66 research outputs found

    Neural Based Tabu Search method for solving unit commitment problem with cooling-banking constraints

    Get PDF
    This paper presents a new approach to solve short-term unit commitment problem (UCP) using Neural Based Tabu Search (NBTS) with cooling and banking constraints. The objective of this paper is to find the generation scheduling such that the total operating cost can be minimized, when subjected to a variety of constraints. This also means that it is desirable to find the optimal generating unit commitment in the power system for next H hours. A 7-unit utility power system in India demonstrates the effectiveness of the proposed approach; extensive studies have also been performed for different IEEE test systems consist of 10, 26 and 34 units. Numerical results are shown to compare the superiority of the cost solutions obtained using the Tabu Search (TS) method, Dynamic Programming (DP) and Lagrangian Relaxation (LR) methods in reaching proper unit commitment

    Stochastic Procurement of Fast Reserve Services in Renewable Integrated Power Systems

    Get PDF
    Ensuring the security and quality of supply in a power system after a contingency event is one of the most challenging tasks for an electricity system operator. This work is initiated by this challenge and proposes a solution based on the use of provided reserves by fast generators, storage devices, and wind farms. A coordinated model is proposed in a joint energy and reserves market considering their corresponding cost to ensure the adequacy in the simultaneous deployment of reserves for the different sources of uncertainties. The Benders decomposition approach is used in the modeling of the stochastic security-constrained unit commitment, and considering the large-scale and complex nature of the model, acceleration techniques are suggested to reduce the execution time. The proposed model is tested on the 6-bus and the IEEE 118-bus test systems. Numerical results show that the optimal values of reserves successfully address contingencies in both of the critical and normal periods after the contingencies and the optimal solution is calculated in a reasonable computing time

    Short-term generation scheduling in a hydrothermal power system.

    Get PDF
    SIGLEAvailable from British Library Document Supply Centre- DSC:D173872 / BLDSC - British Library Document Supply CentreGBUnited Kingdo
    • …
    corecore