6,121 research outputs found

    On application of least-delay variation problem in ethernet networks using SDN concept

    Get PDF
    The goal of this paper is to present an application idea of SDN in Smart Grids, particularly, in the area of L2 multicast as defined by IEC 61850-9-2. Authors propose an Integer Linear Formulation (ILP) dealing with a Least-Delay-Variation multicast forwarding problem that has a potential to utilize Ethernet networks in a new way. The proposed ILP formulation is numerically evaluated on random graph topologies and results are compared to a shortest path tree approach that is traditionally a product of Spanning Tree Protocols. Results confirm the correctness of the ILP formulation and illustrate dependency of a solution quality on the selected graph models, especially, in a case of scale-free topologies

    Optimal Placement of Phasor Measurement Units for Power Systems Using Genetic Algorithm

    Get PDF
    Power grids require monitoring to operate with high efficiency while minimizing the chances of having a failure. However, current monitoring scheme which consists of SCADA (Supervisory Control and Data Acquisition), accompanied with conventional meters distributed throughout the grid, is no longer sufficient to maintain an acceptable operation of the grid. This is evident from the multiple failures and blackouts that happened and are still happening in grids worldwide. This issue became more severe due to systems being operated near their limits (to reduce costs and due to the increase in electricity demands), as well as, the addition of renewable energy sources, which usually have abrupt changes. Smart grids were introduced as a solution to this issue by the inclusion of Wide Area Monitoring System (WAMS), which is mainly based on Phasor Measurement Units (PMU), which are measurement devices that provides synchronized time stamped measurements with high sending rate which significantly improves the monitoring of the grid. However, PMUs are relatively expensive (considering both direct and indirect costs incurred). Thus, it is desired to know the minimum number of PMUs required for achieving certain monitoring criteria. Thus, Optimal PMU Placement (OPP) formulates an optimization problem to solve this issue. In the literature of OPP, multiple objectives and constraints are considered, based on desired criteria. In this thesis, a review of OPP is made, followed by the application of selected algorithms (Integer Linear Programming and Genetic Algorithm) on various test systems as a verification and then applying it to Qatar Grid, to compare between different considerations as well as gain insight about the possible PMU placements for Qatar Grid. The contribution of this thesis is introducing a modified fitness function for the Genetic Algorithm that provides more diverse results than previous papers, while incorporating for various considerations like Zero Injection Buses, Conventional Measurements and current branch limit. It also analyzes the results of current branch limit and provides new plots describing their effects

    Review on distribution network optimization under uncertainty

    Get PDF
    With the increase of renewable energy in electricity generation and increased engagement from demand sides, distribution network planning and operation face great challenges in the provision of stable, secure and dedicated service under a high level of uncertainty in network behaviors. Distribution network planning and operation, at the same time, also benefit from the changes of current and future distribution networks in terms of the availability of increased resources, diversity, smartness, controllability and flexibility of the distribution networks. This paper reviews the critical optimization problems faced by distribution planning and operation, including how to cope with these changes, how to integrate an optimization process in a problem-solving framework to efficiently search for optimal strategy and how to optimize sources and flexibilities properly in order to achieve cost-effective operation and provide quality of services as required, among other factors. This paper also discusses the approaches to reduce the heavy computation load when solving large-scale network optimization problems, for instance by integrating the prior knowledge of network configuration in optimization search space. A number of optimization techniques have been reviewed and discussed in the paper. This paper also discusses the changes, challenges and opportunities in future distribution networks, analyzes the possible problems that will be faced by future network planning and operations and discusses the potential strategies to solve these optimization problems

    Precision Enhancement of Distribution System State Estimation via Tri-Objective Micro Phasor Measurement Unit Deployment

