Iterated-greedy-based algorithms with beam search initialization for the permutation flowshop to minimize total tardiness
The permutation flow shop scheduling problem is one of the most studied operations research related problems. Literally, hundreds of exact and approximate algorithms have been proposed to optimise several objective functions. In this paper we address the total tardiness criterion, which is aimed towards the satisfaction of customers in a make-to-order scenario. Although several approximate algorithms have been proposed for this problem in the literature, recent contributions for related problems suggest that there is room for improving the current available algorithms. Thus, our contribution is twofold: First, we propose a fast beam-search-based constructive heuristic that estimates the quality of partial sequences without a complete evaluation of their objective function. Second, using this constructive heuristic as initial solution, eight variations of an iterated-greedy-based algorithm are proposed. A comprehensive computational evaluation is performed to establish the efficiency of our proposals against the existing heuristics and metaheuristics for the problem.Ministerio de Ciencia e Innovación DPI2013-44461-PMinisterio de Ciencia e Innovación DPI2016-80750-
Variable Annealing Length and Parallelism in Simulated Annealing
In this paper, we propose: (a) a restart schedule for an adaptive simulated
annealer, and (b) parallel simulated annealing, with an adaptive and
parameter-free annealing schedule. The foundation of our approach is the
Modified Lam annealing schedule, which adaptively controls the temperature
parameter to track a theoretically ideal rate of acceptance of neighboring
states. A sequential implementation of Modified Lam simulated annealing is
almost parameter-free. However, it requires prior knowledge of the annealing
length. We eliminate this parameter using restarts, with an exponentially
increasing schedule of annealing lengths. We then extend this restart schedule
to parallel implementation, executing several Modified Lam simulated annealers
in parallel, with varying initial annealing lengths, and our proposed parallel
annealing length schedule. To validate our approach, we conduct experiments on
an NP-Hard scheduling problem with sequence-dependent setup constraints. We
compare our approach to fixed length restarts, both sequentially and in
parallel. Our results show that our approach can achieve substantial
performance gains, throughout the course of the run, demonstrating our approach
to be an effective anytime algorithm.Comment: Tenth International Symposium on Combinatorial Search, pages 2-10.
June 201
A survey of scheduling problems with setup times or costs
Author name used in this publication: C. T. NgAuthor name used in this publication: T. C. E. Cheng2007-2008 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe
Flowshop scheduling problems with due date related objectives: A review of the literature
3rd International Conference on Industrial Engineering and Industrial Management
XIII Congreso de Ingeniería de Organización
Barcelona-Terrassa, September 2nd-4th 200
Multi-objective sequence dependent setup times permutation flowshop: A new algorithm and a comprehensive study
The permutation flowshop scheduling problem has been thoroughly studied in recent decades, both from single objective as well as from multi-objective perspectives. To the best of our knowledge, little has been done regarding the multi-objective flowshop with Pareto approach when sequence dependent setup times are considered. As setup times and multi-criteria problems are important in industry, we must focus on this area. We propose a simple, yet powerful algorithm for the sequence dependent setup times flowshop problem with several criteria. The presented method is referred to as Restarted Iterated Pareto Greedy or RIPG and is compared against the best performing approaches from the relevant literature. Comprehensive computational and statistical analyses are carried out in order to demonstrate that the proposed RIPG method clearly outperforms all other algorithms and, as a consequence, it is a state-of- art method for this important and practical scheduling problemThe authors thank the anonymous referees for their careful and detailed comments which have helped improve this manuscript considerably. This work is partially financed by the Spanish Ministry of Science and Innovation, under the projects "SMPA-Advanced Parallel Multiobjective Sequencing: Practical and Theorerical Advances" with reference DPI2008-03511/DPI and "RESULT-Realistic Extended Scheduling Using Light Techniques" with reference DPI2012-36243-C02-01 and by the Small and Medium Industry of the Generalitat Valenciana (IMPIVA) and by the European Union through the European Regional Development Fund (FEDER) inside the R+D program "Ayudas dirigidas a Institutos Tecnologicos de la Red IMPIVA" during the year 2011, with project numbers IMDEEA/2011/142 and IMDEEA/2012/143.Ciavotta, M.; Minella, GG.; Ruiz García, R. (2013). Multi-objective sequence dependent setup times permutation flowshop: A new algorithm and a comprehensive study. European Journal of Operational Research. 227(2):301-313. https://doi.org/10.1016/j.ejor.2012.12.031S301313227
- …