11,998 research outputs found
Instruction fetch architectures and code layout optimizations
The design of higher performance processors has been following two major trends: increasing the pipeline depth to allow faster clock rates, and widening the pipeline to allow parallel execution of more instructions. Designing a higher performance processor implies balancing all the pipeline stages to ensure that overall performance is not dominated by any of them. This means that a faster execution engine also requires a faster fetch engine, to ensure that it is possible to read and decode enough instructions to keep the pipeline full and the functional units busy. This paper explores the challenges faced by the instruction fetch stage for a variety of processor designs, from early pipelined processors, to the more aggressive wide issue superscalars. We describe the different fetch engines proposed in the literature, the performance issues involved, and some of the proposed improvements. We also show how compiler techniques that optimize the layout of the code in memory can be used to improve the fetch performance of the different engines described Overall, we show how instruction fetch has evolved from fetching one instruction every few cycles, to fetching one instruction per cycle, to fetching a full basic block per cycle, to several basic blocks per cycle: the evolution of the mechanism surrounding the instruction cache, and the different compiler optimizations used to better employ these mechanisms.Peer ReviewedPostprint (published version
GDP : using dataflow properties to accurately estimate interference-free performance at runtime
Multi-core memory systems commonly share resources between processors. Resource sharing improves utilization at the cost of increased inter-application interference which may lead to priority inversion, missed deadlines and unpredictable interactive performance. A key component to effectively manage multi-core resources is performance accounting which aims to accurately estimate interference-free application performance. Previously proposed accounting systems are either invasive or transparent. Invasive accounting systems can be accurate, but slow down latency-sensitive processes. Transparent accounting systems do not affect performance, but tend to provide less accurate performance estimates.
We propose a novel class of performance accounting systems that achieve both performance-transparency and superior accuracy. We call the approach dataflow accounting, and the key idea is to track dynamic dataflow properties and use these to estimate interference-free performance. Our main contribution is Graph-based Dynamic Performance (GDP) accounting. GDP dynamically builds a dataflow graph of load requests and periods where the processor commits instructions. This graph concisely represents the relationship between memory loads and forward progress in program execution. More specifically, GDP estimates interference-free stall cycles by multiplying the critical path length of the dataflow graph with the estimated interference-free memory latency. GDP is very accurate with mean IPC estimation errors of 3.4% and 9.8% for our 4- and 8-core processors, respectively. When GDP is used in a cache partitioning policy, we observe average system throughput improvements of 11.9% and 20.8% compared to partitioning using the state-of-the-art Application Slowdown Model
Improving processor efficiency by exploiting common-case behaviors of memory instructions
Processor efficiency can be described with the help of a number of  desirable
effects or metrics, for example, performance, power, area, design
complexity and access latency.
These metrics serve as valuable tools used in designing new processors
and they also act as  effective standards for comparing current processors.
Various factors impact the efficiency of modern out-of-order processors
and one important factor is the manner in which instructions are processed
through the processor pipeline.
In this dissertation research, we study the impact of load and store
instructions
(collectively known as memory instructions) on processor efficiency,
 and show how to improve efficiency by exploiting common-case or
 predictable patterns in the behavior of memory instructions.
The memory behavior patterns that we focus on in our research are
the predictability of memory dependences, the predictability in
data forwarding patterns,
 predictability in instruction criticality and conservativeness
in resource allocation and
deallocation policies.
We first design a scalable  and high-performance memory dependence
predictor and then apply
accurate memory dependence prediction to improve the efficiency of
the fetch engine of a simultaneous multi-threaded processor.
We then use predictable data forwarding patterns to eliminate power-hungry
 hardware in the processor with no loss in performance.  We then move to
 studying instruction criticality to improve
 processor efficiency. We study the behavior of critical load instructions
 and propose applications that can be optimized using  predictable,
load-criticality
 information. Finally, we explore conventional techniques for
allocation and deallocation
 of critical structures that process memory instructions and propose new
techniques to optimize the same. Â Our new designs have the potential to reduce
 the power and the area required by processors significantly without losing
 performance, which lead to efficient designs of processors.Ph.D.Committee Chair: Loh, Gabriel H.; Committee Member: Clark, Nathan; Committee Member: Jaleel, Aamer; Committee Member: Kim, Hyesoon; Committee Member: Lee, Hsien-Hsin S.; Committee Member: Prvulovic, Milo
Internet of Things-aided Smart Grid: Technologies, Architectures, Applications, Prototypes, and Future Research Directions
Traditional power grids are being transformed into Smart Grids (SGs) to
address the issues in existing power system due to uni-directional information
flow, energy wastage, growing energy demand, reliability and security. SGs
offer bi-directional energy flow between service providers and consumers,
involving power generation, transmission, distribution and utilization systems.
SGs employ various devices for the monitoring, analysis and control of the
grid, deployed at power plants, distribution centers and in consumers' premises
in a very large number. Hence, an SG requires connectivity, automation and the
tracking of such devices. This is achieved with the help of Internet of Things
(IoT). IoT helps SG systems to support various network functions throughout the
generation, transmission, distribution and consumption of energy by
incorporating IoT devices (such as sensors, actuators and smart meters), as
well as by providing the connectivity, automation and tracking for such
devices. In this paper, we provide a comprehensive survey on IoT-aided SG
systems, which includes the existing architectures, applications and prototypes
of IoT-aided SG systems. This survey also highlights the open issues,
challenges and future research directions for IoT-aided SG systems
Predictable migration and communication in the Quest-V multikernal
Quest-V is a system we have been developing from the ground up, with objectives focusing on safety, predictability and efficiency. It is designed to work on emerging multicore processors with hardware virtualization support. Quest-V is implemented as a ``distributed system on a chip'' and comprises multiple sandbox kernels. Sandbox kernels are isolated from one another in separate regions of physical memory, having access to a subset of processing cores and I/O devices. This partitioning prevents system failures in one sandbox affecting the operation of other sandboxes. Shared memory channels managed by system monitors enable inter-sandbox communication.
The distributed nature of Quest-V means each sandbox has a separate physical clock, with all event timings being managed by per-core local timers. Each sandbox is responsible for its own scheduling and I/O management, without requiring intervention of a hypervisor. In this paper, we formulate bounds on inter-sandbox communication in the absence of a global scheduler or global system clock. We also describe how address space migration between sandboxes can be guaranteed without violating service constraints. Experimental results on a working system show the conditions under which Quest-V performs real-time communication and migration.National Science Foundation (1117025
- …