1,102 research outputs found

    Project scheduling under undertainty – survey and research potentials.

    Get PDF
    The vast majority of the research efforts in project scheduling assume complete information about the scheduling problem to be solved and a static deterministic environment within which the pre-computed baseline schedule will be executed. However, in the real world, project activities are subject to considerable uncertainty, that is gradually resolved during project execution. In this survey we review the fundamental approaches for scheduling under uncertainty: reactive scheduling, stochastic project scheduling, stochastic GERT network scheduling, fuzzy project scheduling, robust (proactive) scheduling and sensitivity analysis. We discuss the potentials of these approaches for scheduling projects under uncertainty.Management; Project management; Robustness; Scheduling; Stability;

    Overview on: sequencing in mixed model flowshop production line with static and dynamic context

    Get PDF
    In the present work a literature overview was given on solution techniques considering basic as well as more advanced and consequently more complex arrangements of mixed model flowshops. We first analyzed the occurrence of setup time/cost; existing solution techniques are mainly focused on permutation sequences. Thereafter we discussed objectives resulting in the introduction of variety of methods allowing resequencing of jobs within the line. The possibility of resequencing within the line ranges from 1) offline or intermittent buffers, 2) parallel stations, namely flexible, hybrid or compound flowshops, 3) merging and splitting of parallel lines, 4) re-entrant flowshops, to 5) change job attributes without physically interchanging the position. In continuation the differences in the consideration of static and dynamic demand was studied. Also intermittent setups are possible, depending on the horizon and including the possibility of resequencing, four problem cases were highlighted: static, semi dynamic, nearly dynamic and dynamic case. Finally a general overview was given on existing solution methods, including exact and approximation methods. The approximation methods are furthermore divided in two cases, know as heuristics and methaheuristic

    A simulation modelling approach to improve the OEE of a bottling line

    Get PDF
    This dissertation presents a simulation approach to improve the efficiency performance, in terms of OEE, of an automated bottling line. A simulation model of the system is created by means of the software AnyLogic; it is used to solve the case. The problems faced are a sequencing problem related to the order the formats of bottles are processed and the buffer sizing problem. Either theoretical aspects on OEE, job sequencing and simulation and practical aspects are presented

    A hybrid genetic approach to solve real make-to-order job shop scheduling problems

    Get PDF
    Tese (doutorado) - Universidade Federal de Santa Catarina, Centro TecnologicoProcedimentos de busca local (ex. busca tabu) e algoritmos genéticos têm apresentado excelentes resultados em problemas clássicos de programação da produção em ambientes job shop. No entanto, estas abordagens apresentam pobres habilidades de modelamento e poucas aplicações com restrições de ambientes reais de produção têm sido publicadas. Além disto, os espaços de busca considerados nestas aplicações são nomlalmente incompletos e as restrições reais são poucas e dependentes do problema em questão. Este trabalho apresenta uma abordagem genética híbrida para resolver problemas de programação em ambientes job shop com grande número de restrições reais, tais como produtos com vários níveis de submontagem, planos de processamento altemativos para componentes e recursos alternativos para operações, exigência de vários recursos para executar uma operação (ex., máquina, ferramentas, operadores), calendários para todos os recursos, sobreposição de operações, restrições de disponibilidade de matéria-prima e componentes comprados de terceiros, e tempo de setup dependente da sequência de operações. A abordagem também considera funções de avaliação multiobjetivas. O sistema usa algoritmos modificados de geração de programação, que incorporam várias heurísticas de apoio à decisão, para obter um conjunto de soluções iniciais. Cada solução inicial é melhorada por um algoritmo de subida de encosta. Então, um algoritmo genético híbrido com procedimentos de busca local é aplicado ao conjunto inicial de soluções localmente ótimas. Ao utilizar técnicas de programação de alta perfomlance (heurísticas construtivas, procedimentos de busca local e algoritmos genéticos) em problemas reais de programação da produção, este trabalho reduziu o abismo existente entre a teoria e a prática da programação da produção

    Algorithms for Scheduling Problems

    Get PDF
    This edited book presents new results in the area of algorithm development for different types of scheduling problems. In eleven chapters, algorithms for single machine problems, flow-shop and job-shop scheduling problems (including their hybrid (flexible) variants), the resource-constrained project scheduling problem, scheduling problems in complex manufacturing systems and supply chains, and workflow scheduling problems are given. The chapters address such subjects as insertion heuristics for energy-efficient scheduling, the re-scheduling of train traffic in real time, control algorithms for short-term scheduling in manufacturing systems, bi-objective optimization of tortilla production, scheduling problems with uncertain (interval) processing times, workflow scheduling for digital signal processor (DSP) clusters, and many more

    Two-Stage Vehicle Routing Problems with Profits and Buffers: Analysis and Metaheuristic Optimization Algorithms

