5,966 research outputs found
Stronger Lagrangian bounds by use of slack variables: applications to machine scheduling problems
Lagrangian relaxation is a powerful bounding technique that has been applied successfully to manyNP-hard combinatorial optimization problems. The basic idea is to see anNP-hard problem as an easy-to-solve problem complicated by a number of nasty side constraints. We show that reformulating nasty inequality constraints as equalities by using slack variables leads to stronger lower bounds. The trick is widely applicable, but we focus on a broad class of machine scheduling problems for which it is particularly useful. We provide promising computational results for three problems belonging to this class for which Lagrangian bounds have appeared in the literature: the single-machine problem of minimizing total weighted completion time subject to precedence constraints, the two-machine flow-shop problem of minimizing total completion time, and the single-machine problem of minimizing total weighted tardiness
Flow shop scheduling with earliness, tardiness and intermediate inventory holding costs
We consider the problem of scheduling customer orders in a flow shop with the objective of minimizing the sum of tardiness, earliness (finished goods inventory holding) and intermediate (work-in-process) inventory holding costs. We formulate this problem as an integer program, and based on approximate solutions to two di erent, but closely related, Dantzig-Wolfe reformulations, we develop heuristics to minimize the total cost. We exploit the duality between Dantzig-Wolfe reformulation and Lagrangian relaxation to enhance our heuristics. This combined approach enables us to develop two di erent lower bounds on the optimal integer solution, together with intuitive approaches for obtaining near-optimal feasible integer solutions. To the best of our knowledge, this is the first paper that applies column generation to a scheduling problem with di erent types of strongly NP-hard pricing problems which are solved heuristically. The computational study demonstrates that our algorithms have a significant speed advantage over alternate methods, yield good lower bounds, and generate near-optimal feasible integer solutions for problem instances with many machines and a realistically large number of jobs
Parameterized complexity of machine scheduling: 15 open problems
Machine scheduling problems are a long-time key domain of algorithms and
complexity research. A novel approach to machine scheduling problems are
fixed-parameter algorithms. To stimulate this thriving research direction, we
propose 15 open questions in this area whose resolution we expect to lead to
the discovery of new approaches and techniques both in scheduling and
parameterized complexity theory.Comment: Version accepted to Computers & Operations Researc
Asymptotically Optimal Approximation Algorithms for Coflow Scheduling
Many modern datacenter applications involve large-scale computations composed
of multiple data flows that need to be completed over a shared set of
distributed resources. Such a computation completes when all of its flows
complete. A useful abstraction for modeling such scenarios is a {\em coflow},
which is a collection of flows (e.g., tasks, packets, data transmissions) that
all share the same performance goal.
In this paper, we present the first approximation algorithms for scheduling
coflows over general network topologies with the objective of minimizing total
weighted completion time. We consider two different models for coflows based on
the nature of individual flows: circuits, and packets. We design
constant-factor polynomial-time approximation algorithms for scheduling
packet-based coflows with or without given flow paths, and circuit-based
coflows with given flow paths. Furthermore, we give an -approximation polynomial time algorithm for scheduling circuit-based
coflows where flow paths are not given (here is the number of network
edges).
We obtain our results by developing a general framework for coflow schedules,
based on interval-indexed linear programs, which may extend to other coflow
models and objective functions and may also yield improved approximation bounds
for specific network scenarios. We also present an experimental evaluation of
our approach for circuit-based coflows that show a performance improvement of
at least 22% on average over competing heuristics.Comment: Fixed minor typo
Multiprocessor task scheduling in multistage hyrid flowshops: a genetic algorithm approach
This paper considers multiprocessor task scheduling in a multistage hybrid flow-shop environment. The objective is to minimize the make-span, that is, the completion time of all the tasks in the last stage. This problem is of practical interest in the textile and process industries. A genetic algorithm (GA) is developed to solve the problem. The GA is tested against a lower bound from the literature as well as against heuristic rules on a test bed comprising 400 problems with up to 100 jobs, 10 stages, and with up to five processors on each stage. For small problems, solutions found by the GA are compared to optimal solutions, which are obtained by total enumeration. For larger problems, optimum solutions are estimated by a statistical prediction technique. Computational results show that the GA is both effective and efficient for the current problem. Test problems are provided in a web site at www.benchmark.ibu.edu.tr/mpt-h; fsp
Models and Strategies for Variants of the Job Shop Scheduling Problem
Recently, a variety of constraint programming and Boolean satisfiability
approaches to scheduling problems have been introduced. They have in common the
use of relatively simple propagation mechanisms and an adaptive way to focus on
the most constrained part of the problem. In some cases, these methods compare
favorably to more classical constraint programming methods relying on
propagation algorithms for global unary or cumulative resource constraints and
dedicated search heuristics. In particular, we described an approach that
combines restarting, with a generic adaptive heuristic and solution guided
branching on a simple model based on a decomposition of disjunctive
constraints. In this paper, we introduce an adaptation of this technique for an
important subclass of job shop scheduling problems (JSPs), where the objective
function involves minimization of earliness/tardiness costs. We further show
that our technique can be improved by adding domain specific information for
one variant of the JSP (involving time lag constraints). In particular we
introduce a dedicated greedy heuristic, and an improved model for the case
where the maximal time lag is 0 (also referred to as no-wait JSPs).Comment: Principles and Practice of Constraint Programming - CP 2011, Perugia
: Italy (2011
A survey of scheduling problems with setup times or costs
Author name used in this publication: C. T. NgAuthor name used in this publication: T. C. E. Cheng2007-2008 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe
- …