63,692 research outputs found
Design choices for agent-based control of AGVs in the dough making process
In this paper we consider a multi-agent system (MAS) for the logistics control of Automatic Guided Vehicles (AGVs) that are used in the dough making process at an industrial bakery. Here, logistics control refers to constructing robust schedules for all transportation jobs. The paper discusses how alternative MAS designs can be developed and compared using cost, frequency of messages between agents, and computation time for evaluating control rules as performance indicators. Qualitative design guidelines turn out to be insufficient to select the best agent architecture. Therefore, we also use simulation to support decision making, where we use real-life data from the bakery to evaluate several alternative designs. We find that architectures in which line agents initiate allocation of transportation jobs, and AGV agents schedule multiple jobs in advance, perform best. We conclude by discussing the benefits of our MAS systems design approach for real-life applications
The implementation of uncertainty evaluation model in manufacturability analysis system for miniature machine tool
The development of Manufacturability Analysis System for micro-machining domain (MicroMAS) is intended to address the need of the 4-axis Miniature Machine Tool (MMT) that require such system to assist the user in generating micro-component through manufacturability evaluation. One of the manufacturability aspects being assessed is the impacts from Uncertainty Evaluation Model (UEM) analysis that analyse the influence of the errors stemmed from the MMT construction on the geometrical accuracy of the machined micro-parts. The model has allowed a methodology for the errors in a custom-made MMT to be predicted and to further understand the origin of the errors on the machined micro-part. This paper reports on the implementation of UEM in the development of MicroMAS. Therefore, the results from uncertainty evaluation towards the MMT were integrated in the database which are interactively searched based on IF-THEN clauses in order to determine which rules satisfy the requirements expressed via inputs
Planning and Design Soa Architecture Blueprint
Service Oriented Architecture (SOA) is a framework for integrating business processes and supporting IT infrastructure as secure, standardized components-services-that can be reused and combined to address changing business priorities. Services are the building blocks of SOA and new applications can be constructed through consuming these services and orchestrating services within a business process. In SOA, services map to the business functions that are identified during business process analysis. Upon a successful implementation of SOA, the enterprise gain benefit by reducing development time, utilizing flexible and responsive application structure, and following dynamic connectivity of application logics between business partners. This paper presents SOA reference architecture blueprint as the building blocks of SOA which is services, service components and flows that together support enterprise business processes and the business goals
Simulation Based Study of Safety Stocks under Short-Term Demand Volatility in Integrated Device Manufacturing.
© IEOM Society InternationalA problem faced by integrated device manufacturers (IDMs) relates to fluctuating demand and can be reflected in long-term demand, middle-term demand, and short-term demand fluctuations. This paper explores safety stock under short term demand fluctuations in integrated device manufacturing. The manufacturing flow of integrated circuits is conceptualized into front end and back end operations with a die bank in between. Using a model of the back-end operations of integrated circuit manufacturing, simulation experiments were conducted based on three scenarios namely a production environment of low demand volatility and high capacity reliability (Scenario A), an environment with lower capacity reliability than scenario A (Scenario B), and an environment of high demand volatility and low capacity reliability (Scenario C). Results show trade-off relation between inventory levels and delivery performance with varied degree of severity between the different scenarios studied. Generally, higher safety stock levels are required to achieve competitive delivery performance as uncertainty in demand increases and manufacturing capability reliability decreases. Back-end cycle time are also found to have detrimental impact on delivery performance as the cycle time increases. It is suggested that success of finished goods safety stock policy relies significantly on having appropriate capacity amongst others to support fluctuations
Recommended from our members
The evaluation and the effectiveness of project management in transformational e-government projects
This paper forms part of an ongoing research of a PhD degree to describe, critically evaluate and examine the underlying barriers and challenges in large e-Government initiatives. The paper invites technology to be incorporated and inculcated into the art and science of project management, and be part of a passable solution as opposed to being distinct and separate from it. The tools used have to increase the novelty (art and science) of project management through human interaction, and empower the project manager and aiding his capacity in delivering the expected outcomes. Due to inadequate implementations of project management procedures and processes, many large information technology systems (ITS) projects failed. This becomes a characteristic and encompasses e-Government project initiatives, due to ambitious program changes, major innovations, large transformations, enterprise wide solutions, collaboration across organizations’ governments and private sectors, and the implementation of unprecedented (or ambitious) solutions. This research paper critically analyses and summarises a list of e-Government challenges and barriers arising from an e-Government survey administered on behalf of the World Information Technology and Services Association (WITSA) which represents the national technology associations in 70 countries. It compares these challenges to the Project Management Body of Knowledge (PMBOK), which is the North American standard in project management methodology. In addition, it highlights the weaknesses in PMBOK to address these challenges and offers a technology-enabled enhancement to the Project Initiation Phase, the area identified as being particularly weak and inadequate in addressing e-Government initiatives and requirements
Automated design analysis, assembly planning and motion study analysis using immersive virtual reality
Previous research work at Heriot-Watt University using immersive virtual reality (VR) for cable harness design showed that VR provided substantial productivity gains over traditional computer-aided design (CAD) systems. This follow-on work was aimed at understanding the degree to which aspects of this technology were contributed to these benefits and to determine if engineering design and planning processes could be analysed in detail by nonintrusively monitoring and logging engineering tasks. This involved using a CAD-equivalent VR system for cable harness routing design, harness assembly and installation planning that can be functionally evaluated using a set of creative design-tasks to measure the system and users' performance. A novel design task categorisation scheme was created and formalised which broke down the cable harness design process and associated activities. The system was also used to demonstrate the automatic generation of usable bulkhead connector, cable harness assembly and cable harness installation plans from non-intrusive user logging. Finally, the data generated from the user-logging allowed the automated activity categorisation of the user actions, automated generation of process flow diagrams and chronocyclegraphs
- …