    Get PDF
    This thesis considers the Two-Stage Vehicle Routing Problem (VRP) with Profits and Buffers, which generalizes various optimization problems that are relevant for practical applications, such as the Two-Machine Flow Shop with Buffers and the Orienteering Problem. Two optimization problems are considered for the Two-Stage VRP with Profits and Buffers, namely the minimization of total time while respecting a profit constraint and the maximization of total profit under a budget constraint. The former generalizes the makespan minimization problem for the Two-Machine Flow Shop with Buffers, whereas the latter is comparable to the problem of maximizing score in the Orienteering Problem. For the three problems, a theoretical analysis is performed regarding computational complexity, existence of optimal permutation schedules (where all vehicles traverse the same nodes in the same order) and potential gaps in attainable solution quality between permutation schedules and non-permutation schedules. The obtained theoretical results are visualized in a table that gives an overview of various subproblems belonging to the Two-Stage VRP with Profits and Buffers, their theoretical properties and how they are connected. For the Two-Machine Flow Shop with Buffers and the Orienteering Problem, two metaheuristics 2BF-ILS and VNSOP are presented that obtain favorable results in computational experiments when compared to other state-of-the-art algorithms. For the Two-Stage VRP with Profits and Buffers, an algorithmic framework for Iterative Search Algorithms with Variable Neighborhoods (ISAVaN) is proposed that generalizes aspects from 2BF-ILS as well as VNSOP. Various algorithms derived from that framework are evaluated in an experimental study. The evaluation methodology used for all computational experiments in this thesis takes the performance during the run time into account and demonstrates that algorithms for structurally different problems, which are encompassed by the Two-Stage VRP with Profits and Buffers, can be evaluated with similar methods. The results show that the most suitable choice for the components in these algorithms is dependent on the properties of the problem and the considered evaluation criteria. However, a number of similarities to algorithms that perform well for the Two-Machine Flow Shop with Buffers and the Orienteering Problem can be identified. The framework unifies these characteristics, providing a spectrum of algorithms that can be adapted to the specifics of the considered Vehicle Routing Problem.:1 Introduction 2 Background 2.1 Problem Motivation 2.2 Formal Definition of the Two-Stage VRP with Profits and Buffers 2.3 Review of Literature on Related Vehicle Routing Problems 2.3.1 Two-Stage Vehicle Routing Problems 2.3.2 Vehicle Routing Problems with Profits 2.3.3 Vehicle Routing Problems with Capacity- or Resource-based Restrictions 2.4 Preliminary Remarks on Subsequent Chapters 3 The Two-Machine Flow Shop Problem with Buffers 3.1 Review of Literature on Flow Shop Problems with Buffers 3.1.1 Algorithms and Metaheuristics for Flow Shops with Buffers 3.1.2 Two-Machine Flow Shop Problems with Buffers 3.1.3 Blocking Flow Shops 3.1.4 Non-Permutation Schedules 3.1.5 Other Extensions and Variations of Flow Shop Problems 3.2 Theoretical Properties 3.2.1 Computational Complexity 3.2.2 The Existence of Optimal Permutation Schedules 3.2.3 The Gap Between Permutation Schedules an Non-Permutation 3.3 A Modification of the NEH Heuristic 3.4 An Iterated Local Search for the Two-Machine Flow Shop Problem with Buffers 3.5 Computational Evaluation 3.5.1 Algorithms for Comparison 3.5.2 Generation of Problem Instances 3.5.3 Parameter Values 3.5.4 Comparison of 2BF-ILS with other Metaheuristics 3.5.5 Comparison of 2BF-OPT with NEH 3.6 Summary 4 The Orienteering Problem 4.1 Review of Literature on Orienteering Problems 4.2 Theoretical Properties 4.3 A Variable Neighborhood Search for the Orienteering Problem 4.4 Computational Evaluation 4.4.1 Measurement of Algorithm Performance 4.4.2 Choice of Algorithms for Comparison 4.4.3 Problem Instances 4.4.4 Parameter Values 4.4.5 Experimental Setup 4.4.6 Comparison of VNSOP with other Metaheuristics 4.5 Summary 5 The Two-Stage Vehicle Routing Problem with Profits and Buffers 5.1 Theoretical Properties of the Two-Stage VRP with Profits and Buffers 5.1.1 Computational Complexity of the General Problem 5.1.2 Existence of Permutation Schedules in the Set of Optimal Solutions 5.1.3 The Gap Between Permutation Schedules an Non-Permutation Schedules 5.1.4 Remarks on Restricted Cases 5.1.5 Overview of Theoretical Results 5.2 A Metaheuristic Framework for the Two-Stage VRP with Profits and Buffers 5.3 Experimental Results 5.3.1 Problem Instances 5.3.2 Experimental Results for O_{max R, Cmax≤B} 5.3.3 Experimental Results for O_{min Cmax, R≥Q} 5.4 Summary Bibliography List of Figures List of Tables List of Algorithm

    Two-machine flow shop with dynamic storage space

    Full text link
    © 2020, The Author(s). The publications on two-machine flow shop scheduling problems with job dependent storage requirements, where a job seizes a portion of the storage space for the entire duration of its processing, were motivated by various applications ranging from supply chains of mineral resources to multimedia systems. In contrast to the previous publications that assumed that the availability of the storage space remains unchanged, this paper is concerned with a more general case when the availability is a function of time. It strengthens the previously published result concerning the existence of an optimal permutation schedule, shows that the variable storage space availability leads to the NP-hardness in the strong sense even for unit processing times, and presents a polynomial-time approximation scheme together with several heuristic algorithms. The heuristics are evaluated by means of computational experiments

    On Just-In-Time Production Leveling

    Get PDF
    corecore