93,854 research outputs found

    Sustainable exhibit design: guidelines for designers of small scale interactive and travelling exhibits

    Get PDF
    This study was commissioned as part of Lincolnshire County Council’s FLOWS ‘2B’ Information and Symbols Project and UK match funding for this particular FLOWS Project has been provided by East Midlands Development Agency. The aim of FLOWS is to improve the sustainability of development in flood risk areas through development of ‘good practice’, by improved integration of flood risk information into decision-support systems for spatial planning and water management. FLOWS involves over 40 individual projects which are based in four Work Packages. Lincolnshire County Council is jointly leading Work Package 3 (Spatial Planning) and is also leading on Projects in Work Package 2 (Public Perception/Dissemination). This study has been produced as part of Lincolnshire County Council’s ‘FLOWS 2B Information and Symbols Project’ and in the wider context, is focussing on raising public awareness of flooding and flood risk by exploring innovative methods of disseminating information on the subject of flood risk to the public. This project involves the production of interactive exhibits aimed at raising the awareness of flood risk in Lincolnshire and is a partnership between Lincolnshire County Council and the School of Architecture at the University of Lincoln. A study focussing on creating sustainable exhibitions has been undertaken via the University of Lincoln that will directly inform the FLOWS exhibits. As detailed in the project brief, this study on Sustainable Exhibit Design will investigate best practice in sustainable exhibit design and produce a report setting out guidelines for designers of small interactive and travelling exhibits, guidelines which are directly applicable to the proposed FLOWS exhibit. The report will form a contribution to exhibition design knowledge through wider distribution via the University of Lincoln and FLOWS websites and a conference presentation

    A Longitudinal Study of Identifying and Paying Down Architectural Debt

    Full text link
    Architectural debt is a form of technical debt that derives from the gap between the architectural design of the system as it "should be" compared to "as it is". We measured architecture debt in two ways: 1) in terms of system-wide coupling measures, and 2) in terms of the number and severity of architectural flaws. In recent work it was shown that the amount of architectural debt has a huge impact on software maintainability and evolution. Consequently, detecting and reducing the debt is expected to make software more amenable to change. This paper reports on a longitudinal study of a healthcare communications product created by Brightsquid Secure Communications Corp. This start-up company is facing the typical trade-off problem of desiring responsiveness to change requests, but wanting to avoid the ever-increasing effort that the accumulation of quick-and-dirty changes eventually incurs. In the first stage of the study, we analyzed the status of the "before" system, which indicated the impacts of change requests. This initial study motivated a more in-depth analysis of architectural debt. The results of this analysis were used to motivate a comprehensive refactoring of the software system. The third phase of the study was a follow-on architectural debt analysis which quantified the improvements made. Using this quantitative evidence, augmented by qualitative evidence gathered from in-depth interviews with Brightsquid's architects, we present lessons learned about the costs and benefits of paying down architecture debt in practice.Comment: Submitted to ICSE-SEIP 201

    The building information modeling for the retrofitting of existing buildings. A case study in the University of Cagliari.

    Get PDF
    Italy's very consistent buildings stock has become the major field for real estate investments and for the related projects and actions. The urge of working on built environment is however facing some crucial issues. The first is the lack of documentation on the construction history and on the real constructive layout of existing buildings (in terms of components, installations, plants, etc.). The second is the poor activity in surveying their current status, with reference to use (energy behaviour, real consumptions, etc.) and maintenance (conservation status, previous maintenance works, compliance with current regulations, etc.). These obstacles cause a deep inefficiency in the planning, programming and controlling of requalification and/or refunctionalisation works. Starting from these assumptions, this paper shows the findings of a research shared by the Politecnico of Milan and the Department of Civil and Environmental Engineering and Architecture of the University of Cagliari. It is aimed at testing the use of building information modeling (BIM) to structure the necessary knowledge to evaluate intervention scenarios. The research is focused on the Mandolesi Pavilion of the University of Cagliari, designed by Enrico Mandolesi. It is a highly stimulating architectural object because it incorporates values that require a conservative approach, but at the same time, like most contemporary buildings, it was designed and built for innovation and not for “long duration”. The work has actually led to the realization of a BIM model of the case study. It represents the first prefiguration of an approach that develops from construction history and continues with advanced diagnostics on the statical and energy performances of the building. The model formalizes knowledge and information on a significant building, aimed at its management. It allows also the setting of intervention scenarios that can be evaluated with real-time simulations of cost, time and ROI

    Advanced Techniques for Assets Maintenance Management

    Get PDF
    16th IFAC Symposium on Information Control Problems in Manufacturing INCOM 2018 Bergamo, Italy, 11–13 June 2018. Edited by Marco Macchi, László Monostori, Roberto PintoThe aim of this paper is to remark the importance of new and advanced techniques supporting decision making in different business processes for maintenance and assets management, as well as the basic need of adopting a certain management framework with a clear processes map and the corresponding IT supporting systems. Framework processes and systems will be the key fundamental enablers for success and for continuous improvement. The suggested framework will help to define and improve business policies and work procedures for the assets operation and maintenance along their life cycle. The following sections present some achievements on this focus, proposing finally possible future lines for a research agenda within this field of assets management

    An Ontology for Product-Service Systems

    Get PDF
    Industries are transforming their business strategy from a product-centric to a more service-centric nature by bundling products and services into integrated solutions to enhance the relationship between their customers. Since Product- Service Systems design research is currently at a rudimentary stage, the development of a robust ontology for this area would be helpful. The advantages of a standardized ontology are that it could help researchers and practitioners to communicate their views without ambiguity and thus encourage the conception and implementation of useful methods and tools. In this paper, an initial structure of a PSS ontology from the design perspective is proposed and evaluated

    Exploring the use of new school buildings through post-occupancy evaluation and participatory action research

    Get PDF
    This paper presents the results of the development and testing of an integrated post-occupancy evaluation (POE) approach for teachers, staff, pupils and community members using newly constructed school buildings. It focusses on three cases of UK secondary schools, demonstrating how users can be inspired to engage with the problems of school design and energy use awareness. The cases provided new insights into the engagement of school teachers, staff and young people regarding issues of sustainability, management, functional performance and comfort. The integrative approach adopted in these cases provided a more holistic understanding of these buildings’ performance than could have been achieved by either observational or more traditional questionnaire-based methods. Moreover, the whole-school approach, involving children in POE, provided researchers with highly contextualised information about how a school is used, how to improve the quality of school experiences (both socially and educationally) and how the school community is contributing to the building's energy performance. These POE methods also provided unique opportunities for children to examine the social and cultural factors impeding the adoption of energy-conscious and sustainable behaviours
    corecore