1,929 research outputs found
Single-machine scheduling with stepwise tardiness costs and release times
We study a scheduling problem that belongs to the yard operations component of the railroad planning problems, namely the hump sequencing problem. The scheduling problem is characterized as a single-machine problem with stepwise tardiness cost objectives. This is a new scheduling criterion which is also relevant in the context of traditional machine scheduling problems. We produce complexity results that characterize some cases of the problem as pseudo-polynomially solvable. For the difficult-to-solve cases of the problem, we develop mathematical programming formulations, and propose heuristic algorithms. We test the formulations and heuristic algorithms on randomly generated single-machine scheduling problems and real-life datasets for the hump sequencing problem. Our experiments show promising results for both sets of problems
Preemptive Scheduling of Equal-Length Jobs to Maximize Weighted Throughput
We study the problem of computing a preemptive schedule of equal-length jobs
with given release times, deadlines and weights. Our goal is to maximize the
weighted throughput, which is the total weight of completed jobs. In Graham's
notation this problem is described as (1 | r_j;p_j=p;pmtn | sum w_j U_j). We
provide an O(n^4)-time algorithm for this problem, improving the previous bound
of O(n^{10}) by Baptiste.Comment: gained one author and lost one degree in the complexit
Pre-emptive resource-constrained multimode project scheduling using genetic algorithm: a dynamic forward approach
Purpose: The issue resource over-allocating is a big concern for project engineers in the process
of scheduling project activities. Resource over-allocating drawback is frequently seen after
scheduling of a project in practice which causes a schedule to be useless. Modifying an
over-allocated schedule is very complicated and needs a lot of efforts and time. In this paper, a
new and fast tracking method is proposed to schedule large scale projects which can help project
engineers to schedule the project rapidly and with more confidence.
Design/methodology/approach: In this article, a forward approach for maximizing net
present value (NPV) in multi-mode resource constrained project scheduling problem while
assuming discounted positive cash flows (MRCPSP-DCF) is proposed. The progress payment
method is used and all resources are considered as pre-emptible. The proposed approach
maximizes NPV using unscheduled resources through resource calendar in forward mode. For
this purpose, a Genetic Algorithm is applied to solve.
Findings: The findings show that the proposed method is an effective way to maximize NPV in
MRCPSP-DCF problems while activity splitting is allowed. The proposed algorithm is very fast
and can schedule experimental cases with 1000 variables and 100 resources in few seconds. The
results are then compared with branch and bound method and simulated annealing algorithm and
it is found the proposed genetic algorithm can provide results with better quality. Then algorithm
is then applied for scheduling a hospital in practice.
Originality/value: The method can be used alone or as a macro in Microsoft Office Project®
Software to schedule MRCPSP-DCF problems or to modify resource over-allocated activities
after scheduling a project. This can help project engineers to schedule project activities rapidly
with more accuracy in practice.Peer Reviewe
Stochastic scheduling on unrelated machines
Two important characteristics encountered in many real-world scheduling problems are heterogeneous machines/processors and a certain degree of uncertainty about the actual sizes of jobs. The first characteristic entails machine dependent processing times of jobs and is captured by the classical unrelated machine scheduling model.The second characteristic is adequately addressed by stochastic processing times of jobs as they are studied in classical stochastic scheduling models. While there is an extensive but separate literature for the two scheduling models, we study for the first time a combined model that takes both characteristics into account simultaneously. Here, the processing time of job on machine is governed by random variable , and its actual realization becomes known only upon job completion. With being the given weight of job , we study the classical objective to minimize the expected total weighted completion time , where is the completion time of job . By means of a novel time-indexed linear programming relaxation, we compute in polynomial time a scheduling policy with performance guarantee . Here, is arbitrarily small, and is an upper bound on the squared coefficient of variation of the processing times. We show that the dependence of the performance guarantee on is tight, as we obtain a lower bound for the type of policies that we use. When jobs also have individual release dates , our bound is . Via , currently best known bounds for deterministic scheduling are contained as a special case
Energy Efficient Scheduling and Routing via Randomized Rounding
We propose a unifying framework based on configuration linear programs and
randomized rounding, for different energy optimization problems in the dynamic
speed-scaling setting. We apply our framework to various scheduling and routing
problems in heterogeneous computing and networking environments. We first
consider the energy minimization problem of scheduling a set of jobs on a set
of parallel speed scalable processors in a fully heterogeneous setting. For
both the preemptive-non-migratory and the preemptive-migratory variants, our
approach allows us to obtain solutions of almost the same quality as for the
homogeneous environment. By exploiting the result for the
preemptive-non-migratory variant, we are able to improve the best known
approximation ratio for the single processor non-preemptive problem.
Furthermore, we show that our approach allows to obtain a constant-factor
approximation algorithm for the power-aware preemptive job shop scheduling
problem. Finally, we consider the min-power routing problem where we are given
a network modeled by an undirected graph and a set of uniform demands that have
to be routed on integral routes from their sources to their destinations so
that the energy consumption is minimized. We improve the best known
approximation ratio for this problem.Comment: 27 page
Macroservers: An Execution Model for DRAM Processor-In-Memory Arrays
The emergence of semiconductor fabrication technology allowing a tight coupling between high-density DRAM and CMOS logic on the same chip has led to the important new class of Processor-In-Memory (PIM) architectures. Newer developments provide powerful parallel processing capabilities on the chip, exploiting the facility to load wide words in single memory accesses and supporting complex address manipulations in the memory. Furthermore, large arrays of PIMs can be arranged into a massively parallel architecture. In this report, we describe an object-based programming model based on the notion of a macroserver. Macroservers encapsulate a set of variables and methods; threads, spawned by the activation of methods, operate asynchronously on the variables' state space. Data distributions provide a mechanism for mapping large data structures across the memory region of a macroserver, while work distributions allow explicit control of bindings between threads and data. Both data and work distributuions are first-class objects of the model, supporting the dynamic management of data and threads in memory. This offers the flexibility required for fully exploiting the processing power and memory bandwidth of a PIM array, in particular for irregular and adaptive applications. Thread synchronization is based on atomic methods, condition variables, and futures. A special type of lightweight macroserver allows the formulation of flexible scheduling strategies for the access to resources, using a monitor-like mechanism
How Unsplittable-Flow-Covering helps Scheduling with Job-Dependent Cost Functions
Generalizing many well-known and natural scheduling problems, scheduling with
job-specific cost functions has gained a lot of attention recently. In this
setting, each job incurs a cost depending on its completion time, given by a
private cost function, and one seeks to schedule the jobs to minimize the total
sum of these costs. The framework captures many important scheduling objectives
such as weighted flow time or weighted tardiness. Still, the general case as
well as the mentioned special cases are far from being very well understood
yet, even for only one machine. Aiming for better general understanding of this
problem, in this paper we focus on the case of uniform job release dates on one
machine for which the state of the art is a 4-approximation algorithm. This is
true even for a special case that is equivalent to the covering version of the
well-studied and prominent unsplittable flow on a path problem, which is
interesting in its own right. For that covering problem, we present a
quasi-polynomial time -approximation algorithm that yields an
-approximation for the above scheduling problem. Moreover, for
the latter we devise the best possible resource augmentation result regarding
speed: a polynomial time algorithm which computes a solution with \emph{optimal
}cost at speedup. Finally, we present an elegant QPTAS for the
special case where the cost functions of the jobs fall into at most
many classes. This algorithm allows the jobs even to have up to many
distinct release dates.Comment: 2 pages, 1 figur
- …