111 research outputs found

    A survey of scheduling problems with setup times or costs

    Get PDF
    Author name used in this publication: C. T. NgAuthor name used in this publication: T. C. E. Cheng2007-2008 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe

    a hybrid metaheuristic approach for minimizing the total flow time in a flow shop sequence dependent group scheduling problem

    Get PDF
    Production processes in Cellular Manufacturing Systems (CMS) often involve groups of parts sharing the same technological requirements in terms of tooling and setup. The issue of scheduling such parts through a flow-shop production layout is known as the Flow-Shop Group Scheduling (FSGS) problem or, whether setup times are sequence-dependent, the Flow-Shop Sequence-Dependent Group Scheduling (FSDGS) problem. This paper addresses the FSDGS issue, proposing a hybrid metaheuristic procedure integrating features from Genetic Algorithms (GAs) and Biased Random Sampling (BRS) search techniques with the aim of minimizing the total flow time, i.e., the sum of completion times of all jobs. A well-known benchmark of test cases, entailing problems with two, three, and six machines, is employed for both tuning the relevant parameters of the developed procedure and assessing its performances against two metaheuristic algorithms recently presented by literature. The obtained results and a properly arranged ANOVA analysis highlight the superiority of the proposed approach in tackling the scheduling problem under investigation

    Studying the effect of server side constraints on the makespan of the no-wait flow shop problem with sequence dependent setup times.

    Get PDF
    Peer ReviewedThis paper deals with the problem of scheduling the no-wait flow-shop system with sequence-dependent set-up times and server side-constraints. No-wait constraints state that there should be no waiting time between consecutive operations of jobs. In addition, sequence-dependent set-up times are considered for each operation. This means that the set-up time of an operation on its respective machine is dependent on the previous operation on the same machine. Moreover, the problem consists of server side-constraints i.e. not all machines have a dedicated server to prepare them for an operation. In other words, several machines share a common server. The considered performance measure is makespan. This problem is proved to be strongly NP-Hard. To deal with the problem, two genetic algorithms are developed. In order to evaluate the performance of the developed frameworks, a large number of benchmark problems are selected and solved with different server limitation scenarios. Computational results confirm that both of the proposed algorithms are efficient and competitive. The developed algorithms are able to improve many of the best-known solutions of the test problems from the literature. Moreover, the effect of the server side-constraints on the makespan of the test problems is explained using the computational results

    Meta heuristic for Minimizing Makespan in a Flow-line Manufacturing Cell with Sequence Dependent Family Setup Times

    Get PDF
    This paper presents a new mathematical model for the problem of scheduling part families and jobs within each part family in a flow line manufacturing cell where the setup times for each family are sequence dependent and it is desired to minimize the maximum completion time of the last job on the last machine (makespan) while processing parts (jobs) in each family together. Gaining an optimal solution for this type of complex problem in large sizes in reasonable computational time using traditional approaches or optimization tools is extremely difficult. A meta-heuristic method based on Simulated Annealing (SA) is proposed to solve the presented model. Based on the computational analyses, the proposed algorithm was found efficient and effective at finding good quality solutions

    An estimation of distribution algorithm for lot-streaming flow shop problems with setup times

    Full text link
    Lot-streaming flow shops have important applications in different industries including textile, plastic, chemical, semiconductor and many others. This paper considers an n-job m-machine lot-streaming flow shop scheduling problem with sequence-dependent setup times under both the idling and noidling production cases. The objective is to minimize the maximum completion time or makespan. To solve this important practical problem, a novel estimation of distribution algorithm (EDA) is proposed with a job permutation based representation. In the proposed EDA, an efficient initialization scheme based on the NEH heuristic is presented to construct an initial population with a certain level of quality and diversity. An estimation of a probabilistic model is constructed to direct the algorithm search towards good solutions by taking into account both job permutation and similar blocks of jobs. A simple but effective local search is added to enhance the intensification capability. A diversity controlling mechanism is applied to maintain the diversity of the population. In addition, a speed-up method is presented to reduce the computational effort needed for the local search technique and the NEH-based heuristics. A comparative evaluation is carried out with the best performing algorithms from the literature. The results show that the proposed EDA is very effective in comparison after comprehensive computational and statistical analyses.This research is partially supported by the National Science Foundation of China (60874075, 70871065), and Science Foundation of Shandong Province in China under Grant BS2010DX005, and Postdoctoral Science Foundation of China under Grant 20100480897. Ruben Ruiz is partially funded by the Spanish Ministry of Science and Innovation, under the project "SMPA-Advanced Parallel Multiobjective Sequencing: Practical and Theoretical Advances" with reference DPI2008-03511/DPI and by the IMPIVA-Institute for the Small and Medium Valencian Enterprise, for the project OSC with references IMIDIC/2008/137, IMIDIC/2009/198 and IMIDIC/2010/175.Pan, Q.; Ruiz García, R. (2012). An estimation of distribution algorithm for lot-streaming flow shop problems with setup times. Omega. 40(2):166-180. https://doi.org/10.1016/j.omega.2011.05.002S16618040

