An assembly oriented design framework for product structure engineering and assembly sequence planning
The paper describes a novel framework for an assembly-oriented design (AOD) approach as a new functional product lifecycle management (PLM) strategy, by considering product design and assembly sequence planning phases concurrently. Integration issues of product life cycle into the product development process have received much attention over the last two decades, especially at the detailed design stage. The main objective of the research is to define assembly sequence into preliminary design stages by introducing and applying assembly process knowledge in order to provide an assembly context knowledge to support life-oriented product development process, particularly for product structuring. The proposed framework highlights a novel algorithm based on a mathematical model integrating boundary conditions related to DFA rules, engineering decisions for assembly sequence and the product structure definition. This framework has been implemented in a new system called PEGASUS considered as an AOD module for a PLM system. A case study of applying the framework to a catalytic-converter and diesel particulate filter sub-system, belonging to an exhaust system from an industrial automotive supplier, is introduced to illustrate the efficiency of the proposed AOD methodology
Optimizing floating guard ring designs for FASPAX N-in-P silicon sensors
FASPAX (Fermi-Argonne Semiconducting Pixel Array X-ray detector) is being
developed as a fast integrating area detector with wide dynamic range for time
resolved applications at the upgraded Advanced Photon Source (APS.) A burst
mode detector with intended \mbox{13 MHz} image rate, FASPAX will also
incorporate a novel integration circuit to achieve wide dynamic range, from
single photon sensitivity to x-rays/pixel/pulse. To achieve
these ambitious goals, a novel silicon sensor design is required. This paper
will detail early design of the FASPAX sensor. Results from TCAD optimization
studies, and characterization of prototype sensors will be presented.Comment: IEEE NSS-MIC 2015 Conference recor
Matrix management for aerospace 2000
The martix management approach to program management is an organized effort for attaining program objectives by defining and structuring all elements so as to form a single system whose parts are united by interaction. The objective of the systems approach is uncompromisingly complete coverage of the program management endeavor. Starting with an analysis of the functions necessary to carry out a given program, a model must be defined; a matrix of responsibility assignment must be prepared; and each operational process must be examined to establish how it is to be carried out and how it relates to all other processes
Integration of Cost andWork Breakdown Structures in the Management of Construction Projects
Scope management allows project managers to react when a project underperforms regarding schedule, budget, and/or quality at the execution stage. Scope management can also minimize project changes and budget omissions, as well as improve the accuracy of project cost estimates and risk responses. For scope management to be effective, though, it needs to rely on a robust work breakdown structure (WBS). A robust WBS hierarchically and faithfully reflects all project tasks and work packages so that projects are easier to manage. If done properly, the WBS also allows meeting the project objectives while delivering the project on time, on budget, and with the required quality. This paper analyzes whether the integration of a cost breakdown structure (CBS) can lead to the generation of more robust WBSs in construction projects. Over the last years, some international organizations have standardized and harmonized different cost classification systems (e.g., ISO 12006-2, ISO 81346-12, OmniClass, CoClass, UniClass). These cost databases have also been introduced into building information modeling (BIM) frameworks. We hypothesize that in BIM environments, if these CBSs are used to generate the project WBS, several advantages are gained such as sharper project definition. This enhanced project definition reduces project contradictions at both planning and execution stages, anticipates potential schedule and budget deviations, improves resource allocation, and overall it allows a better response to potential project risks. The hypothesis that the use of CBSs can generate more robust WBSs is tested by the response analysis of a questionnaire survey distributed among construction practitioners and project managers. By means of structural equation modeling (SEM), the correlation (agreement) and perception differences between two 250-respondent subsamples (technical project staff vs. project management staff) are also discussed. Results of this research support the use of CBSs by construction professionals as a basis to generate WBSs for enhanced project management (PM)
From Design to Production Control Through the Integration of Engineering Data Management and Workflow Management Systems
At a time when many companies are under pressure to reduce "times-to-market"
the management of product information from the early stages of design through
assembly to manufacture and production has become increasingly important.
Similarly in the construction of high energy physics devices the collection of
(often evolving) engineering data is central to the subsequent physics
analysis. Traditionally in industry design engineers have employed Engineering
Data Management Systems (also called Product Data Management Systems) to
coordinate and control access to documented versions of product designs.
However, these systems provide control only at the collaborative design level
and are seldom used beyond design. Workflow management systems, on the other
hand, are employed in industry to coordinate and support the more complex and
repeatable work processes of the production environment. Commercial workflow
products cannot support the highly dynamic activities found both in the design
stages of product development and in rapidly evolving workflow definitions. The
integration of Product Data Management with Workflow Management can provide
support for product development from initial CAD/CAM collaborative design
through to the support and optimisation of production workflow activities. This
paper investigates this integration and proposes a philosophy for the support
of product data throughout the full development and production lifecycle and
demonstrates its usefulness in the construction of CMS detectors.Comment: 18 pages, 13 figure
The "fuzzy front end" of innovation
The fast transformation of technologies into new products or processes is one of the core challenges for any technology-based enterprise. Within the innovation process, we believe, the early phases (fuzzy front end) to have the highest impact on the whole process and the result (Input-Output Process), since it will influence the design and total costs of the innovation extremely. However the Fuzzy Front End is unfortunately the least-well structured part of the innovation process, both in theory and in practice. The focus of the present chapter is on methods and tools to manage the fuzzy front end of the innovation process. Firstly, the activities, characteristics, and challenges of the front end are described. Secondly, a framework of the application fields for different methods and tools is presented: Since a product upgrade requires a different approach compared to radical innovation, where the market is unknown and a new technology is applied, we believe such a framework to be useful for practitioners. Thirdly, a selection of methods and tools that can be applied to the fuzzy front end are presented and allocated within the framework. The methods selected here address process improvements, concept generation, and concept testing. --fuzzy front end,innovation management,stage-gate process,frontloading,triz,dsm-matrix,lead user
Integration of a failure monitoring within a hybrid dynamic simulation environment
The complexity and the size of the industrial chemical processes induce the monitoring of a growing number of process variables. Their knowledge is generally based on the measurements of system variables and on the physico-chemical models of the process. Nevertheless this information is imprecise because of process and measurement noise. So the research ways aim at developing new and more powerful techniques for the detection of process fault. In this work, we present a method for the fault detection based on the comparison between the real system and the reference model evolution generated by the extended Kalman filter. The reference model is simulated by the dynamic hybrid simulator, PrODHyS. It is a general object-oriented environment which provides common and reusable components designed for the development and the management of dynamic simulation of industrial systems. The use of this method is illustrated through a didactic example relating to the field of Chemical Process System Engineering
- …