    The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review

    Get PDF
    Purpose: The goal of this article is to provide an extensive literature review of the models and solution procedures proposed by many researchers interested on the Project Scheduling Problem with nondeterministic activities duration. Design/methodology/approach: This paper presents an exhaustive literature review, identifying the existing models where the activities duration were taken as uncertain or random parameters. In order to get published articles since 1996, was employed the Scopus database. The articles were selected on the basis of reviews of abstracts, methodologies, and conclusions. The results were classified according to following characteristics: year of publication, mathematical representation of the activities duration, solution techniques applied, and type of problem solved. Findings: Genetic Algorithms (GA) was pointed out as the main solution technique employed by researchers, and the Resource-Constrained Project Scheduling Problem (RCPSP) as the most studied type of problem. On the other hand, the application of new solution techniques, and the possibility of incorporating traditional methods into new PSP variants was presented as research trends. Originality/value: This literature review contents not only a descriptive analysis of the published articles but also a statistical information section in order to examine the state of the research activity carried out in relation to the Project Scheduling Problem with non-deterministic activities duration.Peer Reviewe

    A Simulation-based Approach for Solving Temporal Markov Problems

    Get PDF
    Time is a crucial variable in planning and often requires special attention since it introduces a specific structure along with additional complexity, especially in the case of decision under uncertainty. In this paper, after reviewing and comparing MDP frameworks designed to deal with temporal problems, we focus on Generalized Semi-Markov Decision Processes (GSMDP) with observable time. We highlight the inherent structure and complexity of these problems and present the differences with classical reinforcement learning problems. Finally, we introduce a new simulation-based reinforcement learning method for solving GSMDP, bringing together results from simulation-based policy iteration, regression techniques and simulation theory. We illustrate our approach on a subway network control example

    The safety case and the lessons learned for the reliability and maintainability case

    Get PDF
    This paper examine the safety case and the lessons learned for the reliability and maintainability case
    • …