    Problem specific heuristics for group scheduling problems in cellular manufacturing

    Get PDF
    The group scheduling problem commonly arises in cellular manufacturing systems, where parts are grouped into part families. It is characterized by a sequencing task on two levels: on the one hand, a sequence of jobs within each part family has to be identified while, on the other hand, a family sequence has to be determined. In order to solve this NP-hard problem usually heuristic solution approaches are used. In this thesis different aspects of group scheduling are discussed and problem specific heuristics are developed to solve group scheduling problems efficiently. Thereby, particularly characteristic properties of flowshop group scheduling problems, such as the structure of a group schedule or missing operations, are identified and exploited. In a simulation study for job shop manufacturing cells several novel dispatching rules are analyzed. Furthermore, a comprehensive review of the existing group scheduling literature is presented, identifying fruitful directions for future research

    Native metaheuristics for non-permutation flowshop scheduling

    Get PDF
    The most general flowshop scheduling problem is also addressed in the literature as non-permutation flowshop (NPFS). Current processors are able to cope with the combinatorial complexity of (n!)exp m. NPFS scheduling by metaheuristics. After briefly discussing the requirements for a manufacturing layout to be designed and modeled as non-permutation flowshop, a disjunctive graph (digraph) approach is used to build native solutions. The implementation of an Ant Colony Optimization (ACO) algorithm has been described in detail; it has been shown how the biologically inspired mechanisms produce eligible schedules, as opposed to most metaheuristics approaches, which improve permutation solutions. ACO algorithms are an example of native non-permutation (NNP) solutions of the flowshop scheduling problem, opening a new perspective on building purely native approaches. The proposed NNP-ACO has been assessed over existing native approaches improving most makespan upper bounds of the benchmark problems from Demirkol et al. (1998)

    A new approach for cell formation and scheduling with assembly operations and product structure

    Get PDF
    In this paper, a new formulation model for cellular manufacturing system (CMS) design problem is proposed. The proposed model of this paper considers assembly operations and product structure so that it includes the scheduling problem with the formation of manufacturing cells, simultaneously. Since the proposed model is nonlinear, a linearization method is applied to gain optimal solution when the model is solved using direct implementation of mixed integer programming. A new genetic algorithm (GA) is also proposed to solve the resulted model for large-scale problems. We examine the performance of the proposed method using the direct implementation and the proposed GA method. The results indicate that the proposed GA approach could provide efficient assembly and product structure for real-world size problems

    A review of lot streaming in a flow shop environment with makespan criteria

    Get PDF
    [EN] Purpose: This paper reviews current literature and contributes a set of findings that capture the current state-of-the-art of the topic of lot streaming in a flow-shop. Design/methodology/approach: A literature review to capture, classify and summarize the main body of knowledge on lot streaming in a flow-shop with makespan criteria and, translate this into a form that is readily accessible to researchers and practitioners in the more mainstream production scheduling community. Findings: The existing knowledge base is somewhat fragmented. This is a relatively unexplored topic within mainstream operations management research and one which could provide rich opportunities for further exploration. Originality/value: This paper sets out to review current literature, from an advanced production scheduling perspective, and contributes a set of findings that capture the current state-of-the-art of this topic.This work has been carried out as part of the project “Programación de la Producción con Partición Ajustable de Lotes en entornos de Planificación mixta Pedido/Stock (PP-PAL-PPS)”, ref. GVA/2013/034 funded by Consellería de Educación, Cultura y Deportes de la Generalitat Valenciana.Gómez-Gasquet, P.; Segura Andrés, R.; Andrés Romano, C. (2013). A review of lot streaming in a flow shop environment with makespan criteria. Journal of Industrial Engineering and Management. 6(3):761-770. https://doi.org/10.3926/jiem.553S7617706