6,852 research outputs found

    Data mining and fusion

    No full text

    BIM semantic-enrichment for built heritage representation

    Get PDF
    In the built heritage context, BIM has shown difficulties in representing and managing the large and complex knowledge related to non-geometrical aspects of the heritage. Within this scope, this paper focuses on a domain-specific semantic-enrichment of BIM methodology, aimed at fulfilling semantic representation requirements of built heritage through Semantic Web technologies. To develop this semantic-enriched BIM approach, this research relies on the integration of a BIM environment with a knowledge base created through information ontologies. The result is knowledge base system - and a prototypal platform - that enhances semantic representation capabilities of BIM application to architectural heritage processes. It solves the issue of knowledge formalization in cultural heritage informative models, favouring a deeper comprehension and interpretation of all the building aspects. Its open structure allows future research to customize, scale and adapt the knowledge base different typologies of artefacts and heritage activities

    Critical BIM qualification criteria for construction pre-qualification and selection

    Get PDF
    © 2017 Informa UK Limited, trading as Taylor & Francis Group. Despite emerging research on Building Information Modelling (BIM) capability, there remain no studies that specifically look at criteria for the pre-qualification and selection of construction supply chain (CSC) firms for BIM projects. As a consequence, there is insufficient theoretical insight and empirical justification for critical BIM qualification criteria for the CSC context. In order to bridge this knowledge gap, a study was conducted to ascertain the most critical BIM capability attributes, as well as relevance to the pre-qualification and selection of suitable CSC firms for BIM-enabled projects. The relative importance of these criteria was determined based on their perceived influence on overall BIM delivery success on recent BIM-enabled projects. A sequential exploratory mixed methodological research design was adopted involving semi-structured interviews (n = 8) and a Delphi survey (n = 25) of experts, as well as a survey of CSC firms (n = 64) on BIM-enabled projects. The findings reinforce the criticality of past BIM experience in delivery success. Furthermore, it revealed that while technological infrastructure-related capacities (such as software and hardware availability) are perceived as very important qualification criteria, their actual contribution to delivery success is not as high in comparison to criteria related to previous BIM experience. This study provides insights on prioritising BIM capability criteria based on evidence on their contribution to delivery success in practice rather than their perceived importance as capability metrics

    Suggestions to Improve Lean Construction Planning

    Get PDF
    The Last Planner System¼ has been one of the most popular lean construction tools that offers a solution to tackle the problems of production management on construction sites. Since its inception almost 20 years ago, construction companies across the world have implemented Last Planner with reported success. However, even as Last Planner was originally designed to address some shortcomings of the CPM method, a particular shortcoming – namely task continuity was not addressed directly. Also, excepting PPC and Reasons for Non Completion charts, there are no explicit visual tools offered by the Last Planner system. On the other hand, Line of Balance based approaches intrinsically support the consideration of task continuity, and offer a basic visual management approach in schedule representation. With some exceptions, Line of Balance is seen as a special technique applicable only in linear or repetitive work based schedules. The authors suggest that i) there is a need for a robust theory of planning and scheduling and ii) there is a need for a more suitable approach that addresses critical aspects of planning and scheduling function for example by integrating Line of Balance and Last Planner to provide a more robust support for construction scheduling

    Training of Crisis Mappers and Map Production from Multi-sensor Data: Vernazza Case Study (Cinque Terre National Park, Italy)

    Get PDF
    This aim of paper is to presents the development of a multidisciplinary project carried out by the cooperation between Politecnico di Torino and ITHACA (Information Technology for Humanitarian Assistance, Cooperation and Action). The goal of the project was the training in geospatial data acquiring and processing for students attending Architecture and Engineering Courses, in order to start up a team of "volunteer mappers". Indeed, the project is aimed to document the environmental and built heritage subject to disaster; the purpose is to improve the capabilities of the actors involved in the activities connected in geospatial data collection, integration and sharing. The proposed area for testing the training activities is the Cinque Terre National Park, registered in the World Heritage List since 1997. The area was affected by flood on the 25th of October 2011. According to other international experiences, the group is expected to be active after emergencies in order to upgrade maps, using data acquired by typical geomatic methods and techniques such as terrestrial and aerial Lidar, close-range and aerial photogrammetry, topographic and GNSS instruments etc.; or by non conventional systems and instruments such us UAV, mobile mapping etc. The ultimate goal is to implement a WebGIS platform to share all the data collected with local authorities and the Civil Protectio

    Investing in Curation: A Shared Path to Sustainability

    Get PDF
    No abstract available

    Optimization of survey procedures and application of integrated digital tools for seismic risk mitigation of cultural heritage: The Emilia-Romagna damaged theatres.

