969 research outputs found
A survey of scheduling problems with setup times or costs
Author name used in this publication: C. T. NgAuthor name used in this publication: T. C. E. Cheng2007-2008 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe
Deterministic Assembly Scheduling Problems: A Review and Classification of Concurrent-Type Scheduling Models and Solution Procedures
Many activities in industry and services require the scheduling of tasks that can be concurrently executed, the most clear example being perhaps the assembly of products carried out in manufacturing. Although numerous scientific contributions have been produced on this area over the last decades, the wide extension of the problems covered and the lack of a unified approach have lead to a situation where the state of the art in the field is unclear, which in turn hinders new research and makes translating the scientific knowledge into practice difficult.
In this paper we propose a unified notation for assembly scheduling models that encompass all concurrent-type scheduling problems. Using this notation, the existing contributions are reviewed and classified into a single framework, so a comprehensive, unified picture of the field is obtained. In addition, a number of conclusions regarding the state of the art in the topic are presented, as well as some opportunities for future research.Ministerio de Ciencia e Innovación español DPI2016-80750-
Recommended from our members
A Digital Twin Framework for Production Planning Optimization: Applications for Make-To-Order Manufacturers
In this dissertation, we develop a Digital Twin framework for manufacturing systems and apply it to various production planning and scheduling problems faced by Make-To-Order (MTO) firms. While this framework can be used to digitally represent a particular manufacturing environment with high fidelity, our focus is in using it to generate realistic settings to test production planning and scheduling algorithms in practice. These algorithms have traditionally been tested by either translating a practical situation into the necessary modeling constructs, without discussion of the assumptions and inaccuracies underlying this translation, or by generating random instances of the modeling constructs, without assessing the limitations in accurately representing production environments. The consequence has been a serious gap between theory advancement and industry practice. The major goal of this dissertation is to develop a framework that allows for practical testing, evaluation, and implementation of new approaches for seamless industry adoption. We develop this framework as a modular software package and emphasize the practicality and configurability of the framework, such that minimal modelling effort is required to apply the framework to a multitude of optimization problems and manufacturing systems. Throughout this dissertation, we emphasize the importance of the underlying scheduling problems which provide the basis for additional operational decision making. We focus on the computational evaluation and comparisons of various modeling choices within the developed frameworks, with the objective of identifying models which are both effective and computationally efficient. In Part 1 of this dissertation, we consider a class of Production Planning and Execution problems faced by job shop manufacturing systems. In Part 2 of this dissertation, we consider a class of scheduling problems faced by manufacturers whose production system is dominated by a single operation
A Survey of the Inventory Control-Detailed Scheduling Problem
10960179Includes bibliographical references (p. [217]-251) and index.Jonathan Golovin, editor
The dynamic, resource-constrained shortest path problem on an acyclic graph with application in column generation and literature review on sequence-dependent scheduling
This dissertation discusses two independent topics: a resource-constrained shortest-path problem
(RCSP) and a literature review on scheduling problems involving sequence-dependent setup
(SDS) times (costs).
RCSP is often used as a subproblem in column generation because it can be used to
solve many practical problems. This dissertation studies RCSP with multiple resource
constraints on an acyclic graph, because many applications involve this configuration, especially
in column genetation formulations. In particular, this research focuses on a dynamic RCSP
since, as a subproblem in column generation, objective function coefficients are updated using
new values of dual variables at each iteration. This dissertation proposes a pseudo-polynomial
solution method for solving the dynamic RCSP by exploiting the special structure of an acyclic
graph with the goal of effectively reoptimizing RCSP in the context of column generation. This
method uses a one-time âÂÂpreliminaryâ phase to transform RCSP into an unconstrained shortest
path problem (SPP) and then solves the resulting SPP after new values of dual variables are used
to update objective function coefficients (i.e., reduced costs) at each iteration. Network
reduction techniques are considered to remove some nodes and/or arcs permanently in the preliminary phase. Specified techniques are explored to reoptimize when only several
coefficients change and for dealing with forbidden and prescribed arcs in the context of a column
generation/branch-and-bound approach. As a benchmark method, a label-setting algorithm is
also proposed. Computational tests are designed to show the effectiveness of the proposed
algorithms and procedures.
This dissertation also gives a literature review related to the class of scheduling
problems that involve SDS times (costs), an important consideration in many practical
applications. It focuses on papers published within the last decade, addressing a variety of
machine configurations - single machine, parallel machine, flow shop, and job shop - reviewing
both optimizing and heuristic solution methods in each category. Since lot-sizing is so
intimately related to scheduling, this dissertation reviews work that integrates these issues in
relationship to each configuration. This dissertation provides a perspective of this line of
research, gives conclusions, and discusses fertile research opportunities posed by this class of
scheduling problems.
since, as a subproblem in column generation, objective function coefficients are updated using
new values of dual variables at each iteration. This dissertation proposes a pseudo-polynomial
solution method for solving the dynamic RCSP by exploiting the special structure of an acyclic
graph with the goal of effectively reoptimizing RCSP in the context of column generation. This
method uses a one-tim
Production Scheduling
Generally speaking, scheduling is the procedure of mapping a set of tasks or jobs (studied objects) to a set of target resources efficiently. More specifically, as a part of a larger planning and scheduling process, production scheduling is essential for the proper functioning of a manufacturing enterprise. This book presents ten chapters divided into five sections. Section 1 discusses rescheduling strategies, policies, and methods for production scheduling. Section 2 presents two chapters about flow shop scheduling. Section 3 describes heuristic and metaheuristic methods for treating the scheduling problem in an efficient manner. In addition, two test cases are presented in Section 4. The first uses simulation, while the second shows a real implementation of a production scheduling system. Finally, Section 5 presents some modeling strategies for building production scheduling systems. This book will be of interest to those working in the decision-making branches of production, in various operational research areas, as well as computational methods design. People from a diverse background ranging from academia and research to those working in industry, can take advantage of this volume
Minimizing the makespan in a flexible flowshop with sequence dependent setup times, uniform machines, and limited buffers
This research addresses the problem of minimizing the makespan in a flexible flowshop with sequence dependent setup times, uniform machines, and limited buffers. A mathematical model was developed to solve this problem. The problem is NP-Hard in the strong sense and only very small problems could be solved optimally. For exact methods, the computation times are long and not practical even when the problems are relatively small. Two construction heuristics were developed that could find solutions quickly. Also a simulated annealing heuristic was constructed that improved the solutions obtained from the construction heuristics. The combined heuristics could compute a good solution in a short amount of time. The heuristics were tested in three different environments: 3 stages, 4 stages, and 5 stages. To assess the quality of the solutions, a lower bound and two simple heuristics were generated for comparison purposes. The proposed heuristics showed steady improvement over the simple heuristics. When compared to the lower bounds, the heuristics performed well for the smaller environment, but the performance quality decreased as the number of stages increased. The combination of these heuristics defiantly shows promise for solving the problem
- …