture was tested on a simulated environment to check the algorithm behavior. However, it was used a real data set of production tasks and working stations

    Job Shop Scheduling with Flexible Maintenance Planning

    Get PDF
    This thesis considers the scheduling challenges encountered at a particular facility in the nuclear industry. The scheduling problem is modelled as a variant of the job shop scheduling problem. Important aspects of the considered problem include the scheduling of jobs with both soft and hard due dates, and the integration of maintenance planning with job scheduling. Two variants of the scheduling problem are considered: The first variant makes the classic job shop assumption of infinite queueing capacity at each machine, while such queueing capacity is non-existent in the second variant. Without queueing capacity, the scheduling problem is a variant of the blocking job shop problem. For the non-blocking variant of the problem, it is shown that good solutions can be obtained quickly by hybridising a novel Ant Colony Optimisation method with a novel Branch and Bound method. For the blocking variant of the problem, it is shown that a novel Branch and Bound method can rapidly find optimal solutions. This Branch and Bound method is shown to provide good performance due to, amongst other things, a novel search strategy and a novel branching strategy

    An FPTAS of Minimizing Total Weighted Completion Time on Single Machine with Position Constraint

    Get PDF
    In this paper we study the classical scheduling problem of minimizing the total weighted completion time on a single machine with the constraint that one specific job must be scheduled at a specified position. We give dynamic programs with pseudo-polynomial running time, and a fully polynomial-time approximation scheme (FPTAS)

    A research survey: review of flexible job shop scheduling techniques

    Get PDF
    In the last 25 years, extensive research has been carried out addressing the flexible job shop scheduling (JSS) problem. A variety of techniques ranging from exact methods to hybrid techniques have been used in this research. The paper aims at presenting the development of flexible JSS and a consolidated survey of various techniques that have been employed since 1990 for problem resolution. The paper comprises evaluation of publications and research methods used in various research papers. Finally, conclusions are drawn based on performed survey results. A total of 404 distinct publications were found addressing the FJSSP. Some of the research papers presented more than one technique/algorithm to solve the problem that is categorized into 410 different applications. Selected time period of these research papers is between 1990 and February 2014. Articles were searched mainly on major databases such as SpringerLink, Science Direct, IEEE Xplore, Scopus, EBSCO, etc. and other web sources. All databases were searched for “flexible job shop” and “scheduling” in the title an