88,132 research outputs found

    Quality assurance program guidelines for application to and use by manufacturers of rail/guideway vehicles, buses, automatic train control systems, and their major subsystems

    Get PDF
    Guidelines are presented for a quality assurance system to be implemented by the manufacturer in support of designing, developing, fabricating, assembling, inspecting, testing, handling, and delivery of equipment being procured for use in public urban mass transit systems. The guidelines apply to this equipment when being procured for: (1) use in revenue service; (2) demonstration of systems that will be revenue producing or used by the public; (3) use as a prototype for follow-on operational/revenue producing equipment procurements; and (4) qualification tests

    Reliability demonstration for safety-critical systems

    Get PDF
    This paper suggests a new model for reliability demonstration of safety-critical systems, based on the TRW Software Reliability Theory. The paper describes the model; the test equipment required and test strategies based on the various constraints occurring during software development. The paper also compares a new testing method, Single Risk Sequential Testing (SRST), with the standard Probability Ratio Sequential Testing method (PRST), and concludes that: • SRST provides higher chances of success than PRST • SRST takes less time to complete than PRST • SRST satisfies the consumer risk criterion, whereas PRST provides a much smaller consumer risk than the requirement

    Advanced Manned Launch System (AMLS) study

    Get PDF
    To assure national leadership in space operations and exploration in the future, NASA must be able to provide cost effective and operationally efficient space transportation. Several NASA studies and the joint NASA/DoD Space Transportation Architecture Studies (STAS) have shown the need for a multi-vehicle space transportation system with designs driven by enhanced operations and low costs. NASA is currently studying an advanced manned launch system (AMLS) approach to transport crew and cargo to the Space Station Freedom. Several single and multiple stage systems from air-breathing to all-rocket concepts are being examined in a series of studies potential replacements for the Space Shuttle launch system in the 2000-2010 time frame. Rockwell International Corporation, under contract to the NASA Langley Research Center, has analyzed a two-stage all-rocket concept to determine whether this class of vehicles is appropriate for the AMLS function. The results of the pre-phase A study are discussed

    Program on State Agency Remote Sensing Data Management (SARSDM)

    Get PDF
    A planning study for developing a Missouri natural resources information system (NRIS) that combines satellite-derived data and other information to assist in carrying out key state tasks was conducted. Four focal applications -- dam safety, ground water supply monitoring, municipal water supply monitoring, and Missouri River basin modeling were identified. Major contributions of the study are: (1) a systematic choice and analysis of a high priority application (water resources) for a Missouri, LANDSAT-based information system; (2) a system design and implementation plan, based on Missouri, but useful for many other states; (3) an analysis of system costs, component and personnel requirements, and scheduling; and (4) an assessment of deterrents to successful technological innovation of this type in state government, and a system management plan, based on this assessment, for overcoming these obstacles in Missouri

    Some conservative stopping rules for the operational testing of safety-critical software

    Get PDF
    Operational testing, which aims to generate sequences of test cases with the same statistical properties as those that would be experienced in real operational use, can be used to obtain quantitative measures of the reliability of software. In the case of safety critical software it is common to demand that all known faults are removed. This means that if there is a failure during the operational testing, the offending fault must be identified and removed. Thus an operational test for safety critical software takes the form of a specified number of test cases (or a specified period of working) that must be executed failure-free. This paper addresses the problem of specifying the numbers of test cases (or time periods) required for a test, when the previous test has terminated as a result of a failure. It has been proposed that, after the obligatory fix of the offending fault, the software should be treated as if it were completely novel, and be required to pass exactly the same test as originally specified. The reasoning here claims to be conservative, inasmuch as no credit is given for any previous failure-free operation prior to the failure that terminated the test. We show that, in fact, this is not a conservative approach in all cases, and propose instead some new Bayesian stopping rules. We show that the degree of conservatism in stopping rules depends upon the precise way in which the reliability requirement is expressed. We define a particular form of conservatism that seems desirable on intuitive grounds, and show that the stopping rules that exhibit this conservatism are also precisely the ones that seem preferable on other grounds

    Structural reliability prediction of a steel bridge element using dynamic object oriented Bayesian Network (DOOBN)

    Get PDF
    Different from conventional methods for structural reliability evaluation, such as, first/second-order reliability methods (FORM/SORM) or Monte Carlo simulation based on corresponding limit state functions, a novel approach based on dynamic objective oriented Bayesian network (DOOBN) for prediction of structural reliability of a steel bridge element has been proposed in this paper. The DOOBN approach can effectively model the deterioration processes of a steel bridge element and predict their structural reliability over time. This approach is also able to achieve Bayesian updating with observed information from measurements, monitoring and visual inspection. Moreover, the computational capacity embedded in the approach can be used to facilitate integrated management and maintenance optimization in a bridge system. A steel bridge girder is used to validate the proposed approach. The predicted results are compared with those evaluated by FORM method

    Quadruplex digital flight control system assessment

    Get PDF
    Described are the development and validation of a double fail-operational digital flight control system architecture for critical pitch axis functions. Architectural tradeoffs are assessed, system simulator modifications are described, and demonstration testing results are critiqued. Assessment tools and their application are also illustrated. Ultimately, the vital role of system simulation, tailored to digital mechanization attributes, is shown to be essential to validating the airworthiness of full-time critical functions such as augmented fly-by-wire systems for relaxed static stability airplanes

    Aided diagnosis of structural pathologies with an expert system

    Get PDF
    Sustainability and safety are social demands for long-life buildings. Suitable inspection and maintenance tasks on structural elements are needed for keeping buildings safely in service. Any malfunction that causes structural damage could be called pathology by analogy between structural engineering and medicine. Even the easiest evaluation tasks require expensive training periods that may be shortened with a suitable tool. This work presents an expert system (called Doctor House or DH) for diagnosing pathologies of structural elements in buildings. DH differs from other expert systems when it deals with uncertainty in a far easier but still useful way and it is capable of aiding during the initial survey 'in situ', when damage should be detected at a glance. DH is a powerful tool that represents complex knowledge gathered from bibliography and experts. Knowledge codification and uncertainty treatment are the main achievements presented. Finally, DH was tested and validated during real surveys.Peer ReviewedPostprint (author's final draft

    Pathfinder autonomous rendezvous and docking project

    Get PDF
    Capabilities are being developed and demonstrated to support manned and unmanned vehicle operations in lunar and planetary orbits. In this initial phase, primary emphasis is placed on definition of the system requirements for candidate Pathfinder mission applications and correlation of these system-level requirements with specific requirements. The FY-89 activities detailed are best characterized as foundation building. The majority of the efforts were dedicated to assessing the current state of the art, identifying desired elaborations and expansions to this level of development and charting a course that will realize the desired objectives in the future. Efforts are detailed across all work packages in developing those requirements and tools needed to test, refine, and validate basic autonomous rendezvous and docking elements
    • …
    corecore