666 research outputs found

    Joint optimisation of inspection maintenance and spare parts provisioning: a comparative study of inventory policies using simulation and survey data

    Get PDF
    The demand for industrial plant spare parts is driven, at least in part, by maintenance requirements. It is therefore important to jointly optimise planned maintenance and the associated spare parts inventory using the most appropriate maintenance and replenishment policies. In this simulation-based study, we address this challenge in the context of the random failure of parts in service and the replacement of defective parts at inspections of period T. Inspections are modelled using the delay-time concept. A number of simultaneous periodic review and continuous review replenishment policies are compared. A paper making plant provides a real context for the presentation of our ideas. We survey practitioners working with such plant to collect real data that inform the values of parameters in the models. Our simulation results indicate that a periodic review policy with ordering that is twice as frequent as inspection is cost optimal in the context of the plant that we study. For the purpose of comparison, we also present and discuss the characteristics of the various policies considered

    Joint maintenance-inventory optimisation of parallel production systems

    Get PDF
    We model a joint inspection and spare parts inventory policy for maintaining machines in a parallel system, where simultaneous downtime seriously impacts upon production performance and has a significant financial consequence. This dependency between system components means that analysis of realistic maintenance models is intractable. Therefore we use simulation and a numerical optimisation tool to study the cost-optimality of several policies. Inspection maintenance is modelled using the delay-time concept. Critical spare parts replenishment is considered using several variants of a periodic review policy. In particular, our results indicate that the cost-optimal policy is characterised by equal frequencies of inspection and replenishment, and delivery of spare parts that coincides with maintenance intervention. In general, our model provides a framework for studying the interaction of spare parts ordering with maintenance scheduling. The sensitivity analysis that we present offers insights for the effective management of such parallel systems, not only in a paper-making plant, which motivates our modelling development, but also in other manufacturing contexts

    Joint Optimization of Preventive Maintenance and Spare Parts Inventory with Appointment Policy

    Get PDF
    Under the background of the wide application of condition-based maintenance (CBM) in maintenance practice, the joint optimization of maintenance and spare parts inventory is becoming a hot research to take full advantage of CBM and reduce the operational cost. In order to avoid both the high inventory level and the shortage of spare parts, an appointment policy of spare parts is first proposed based on the prediction of remaining useful lifetime, and then a corresponding joint optimization model of preventive maintenance and spare parts inventory is established. Due to the complexity of the model, the combination method of genetic algorithm and Monte Carlo is presented to get the optimal maximum inventory level, safety inventory level, potential failure threshold, and appointment threshold to minimize the cost rate. Finally, the proposed model is studied through a case study and compared with both the separate optimization and the joint optimization without appointment policy, and the results show that the proposed model is more effective. In addition, the sensitivity analysis shows that the proposed model is consistent with the actual situation of maintenance practices and inventory management

    Simultaneous Optimization of Block Replacement and Spare Part Ordering TIME for a Multi Component System with Separate Spare Part Ordering for Block and Failure Replacements

    Get PDF
    A block replacement schedule can be optimized simultaneously with a spare parts ordering schedule, since all items are replaced at a constant interval. The solution of joint optimization for spare parts ordering time and block replacement gives lower costs compared to separate optimization of ordering time and replacement time. The spare parts for replacement can be classified as stochastic demand for failure replacement and deterministic demand for block replacement. In this paper, we propose a simulation model for a separate spare parts ordering schedule. The solution was compared to the solution for a model with common spare parts for both failure and block replacement. The system has N identical components, each with a Weibull lifetime distribution. The costs of failure and block replacements, and also the costs of ordering, holding and shortage of spare parts are given. The proposed model was shown to perform better than the common order model. Also, compared to the age replacement model, the solution of the proposed model is relatively similar, yet the economies of scale would be an advantage for the block replacement over age replacement

    Prognostics-Based Two-Operator Competition for Maintenance and Service Part Logistics

    Get PDF
    Prognostics and timely maintenance of components are critical to the continuing operation of a system. By implementing prognostics, it is possible for the operator to maintain the system in the right place at the right time. However, the complexity in the real world makes near-zero downtime difficult to achieve partly because of a possible shortage of required service parts. This is realistic and quite important in maintenance practice. To coordinate with a prognostics-based maintenance schedule, the operator must decide when to order service parts and how to compete with other operators who also need the same parts. This research addresses a joint decision-making approach that assists two operators in making proactive maintenance decisions and strategically competing for a service part that both operators rely on for their individual operations. To this end, a maintenance policy involving competition in service part procurement is developed based on the Stackelberg game-theoretic model. Variations of the policy are formulated for three different scenarios and solved via either backward induction or genetic algorithm methods. Unlike the first two scenarios, the possibility for either of the operators being the leader in such competitions is considered in the third scenario. A numerical study on wind turbine operation is provided to demonstrate the use of the joint decision-making approach in maintenance and service part logistics

    Modelling and simulation for the joint maintenance-inventory optimisation of production systems

    Get PDF
    Simulation methodologies are developed to model the joint optimization of preventive maintenance and spare parts inventory for a specific industrial plant under different production configurations. First, spare parts provisioning for a single-line system is considered, with the assumption that the demand is driven by maintenance requirements. The results indicate that a periodic review policy with replenishment as frequent as inspection is cost-optimal. Second, the joint optimization model for a multi-line (parallel) system is developed. It is found that a just-in-time review policy with inspection as frequent as replenishment produces the lowest cost policy. In this latter case, an implication of the proposed methodology is that, where mathematical modelling is intractable, or the use of certain assumptions make them impractical, simulation modelling is an appropriate solution tool. Under both production settings, the long-run average cost per unit time is used as the optimality criterion for the comparison of several policies

    Optimal maintenance and replacement decisions under technological change with consideration of spare parts inventories

    Get PDF
    International audienceClassical spare parts inventory models assume that the same vintage of technology will be utilized throughout the planning horizon. However, replacement often occurs in the form of a new technology that renders existing spare parts inventories obsolete. This paper aims to study the impact of spare parts inventory on maintenance and replacement decisions under technological change via a Markov decision process formulation. The replacement decision is complex in that one must decide with which technology available on the market to replace the current asset. Under technological change, the do nothing and repair options have significantly more value as they allow the appearance of even better technologies in the future

    State of the art in simulation-based optimisation for maintenance systems

    Get PDF
    Recently, more attention has been directed towards improving and optimising maintenance in manufacturing systems using simulation. This paper aims to report the state of the art in simulation-based optimisation of maintenance by systematically classifying the published literature and outlining main trends in modelling and optimising maintenance systems. The authors investigate application areas and published real case studies as well as researched maintenance strategies and policies. Much of the research in this area is focusing on preventive maintenance and optimising preventive maintenance frequency that will lead to the minimum cost. Discrete event simulation was the most reported technique to model maintenance systems whereas modern optimisation methods such as Genetic Algorithms was the most reported optimisation method in the literature. On this basis, the paper identifies the current gaps and discusses future prospects. Further research can be done to develop a framework that guides the experimenting process with different maintenance strategies and policies. More real case studies can be conducted on multi-objective optimisation and condition based maintenance especially in a production context
    • …
    corecore