57,934 research outputs found

    Risk assessment of blasting operations in open pit mines using FAHP method

    Get PDF
    Purpose. In the mining blasting operation, fragmentation is the most important output. Fly rock, ground vibration, air blast, and environmental effects are detrimental effects of blasting operations. Identifying and ranking the risk of blasting operations is considered as the most important stage in project management. Methods. In this research, the problem of identifying and ranking the factors constituting the risk in blasting operations is considered with the methodology of the Fuzzy Analytical Hierarchy Process (FAHP). Criteria and sub-criteria have been determined based on historical research studies, field studies, and expert opinions for designing a hierarchical process. Findings. Based on FAHP scores, non-control of the sub-criterion of health and safety (C3), blast operation results (C18) and knowledge, and skill and staffing (C2) with a score of 0.377, 0.334, and 0.294 respectively are the most effective sub-criterion for the creation of blasting operations risk. According to the score, the sub-criterion C18 is the most effective sub-criterion in providing the blasting operations risk. Effects and results of blasting operations (D8), with a score of 0.334 as the most effective criterion, and natural hazards (D10), with a score of 0.015, were the last priorities in the factors causing blasting operations risk. Originality. Regarding the risk rating of blasting operations, the control of the sub-criteria C3, C18, and C2, and the D8 criterion, is of particular importance in reducing the risk of blasting operations and improving project management. Practical implications. The evaluation of human resource performance and increase in the level of knowledge and skills and occupational safety and control of all outputs of blasting operations is necessary. Therefore, selecting the most important project risks and taking actions to remove them is essential for risk management.Мета. Визначення ризиків проведення вибухових робіт та їх оцінка на основі використанням нечіткого методу аналізу ієрархій (НМАІ) для покращення управління якістю проектів. Методика. В рамках даного дослідження, проблеми визначення та оцінки ризиків вибухових робіт розглядалися із застосуванням нечіткого методу аналізу ієрархій. На базі аналізу історичних даних і польового дослідження з урахуванням експертних оцінок були визначені критерії та підкритерії для побудови ієрархій. Результати. За результатами НМАІ, неконтролюючий підкритерій здоров’я та безпеки (С3), підкритерій результатів вибухових робіт (С18), знань, умінь і кадрів (С2) зі значеннями 0.377, 0.334 і 0.294 відповідно найбільш ефективні в появі ризику проведення вибухових робіт. Підкритерій С18 чинить найбільший вплив на ризик проведення вибухових робіт. Критерій результатів і наслідків вибухових робіт (D8) з найефективнішим значенням 0.334 та критерій природних катастроф (D10) зі значенням 0.015 є останніми пріоритетами серед чинників, які визначають ризик проведення вибухових робіт. Наукова новизна. Отримав доповнення та подальший розвиток науково-методичний підхід до визначення ризиків при проведенні вибухових робіт, заснований на їх ранжуванні з використанням системи виявлених критеріїв і підкритеріїв методом НМАІ. Практична значимість. Для успішного керування проектом важливо визначати найсерйозніші ризики проекту й вжити заходів щодо їх усунення. Відносно ранжирування ризиків проведення вибухових робіт управління підкритеріями C3, C18 і C2, а також критерієм D8, особливо важливо для зниження цих ризиків та покращення якості управління проектом.Цель. Определение рисков проведения взрывных работ и их оценка на основе использования нечеткого метода анализа иерархий (НМАИ) для улучшения управления качеством проектов. Методика. В рамках данного исследования, проблемы определения и оценки рисков взрывных работ рассматривались с применением нечеткого метода анализа иерархий. На базе анализа исторических данных и полевого исследования с учетом экспертных оценок были определены, критерии и подкритерии для построения иерархий. Результаты. По результатам НМАИ, неконтролирующий подкритерий здоровья и безопасности (С3), подкритерий результатов взрывных работ (С18), знаний, умений и кадров (С2) со значениями 0.377, 0.334 и 0.294 соответственно наиболее эффективны в появлении риска проведения взрывных работ. Подкритерий С18 оказывает самое большое влияние на риск проведения взрывных работ. Критерий результатов и последствий взрывных работ (D8) с самым эффективным значением 0.334 и критерий природных катастроф (D10) со значением 0.015 являются последними приоритетами среди факторов, которые определяют риск проведения взрывных работ. Научная новизна. Получил дополнение и дальнейшее развитие научно-методический подход к определению рисков при проведении взрывных работ, основанный на их ранжировании с использованием системы выявленных критериев и подкритериев методом НМАИ. Практическая значимость. Для успешного руководства проектом важно определять самые серьезные риски проекта и предпринять действия по их устранению. В отношении ранжирования рисков проведения взрывных работ управление подкритериями C3, C18 и C2, а также критерием D8, особенно важно для снижения этих рисков и улучшения руководства проектом.The authors would like to thank Mining Engineering Department, Islamic Azad University (South Tehran Branch) for supporting this research

    Multi-criteria decision making with linguistic labels: a comparison of two methodologies applied to energy planning