    Get PDF
    Starting from current procedures, standards and tools for seismic damage survey, the research presents an integrated workflow for seismic damage documentation and survey applied to historic theatres in the Emilia-Romagna region damaged by the 2012 earthquake. The 2012 earthquake highlighted the fragility of the cultural heritage and underscored the lack of proactive conservation and management of historic assets. The research starts by analysing Agenzia Regionale per la Ricostruzione della Regione Emilia-Romagna- ARRER’s requests, which had found criticalities in applying the current Mic (Ministero della Cultura) procedures for the damage survey of complex types: the A-DC form for churches and the B-DP form for buildings. Using the two types of forms highlighted the lack of ad hoc tools for complex architectural styles such as castles, cemeteries and theatres, resulting in the loss of quantitative and qualitative information necessary for knowledge, conservation and thus management of the reconstruction process. As a result of these considerations, national and international standards of integrated documentation, existing digital databases for cataloguing and classification of cultural property, and seismic risk management were studied to develop a workflow of integrated procedures for seismic damage survey on the specific assigned case study: Regional Historic Theaters affected by the 2012 earthquake. The research used the holistic and interdisciplinary approach of integrated documentation to develop the integrated procedural workflow to enhance and optimise seismic damage detection operations in the case study. In providing a workflow of integrated procedures for the prevention and mitigation of hazards related to potential states of emergency, both natural and anthropic, the research follows an “extensive” methodological approach to test the survey outside the Emilia crater. The methodological framework led to the critical-comparative analysis, divided into two levels: the first involved studying critical issues in the B-DP form, mainly used in the 2012 theatre survey. The second level covered the techniques - laser scanning, digital photogrammetry - and integrated survey methodologies applied during the in-depth investigations for repair and restoration work. The critical-comparative analysis and morpho-typological study led to the development of an integrated procedural flow to survey damage in historic theatres. It is aimed at systematising and optimising the stages of damage documentation. The workflow consists of three information levels: L1. Screening level for the visual survey; L2 survey level defines the 3D acquisition steps for the geometric-dimensional study by theatres. The BIM L3 Plus level guides implementing the level of knowledge of parametric HBIM models for documentation, management and monitoring of historic theatres

    ERP implementation methodologies and frameworks: a literature review

    Get PDF
    Enterprise Resource Planning (ERP) implementation is a complex and vibrant process, one that involves a combination of technological and organizational interactions. Often an ERP implementation project is the single largest IT project that an organization has ever launched and requires a mutual fit of system and organization. Also the concept of an ERP implementation supporting business processes across many different departments is not a generic, rigid and uniform concept and depends on variety of factors. As a result, the issues addressing the ERP implementation process have been one of the major concerns in industry. Therefore ERP implementation receives attention from practitioners and scholars and both, business as well as academic literature is abundant and not always very conclusive or coherent. However, research on ERP systems so far has been mainly focused on diffusion, use and impact issues. Less attention has been given to the methods used during the configuration and the implementation of ERP systems, even though they are commonly used in practice, they still remain largely unexplored and undocumented in Information Systems research. So, the academic relevance of this research is the contribution to the existing body of scientific knowledge. An annotated brief literature review is done in order to evaluate the current state of the existing academic literature. The purpose is to present a systematic overview of relevant ERP implementation methodologies and frameworks as a desire for achieving a better taxonomy of ERP implementation methodologies. This paper is useful to researchers who are interested in ERP implementation methodologies and frameworks. Results will serve as an input for a classification of the existing ERP implementation methodologies and frameworks. Also, this paper aims also at the professional ERP community involved in the process of ERP implementation by promoting a better understanding of ERP implementation methodologies and frameworks, its variety and history
    • 

    corecore