    The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review

    Get PDF
    Purpose: The goal of this article is to provide an extensive literature review of the models and solution procedures proposed by many researchers interested on the Project Scheduling Problem with nondeterministic activities duration. Design/methodology/approach: This paper presents an exhaustive literature review, identifying the existing models where the activities duration were taken as uncertain or random parameters. In order to get published articles since 1996, was employed the Scopus database. The articles were selected on the basis of reviews of abstracts, methodologies, and conclusions. The results were classified according to following characteristics: year of publication, mathematical representation of the activities duration, solution techniques applied, and type of problem solved. Findings: Genetic Algorithms (GA) was pointed out as the main solution technique employed by researchers, and the Resource-Constrained Project Scheduling Problem (RCPSP) as the most studied type of problem. On the other hand, the application of new solution techniques, and the possibility of incorporating traditional methods into new PSP variants was presented as research trends. Originality/value: This literature review contents not only a descriptive analysis of the published articles but also a statistical information section in order to examine the state of the research activity carried out in relation to the Project Scheduling Problem with non-deterministic activities duration.Peer Reviewe

    Heuristic Procedures to Solve Sequencing and Scheduling Problems in Automobile Industry

    Get PDF
    With the growing trend for greater product variety, mixed-model assembly nowadays is commonly employed in many industries, which can enable just-in-time production for a production system with high variety. Efficient production scheduling and sequencing is important to achieve the overall material supply, production, and distribution efficiency around the mixed-model assembly line. This research addresses production scheduling and sequencing on a mixed-model assembly line for products with multiple product options, considering multiple objectives with regard to material supply, manufacturing, and product distribution. This research also addresses plant assignment for a product with multiple product options as a prior step to scheduling and sequencing for a mixed-model assembly line. This dissertation is organized into three parts based on three papers. Introduction and literature review Part 1. In an automobile assembly plant many product options often need to be considered in sequencing an assembly line with which multiple objectives often need to be considered. A general heuristic procedure is developed for sequencing automobile assembly lines considering multiple options. The procedure uses the construction, swapping, and re-sequencing steps, and a limited search for sequencing automobile assembly lines considering multiple options. Part 2. In a supply chain, production scheduling and finished goods distribution have been increasingly considered in an integrated manner to achieve an overall best efficiency. This research presents a heuristic procedure to achieve an integrated consideration of production scheduling and product distribution with production smoothing for the automobile just-in-time production assembly line. A meta-heuristic procedure is also developed for improving the heuristic solution. Part 3. For a product that can be manufactured in multiple facilities, assigning orders to the facility is a common problem faced by industry considering production, material constraints, and other supply-chain related constraints. This paper addresses products with multiple product options for plant assignment with regard to multiple constraints at individual plants in order to minimize transportation costs and costs of assignment infeasibility. A series of binary- and mixed-integer programming models are presented, and a decision support tool based on optimization models is presented with a case study. Summary and conclusion

    Optimization Algorithms in Project Scheduling

    Get PDF
    Scheduling, or planning in a general perspective, is the backbone of project management; thus, the successful implementation of project scheduling is a key factor to projects’ success. Due to its complexity and challenging nature, scheduling has become one of the most famous research topics within the operational research context, and it has been widely researched in practical applications within various industries, especially manufacturing, construction, and computer engineering. Accordingly, the literature is rich with many implementations of different optimization algorithms and their extensions within the project scheduling problem (PSP) analysis field. This study is intended to exhibit the general modelling of the PSP, and to survey the implementations of various optimization algorithms adopted for solving the different types of the PSP

    A risk-based approach applied to system engineering projects: a new learning based multi-criteria decision support tool based on an ant colony algorithm

    Get PDF
    This article proposes a multi-criteria decision support tool fully integrated within system engineering and project management processes that allows decision makers to select an optimal scenario of a project. A model based on an oriented graph includes all the alternative choices of a new system’s conception and realization. These choices take into account the risks inherent to perform project tasks in terms of cost and duration. The model of the graph is constructed by considering all the collaborative decisions of the different actors involved in the project. This decision support tool is based on an Ant Colony Algorithm (ACO) for its ability to provide optimal solutions in a reasonable amount of time. The model developed is a multi-objective new ant colony algorithm based on an innovative learning mechanism (named MONACO) that allows ants to learn from their previous choices in order to influence the future ones. The objectives to be minimized are the total cost of the project, its global duration and the risk associated with these criteria. The risk is modeled as an uncertainty related to the increase of the nominal values of cost and duration. The optimization tool is a part of an integrated and more global process, based on industrial standards (the System Engineering process and the Project Management one) that are widely known and used in companies

    The Application of Ant Colony Optimization

    Get PDF
    The application of advanced analytics in science and technology is rapidly expanding, and developing optimization technics is critical to this expansion. Instead of relying on dated procedures, researchers can reap greater rewards by utilizing cutting-edge optimization techniques like population-based metaheuristic models, which can quickly generate a solution with acceptable quality. Ant Colony Optimization (ACO) is one the most critical and widely used models among heuristics and meta-heuristics. This book discusses ACO applications in Hybrid Electric Vehicles (HEVs), multi-robot systems, wireless multi-hop networks, and preventive, predictive maintenance

    A Review on Energy Consumption Optimization Techniques in IoT Based Smart Building Environments

    Get PDF
    In recent years, due to the unnecessary wastage of electrical energy in residential buildings, the requirement of energy optimization and user comfort has gained vital importance. In the literature, various techniques have been proposed addressing the energy optimization problem. The goal of each technique was to maintain a balance between user comfort and energy requirements such that the user can achieve the desired comfort level with the minimum amount of energy consumption. Researchers have addressed the issue with the help of different optimization algorithms and variations in the parameters to reduce energy consumption. To the best of our knowledge, this problem is not solved yet due to its challenging nature. The gap in the literature is due to the advancements in the technology and drawbacks of the optimization algorithms and the introduction of different new optimization algorithms. Further, many newly proposed optimization algorithms which have produced better accuracy on the benchmark instances but have not been applied yet for the optimization of energy consumption in smart homes. In this paper, we have carried out a detailed literature review of the techniques used for the optimization of energy consumption and scheduling in smart homes. The detailed discussion has been carried out on different factors contributing towards thermal comfort, visual comfort, and air quality comfort. We have also reviewed the fog and edge computing techniques used in smart homes
    • …