11,155 research outputs found
Query Learning with Exponential Query Costs
In query learning, the goal is to identify an unknown object while minimizing
the number of "yes" or "no" questions (queries) posed about that object. A
well-studied algorithm for query learning is known as generalized binary search
(GBS). We show that GBS is a greedy algorithm to optimize the expected number
of queries needed to identify the unknown object. We also generalize GBS in two
ways. First, we consider the case where the cost of querying grows
exponentially in the number of queries and the goal is to minimize the expected
exponential cost. Then, we consider the case where the objects are partitioned
into groups, and the objective is to identify only the group to which the
object belongs. We derive algorithms to address these issues in a common,
information-theoretic framework. In particular, we present an exact formula for
the objective function in each case involving Shannon or Renyi entropy, and
develop a greedy algorithm for minimizing it. Our algorithms are demonstrated
on two applications of query learning, active learning and emergency response.Comment: 15 page
Recommended from our members
Experimental Methods in IIR: The Tension between Rigour and Ethics in Studies Involving Users with Dyslexia
Designing user studies in the interactive information retrieval (IIR) paradigm on people with impairments may sometimes require different methodological considerations than for other users. Consequently, there may be a tension between what the community regards as being a rigorous methodology against what researchers can do ethically with their users. This paper discusses issues to consider when designing IIR studies involving people with dyslexia, such as sampling, informed consent and data collection. The conclusion is that conducting user studies on participants with dyslexia requires special considerations at all stages of the experimental design. The purpose of this paper is to raise awareness and understanding in the research community about experimental methods involving users with dyslexia, and addresses researchers, as well as editors and reviewers. Several of the issues raised do not only apply to people with dyslexia, but have implications when researching other groups, for instance elderly people and users with learning, cognitive, sensory or motor impairments
NASA space station automation: AI-based technology review
Research and Development projects in automation for the Space Station are discussed. Artificial Intelligence (AI) based automation technologies are planned to enhance crew safety through reduced need for EVA, increase crew productivity through the reduction of routine operations, increase space station autonomy, and augment space station capability through the use of teleoperation and robotics. AI technology will also be developed for the servicing of satellites at the Space Station, system monitoring and diagnosis, space manufacturing, and the assembly of large space structures
Building information modelling (BIM) implementation and remote construction projects: issues, challenges, and critiques.
The construction industry has been facing a paradigm shift to (i) increase productivity, efficiency, infrastructure value; quality and sustainability (ii) reduce lifecycle costs, lead times and duplications via effective collaboration and communication of stakeholders in construction projects. This paradigm shift is becoming more critical with remote construction projects, which reveals unique and even more complicated challenging problems in relation to communication and management due to the remoteness of the construction sites. On the other hand, Building Informational Modelling (BIM) is offered by some as the panacea to addressing the interdisciplinary inefficiencies in construction projects. Although in many cases the adoption of BIM has numerous potential benefits, it also raises interesting challenges with regards to how BIM integrates the business processes of individual practices. This paper aims to show how BIM adoption for an architectural company helps to mitigate the management and communication problems in remote construction project. The paper adopts a case study methodology, which is a UK Knowledge Transfer Partnership (KTP) project of BIM adoption between the University of Salford, UK and John McCall Architects (JMA), in which the BIM use between the architectural company and the main contractor for a remote construction project is elaborated and justified. Research showed that the key management and communication problems such as poor quality of construction works, unavailability of materials, and ineffective planning and scheduling can largely be mitigated by adopting BIM at the design stage
- …