18,547 research outputs found

    Republic of Ghana Country Strategy Paper 2012-2016

    Get PDF
    This report aims to propose a Bank Group's strategy for supporting Ghana's development efforts over the period 2012 -- 2016. Several factors make a new Bank country strategy for Ghana particularly timely at this moment. These include the enormous challenges the country still faces in its development trajectory in spite of its impressive growth in the last decade, the recent adoption by the Government of the "Ghana Shared Growth and Development Agenda" (GSGDA), the promising developments the country is experiencing in its economic prospects, including becoming an oil producer, attracting interest from BRICS, and the recent completion by the Bank and other development partners of a number of key knowledge products. All these combined provides an opportunity for the Bank and Ghana to lay the foundations for a renewed partnership

    BIM and its impact upon project success outcomes from a Facilities Management perspective

    Get PDF
    The uptake of Building Information Modelling (BIM) has been increasing, but some of its promoted potential benefits have been slow to materialise. In particular, claims that BIM will revolutionise facilities management (FM) creating efficiencies in the whole-life of building operations have yet to be achieved on a wide scale, certainly in comparison to tangible progress made for the prior design and construction phases. To attempt to unravel the factors at play in the adoption of BIM during the operational phase, and in particular, understand if adoption by facilities managers (FMs) is lagging behind other disciplines, this study aims to understand if current BIM processes can ease the challenges in this area faced by facilities management project stakeholders. To do this, success from a facilities management viewpoint is considered and barriers to facilities management success are explored, with focused BIM use proposed as a solution to these barriers. Qualitative research was undertaken, using semi structured interviews to collect data from a non-probability sample of 7 project- and facilities- management practitioners. Key results from this study show that the main barrier to BIM adoption by facilities managers is software interoperability, with reports that facilities management systems are unable to easily import BIM data produced during the design and construction stages. Additionally, facilities managers were not treated as salient stakeholders by Project Managers, further negatively affecting facilities management project success outcomes. A µresistance to change was identified as another barrier, as facilities managers were sceptical of the ability of current BIMenabled systems promoted as being FM compatible to be able to replicate their existing Computer Aided Facility Management (CAFM) legacy software and its user required capabilities. The results of this study highlight that more work is needed to ensure that BIM benefits the end user, as there was no reported use of BIM data for dedicated facilities management purposes. Further investigation into the challenges of interoperability could add significant value to this developing research area.The uptake of Building Information Modelling (BIM) has been increasing, but some of its promoted potential benefits have been slow to materialise. In particular, claims that BIM will revolutionise facilities management (FM) creating efficiencies in the whole-life of building operations have yet to be achieved on a wide scale, certainly in comparison to tangible progress made for the prior design and construction phases. To attempt to unravel the factors at play in the adoption of BIM during the operational phase, and in particular, understand if adoption by facilities managers (FMs) is lagging behind other disciplines, this study aims to understand if current BIM processes can ease the challenges in this area faced by facilities management project stakeholders. To do this, success from a facilities management viewpoint is considered and barriers to facilities management success are explored, with focused BIM use proposed as a solution to these barriers. Qualitative research was undertaken, using semi structured interviews to collect data from a non-probability sample of 7 project- and facilities- management practitioners. Key results from this study show that the main barrier to BIM adoption by facilities managers is software interoperability, with reports that facilities management systems are unable to easily import BIM data produced during the design and construction stages. Additionally, facilities managers were not treated as salient stakeholders by Project Managers, further negatively affecting facilities management project success outcomes. A µresistance to change was identified as another barrier, as facilities managers were sceptical of the ability of current BIMenabled systems promoted as being FM compatible to be able to replicate their existing Computer Aided Facility Management (CAFM) legacy software and its user required capabilities. The results of this study highlight that more work is needed to ensure that BIM benefits the end user, as there was no reported use of BIM data for dedicated facilities management purposes. Further investigation into the challenges of interoperability could add significant value to this developing research area

    Policy Discussion Document:Towards Open Data for Agricultural Transformationin Ghana

    Get PDF
    This is a summary of a policy discussion document that was prepared under the leadership of the e-Agriculture Unit of the Ministry of Food and Agriculture (MoFA) in Ghana. The process was facilitated by the Dutch Ministry of Land, Nature and Food Safety(LNV), with participation of national experts from Ghana, and coordinating consultants from Wageningen University Research (WeNR)and CTA, The Netherlands

    Post-macroeconomics -- reflections on the crisis and strategic directions ahead

    Get PDF
    For decades, many researchers argued that economics had nothing to fear from enriching itself with lessons and advances from other disciplines. Unfortunately, these suggestions were either neglected or dismissed upfront in what was then arbitrarily considered mainstream economics. The global crisis has led even Nobel Prize winners to acknowledge that the problem facing economists and policy makers today is mostly intellectual - it is the need to confront the systematic failure of thinking, especially on the part of macroeconomists. Despite its unprecedented magnitude and heavy financial, human, and intellectual cost, the crisis certainly does not invalidate everything that has been learned about macroeconomics. However, the costs highlight some of mistakes of the dominant intellectual macroeconomic framework. Post-macroeconomics should not be understood as another metanarrative of the end of metanarratives. The use of the prefix post here suggests and emphasizes much more than temporal posterity. Post-macroeconomics should follow from macroeconomics more than it follows after macroeconomics. The theorizing of post-macroeconomics is therefore neither systematically oppositional nor hegemonic. It does not advocate a - dialectic opposition - between macroeconomics and post-macroeconomics. Rather, it suggests that the latter builds on the former and goes beyond it.Economic Theory&Research,Debt Markets,,Banks&Banking Reform,Access to Finance

    Engineering Method and Tool for the Complete Virtual Commissioning of Robotic Cells

    Get PDF
    Intelligent robotic manufacturing cells must adapt to ever-varying operating conditions, developing autonomously optimal manufacturing strategies to achieve the best quality and overall productivity. Intelligent and cognitive behaviors are realized by using distributed controllers, in which complex control logics must interact and process a wide variety of input/output signals. In particular, programmable logic controllers (PLCs) and robot controllers must be coordinated and integrated. Then, there is the need to simulate the robotic cells’ behavior for performance verification and optimization by evaluating the effects of both PLC and robot control codes. In this context, this work proposes a method, and its implementation into an integrated tool, to exploit the potential of ABB RobotStudio software as a virtual prototyping platform for robotic cells, in which real robots control codes are executed on a virtual controller and integrated with Beckhoff PLC environment. For this purpose, a PLC Smart Component was conceived as an extension of RobotStudio functionalities to exchange signals with a TwinCAT instance. The new module allows the virtual commissioning of a complete robotic cell to be performed, assessing the control logics effects on the overall productivity. The solution is demonstrated on a robotic assembly cell, showing its feasibility and effectiveness in optimizing the final performance
    corecore