    Full text link
    A tri-objective optimal Micro Phasor Measurement Units ({\mu}-PMUs) Placement method is presented, with a focus on minimizing the following three parameters: i) the total number of {\mu}-PMU channels, (ii) the maximum state estimation uncertainty, and (iii) the sensitivity of state estimation to line parameter tolerances. The suggested formulation takes single-line and {\mu}-PMU failures into consideration while guaranteeing the complete observability of the system in the presence and absence of contingencies. It also takes into account the impact of zero injection nodes and the quantity of {\mu}-PMU channels carried out at every node. The suggested placement issue is addressed using a customized version of the nondominated sorting genetic algorithm II (NSGA-II). According to the results achieved utilizing three test systems of varying sizes, {\mu}-PMU channels beyond predetermined thresholds only result in higher costs and negligible further decreases in state estimation uncertainty and sensitivity to line parameter tolerances. Additionally, we may omit to instrument between 30 and 40% of buses if {\mu}-PMUs with only two three-phase channels are utilized, with only a modest negative effect on state estimate performance even in the event of contingencies

    Power quality and electromagnetic compatibility: special report, session 2

    Get PDF
    The scope of Session 2 (S2) has been defined as follows by the Session Advisory Group and the Technical Committee: Power Quality (PQ), with the more general concept of electromagnetic compatibility (EMC) and with some related safety problems in electricity distribution systems. Special focus is put on voltage continuity (supply reliability, problem of outages) and voltage quality (voltage level, flicker, unbalance, harmonics). This session will also look at electromagnetic compatibility (mains frequency to 150 kHz), electromagnetic interferences and electric and magnetic fields issues. Also addressed in this session are electrical safety and immunity concerns (lightning issues, step, touch and transferred voltages). The aim of this special report is to present a synthesis of the present concerns in PQ&EMC, based on all selected papers of session 2 and related papers from other sessions, (152 papers in total). The report is divided in the following 4 blocks: Block 1: Electric and Magnetic Fields, EMC, Earthing systems Block 2: Harmonics Block 3: Voltage Variation Block 4: Power Quality Monitoring Two Round Tables will be organised: - Power quality and EMC in the Future Grid (CIGRE/CIRED WG C4.24, RT 13) - Reliability Benchmarking - why we should do it? What should be done in future? (RT 15

    Generalized optimal placement of PMUs considering power system observability, communication infrastructure, and quality of service requirements

    Get PDF
    This paper presents a generalized optimal placement of Phasor Measurement Units (PMUs) considering power system observability, reliability, Communication Infrastructure (CI), and latency time associated with this CI. Moreover, the economic study for additional new data transmission paths is considered as well as the availability of predefined locations of some PMUs and the preexisting communication devices (CDs) in some buses. Two cases for the location of the Control Center Base Station (CCBS) are considered; predefined case and free selected case. The PMUs placement and their required communication network topology and channel capacity are co-optimized simultaneously. In this study, two different approaches are applied to optimize the objective function; the first approach is combined from Binary Particle Swarm Optimization-Gravitational Search Algorithm (BPSOGSA) and the Minimum Spanning Tree (MST) algorithm, while the second approach is based only on BPSOGSA. The feasibility of the proposed approaches are examined by applying it to IEEE 14-bus and IEEE 118-bus systems

    Incremental heuristic approach for meter placement in radial distribution systems

    Get PDF
    The evolution of modern power distribution systems into smart grids requires the development of dedicated state estimation (SE) algorithms for real-time identification of the overall system state variables. This paper proposes a strategy to evaluate the minimum number and best position of power injection meters in radial distribution systems for SE purposes. Measurement points are identified with the aim of reducing uncertainty in branch power flow estimations. An incremental heuristic meter placement (IHMP) approach is proposed to select the locations and total number of power measurements. The meter placement procedure was implemented for a backward/forward load flow algorithm proposed by the authors, which allows the evaluation of medium-voltage power flows starting from low-voltage load measurements. This allows the reduction of the overall costs of measurement equipment and setup. The IHMP method was tested in the real 25-bus medium-voltage (MV) radial distribution network of the Island of Ustica (Mediterranean Sea). The proposed method is useful both for finding the best measurement configuration in a new distribution network and also for implementing an incremental enhancement of an existing measurement configuration, reaching a good tradeoff between instrumentation costs and measurement uncertainty
    corecore