    Get PDF
    This paper compares two multi-criteria decision making (MCDM) approaches based on linguistic label assessment. The first approach consists of a modified fuzzy TOPSIS methodology introduced by Kaya and Kahraman in 2011. The second approach, introduced by Agell et al. in 2012, is based on qualitative reasoning techniques for ranking multi-attribute alternatives in group decision-making with linguistic labels. Both approaches are applied to a case of assessment and selection of the most suitable types of energy in a geographical area.Peer ReviewedPostprint (published version

    Constructing Fuzzy for Socio Economic Urban Growth Dynamic In Surabaya Based on GIS

    Get PDF
    Urban modeling is an important tool for efficient policy designing in a big city. Surabaya, a big city are now recognized as complex systems through which nonlinear and dynamic processes occur. The paper present a methodological framework for urban modeling from socio economic point of view, which suggested framework incorporates a set of fuzzy systems. In this case, the variable consist of manufacture, hospital, school and shopping centre. Combining with spatial analysis in GIS, the result is a dynamic model was shown to be capable of replicating the trends and characteristics of an urban environment, in this case the city of Surabaya

    Decision support model for the selection of asphalt wearing courses in highly trafficked roads

    Get PDF
    The suitable choice of the materials forming the wearing course of highly trafficked roads is a delicate task because of their direct interaction with vehicles. Furthermore, modern roads must be planned according to sustainable development goals, which is complex because some of these might be in conflict. Under this premise, this paper develops a multi-criteria decision support model based on the analytic hierarchy process and the technique for order of preference by similarity to ideal solution to facilitate the selection of wearing courses in European countries. Variables were modelled using either fuzzy logic or Monte Carlo methods, depending on their nature. The views of a panel of experts on the problem were collected and processed using the generalized reduced gradient algorithm and a distance-based aggregation approach. The results showed a clear preponderance by stone mastic asphalt over the remaining alternatives in different scenarios evaluated through sensitivity analysis. The research leading to these results was framed in the European FP7 Project DURABROADS (No. 605404).The research leading to these results has received funding from the European Union Seventh Framework Programme (FP7/2007–2013) under Grant Agreement No. 605404

    WHY FUZZY ANALYTIC HIERARCHY PROCESS APPROACH FOR TRANSPORT PROBLEMS?

    Get PDF
    The evaluation of transport projects has become increasingly complex. Different aspects have to be taken into account and the consequences of the problems are usually far reaching and the different policy alternatives are numerous and difficult to predict. Several pressure or action groups have also emerged causing an even more complex decision making process. The use of multi criteria analysis for the evaluation of transport projects has increased due to this increasing complexity of the problem situation. At the same time, the importance of stakeholders within this evaluation process should have been recognized. Researches on transport projects are generally carried out to provide information to policymakers that have to operate within restrictive parameters (political, economical, social, etc…). Researchers should therefore take greater account of the different priorities of stakeholders such as policymakers, private enterprises and households. These stakeholders should be incorporated explicitly in the evaluation process. The Analytic Hierarchy Process is one of the Fuzzy Multiple Criteria Decision Making methods. It can be applied in a very broad range of applications of decision problems. Logistics, urban planning, public politics, marketing, finance, education, economics are a part of this wide application area. In transport subjects it can be used for the evaluation of transport policy measures or decision making problems. Due to its wide range application area, it has been an exciting research subject for many different field researchers. The aim of this paper is to introduce AHP method and to offer how to benefit it for the preference of urban planners in transport problems. This paper is composed of two main parts. First part consists of the literature survey regarding with the AHP and its application areas. The advantage of methods had been mentioned. Second part focuses on a sample application of AHP technique. The study uses AHP technique to determine the selection criteria in the transhipment port selection decision-making process. Keywords: Analytic Hierarchy Process, Multi criteria analysis, Transshipment port selection.

    A framework for the selection of the right nuclear power plant

    Get PDF
    Civil nuclear reactors are used for the production of electrical energy. In the nuclear industry vendors propose several nuclear reactor designs with a size from 35–45 MWe up to 1600–1700 MWe. The choice of the right design is a multidimensional problem since a utility has to include not only financial factors as levelised cost of electricity (LCOE) and internal rate of return (IRR), but also the so called “external factors” like the required spinning reserve, the impact on local industry and the social acceptability. Therefore it is necessary to balance advantages and disadvantages of each design during the entire life cycle of the plant, usually 40–60 years. In the scientific literature there are several techniques for solving this multidimensional problem. Unfortunately it does not seem possible to apply these methodologies as they are, since the problem is too complex and it is difficult to provide consistent and trustworthy expert judgments. This paper fills the gap, proposing a two-step framework to choosing the best nuclear reactor at the pre-feasibility study phase. The paper shows in detail how to use the methodology, comparing the choice of a small-medium reactor (SMR) with a large reactor (LR), characterised, according to the International Atomic Energy Agency (2006), by an electrical output respectively lower and higher than 700 MWe
    corecore